ML18029A853
| ML18029A853 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/30/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Parris H Tennessee Valley Authority |
| Shared Package | |
| ML18029A854 | List: |
| References | |
| NUDOCS 8509160197 | |
| Download: ML18029A853 (3) | |
See also: IR 05000259/1985042
Text
AUG 30
1985
Valley Authority
v ATTN:
Mr. H.
G. Parris
Manager of Power
and
Engineering
(Nuclear)
!
6Nll B Missionary Ridge Place
1101 Market Street
Chattanooga,
TN
37402-2801
Gentlemen:
SUBJECT:
REPORT
NOS. 50-259/ 5-42, 50-260/85-42,
AND 50-296/85-42
On
August
12-16,
1985,
NRC
inspected
activities
authorized
by
NRC Operating
License
Nos.
and
DPR-68 for your Browns Ferry facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members
of
your staff identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of 'selective
examinations
of procedures.
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
t
Within the
scope of the inspection,
no violations or deviations
were identified.
In accordance
with Section
2.790
of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the NRC's Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report Nes.
50-259/85-42
50-260/85-42,
and 50-296/85-42
cc w/encl:
(See
page
2)
gSOVl60197
8>o~o>>+
- DOCK 05Oo
6
Valley Authority
cc w/encl:
JJ.
A. Coffey,
Browns Ferry
Nuclear Plant Site Director
L. Lewis, Acting Plant Manager
.
W. Whitt, Chief
Nuclear
Safety Staff
L. Williams, Jr.
Supervisor,
Licensing Section
v R.
E. Rogers,
Project Engineer
b~c w/encl:
ARC Resident
Inspector
Document Control
Desk
State of Alabama
Q. J. Clark, Licensing
Project Manager,
ORB ¹2
RII
RII
ol
>ns W CHosey
8%'7/85
8+ /85
RII
DColl ns
8/~/85
RII
FCantr el 1
8/)$85