Text
ri~
Wt
'I REGULATORY i, ORMATION DISTRIBUTION SY
..M (RIDS)
ACCESSION NBR'8501180518 DOC ~ DATE: 84/12/2g, NOTARIZED:
NO DOCKET' FACIL:50 259 Browns Fer ry Nuclear Power Stationi Unit ii Tennessee 05000259 50<<260 Browns Ferry Nuclear Power Stationi Unit 2<
Tennessee 05000260 50-296 Browns Ferry Nuclear Power Stationg Unit 3< Tennessee 05000296 AUTH INANE AUTHOR AFFILIATION YERRELLI<DiM~
Region 2i Office of Director REC IP, NAME RECIPIENT AFFILIATION PARRIsiH.Go Tennessee Valley Authority
SUBJECT:
Notifies of schedule of operator license exams for wk of 850008
~ Ref matl from list in Encl 1 requested by 850208
'pplications requested at least 60 days" prior to exam.NRC requirements for exam administration encl'ISTRIBUTION CODE:
M003L COPIES RECEIVED:LTR ENCL SIZE';
TITLE: Operator Requalification Program NOTES:NMSS/FCAF
- 1cy, 1cy NMSS/FCAF/PM.
OL;06/26/73 NMSS/FCAF 1cy, 1cy NMSS/FCAF/PM'L:06/28/74 NMSS/FCAF 1cy.
1cy NMSS/FCAF/PM.
OL:07/02/76 05000259 05000260 05000296'ECIPIENT ID CODE/NAME NRR ORB2 BC INTERNAL: ACRS 08 NRR/DHFS/OLB 01 RGN2 COPIES LTTR ENCL" 1
1 10 10
?
2 1
1 RECIPIENT ID CODE/NAME CLARKiR QB ILE 04 COPIES LTTR ENCL' 1
1 1
1 1
EXTERNAL: LPDR NSIC NOTES'3 05 1
1 1
1 2
2 NRC PDR 02 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 22
C' 1
'I
, II
'll t
'i l
IH II C'i
December 24, 1984 Tennessee Valley Authority ATTN:
Mr. H.
G. Parr is Manager of Power and Engineering 500-A Chestnut Street, Tower II Chattanooga, TN 37401 Gentlemen:
SUBJECT:
OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. R.
G. Jones, Browns Ferry Training Supervisor, and Mr. S. Guenther, Operator Licensing Section, arrangements were made for the administration of licensing examinations at the Tennessee Valley Authority, Browns Ferry Nuclear Plant.
The written, plant oral, and simulator examinations are scheduled for the week of April 8, 1985.
In order for us to meet the above schedule, it will be necessary for the facility to furnish the selected reference material from the approved list in Enclosure 1
by February 8, 1985.
Any delay in receiving this material will result in a delay in administration of the examinations.
Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination date requested by the various facilities.
Therefore, missing the February 8,'985, deadline even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities.
Mr. Jones has been advised of our selected reference material requirements, the number of reference material sets that are required, and the examiners'ames and addresses where each set is to be mailed.
~ ~
This request for information was approved by the Office of Management and Budget under a blanket clearance number 3150-0101 which expires on June 30, 1986.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, DC 20503.
The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations., "Administra-tion of Operator Licensing Written Examinations,"
describes our requirements for conducting these examinations.
Mr. Jones has also been informed of these require-ments.
All operator and senior license applications should be submitted on Form NRC-398 at least 60 days prior to the first examination date so that we will be able to review the training and experience of the candidates, process the medical certi-fications, and prepare final examiner assignments after candidate eligibility has been determined.
850il80518 841224
)
PDR ADOCK 05000259 U
PDR 4tl
ye ~
4 fd
) ) I III "4 W'W
)$ ~)1 44 I,
'P If,,( '>44
),
W
)lfff'J,'.)
4 c
j
~
I I
hl 44 ff' 4 I h, 1
ef
)f IHWH~ I rl Ht)
- 4' PW le 4 I
~ 4 I,I 1
I f I I
~
Il H
4 I
M e
i'
'I >il1 7 4
~ ") 4 If'I)
I 4
~
I 4
4
~
~
~ f etch pf r wr rl I Wj, f,ge,),
)
)e 4'f l
I H,l let ~,
~
\\ 4 I tf )
4g )
)
)
C P
I 4
i
.I I W
~ "
e ll)
~ 4 fc Il
~
fdl
$ )1 tI jc
f)>
'4) 1 c
44
. >>)
I'h)w>>
I IH'4 4
4 t
'I4';4 I
I'4 I flf
) ~ f p"If I r[
~
i)
II t 4
W Ile' I Il W)f.le Id-)
4 HPI
'Wpt I,)
f" f
" 'f,')
I))l W,W W.;")
y'4 f I 4
, W-Mf r'
ce>> <<4;>>4>>,
. ~,'
f II
'I'
~ WH ~ Qdf I
Y )
)
) )I gwwf,
'l)H
)
"f Mt
)f 1 ", 'j">>41)
He'l
)) W)SW Hg tv ff 4
~
I I
~ f I I
I f')')4 I
h,l
)I~J)$ QQ'I f
I'il
)
444 '
fv 4
C k
4 4
l t
'l I
Vd AC
~
t
'Wr)QH'I
'elt
~ "4 4
1 4
"4<f r
'\\ 4'I I
44 II
+ ~ l
'4 4
~,
I M
I dk
~ 4 l)'
I It "I e,l f $)+-))>>
r),44)4
,"1
I'I r,
I I
~
- 3 I
",, ll,/II W
4
". 4)) 'tfc l 4).4'I l,pf'll I,
)
W )
)
4 If
)4 I
")41 I
t)
If 4(
)H g>l told W '"4 ftllf
)ff ftc
'I
')
)C le II/) tp 4
) 'l "Q
W "4 'l,l=,
41 W
)'
I 1*
Clh f tt))HXW Hlj I
IIW 'tl I
')fe t c
WP fe
> f4
> f)h" ) ')II I 0 d,ci
~
.Itf 1 1 i
4 1I 4
I, h
Tennessee Val 1 ey Authority December; 24, 1984 Thank you for your consideration in this matter.
If you have any. questions regarding the examination procedures and requirements, please contact Mr. Bruce A. LIilson, 404/221-5542, or Mr. S. Guenther, 404/221-4180.
Sincerely, (Original signed by DMVerrelli)
David M. Verrelli, Chief Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
1.
Reference Material Requirements 2.
"Administration of Operator Licensing Written Examinations" cc w/encls:
R.
G. Jones, Training Supervisor G. T. Jones, Plant Manager bcc w/encls:
Senior Resident Inspector Document Control Desk roofreader 12//f/84 R I w:ef 12//f/84 R
RI RII RII SGu nther BALI son AFGibson DMVerrelli 12/p/84 12/(g/84 12/$ /84 12/~) /84
I
~
l U
g P II
~
ENCLOSURE 1
REFERENCE MATERIAL REQUIREMENTS FOR REACTOR/SENIOR REACTOR OPERATOR LICENSING EXAHINATIONS 1.
Procedure Index (alphabetical by subject) 2.
All administrative procedures (as applicable to reactor operation or safety) 3.
All integrated plant procedures (normal or general operating procedures) 4.
Emergency procedures (emergency instructions, abnormal or special procedures) 5.
Standing orders (important orders that are safety related and may supersede the regular procedures) 6.
Fuel-handling and core-loading procedures (initial core-loading procedures when appropriate) 7.
Annunciator procedures (alarm procedures, including set points) 8.
Radiation protection manual (radiation control manual or procedures) 9.
Emergency plan implementing procedures 10.
Technical specifications I
11.
Lesson Plans (training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics, etc.)
\\
12.
System operating procedures 13.
Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams 14.
Technical Data Book and/or plant curve information as used by operators 15.
Any other material the examiner feels is necessary to adequately prepare a
written examination, such as reactor traces of significant plant evolutions 16.
guestions and answers that licensee has prepared (voluntary by licensee)
I
~W
Enclosure 1
17.
Malfunction and initial condition material for simulator (if applicable)
All of the above reference material should be approved, final issues and should be so marked.
Uncontrolled, preliminary, or other such issues will not be acceptable except for cold-license examinations.
If a cold-license plant has not finalized some of the material, the chief examiner is respons-ible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.
All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents so that they can be used efficiently.
ENCLOSURE 2
ADMINISTRATION OF OPERATOR LICENSING WRITTEN EXAMINATIONS NRC Requirements:
l.
A single room shall be provided for completing the written examination.
The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility/contractor personnel during the dura-tion of the written examination.
If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building.
Obtaining this room is the responsibility of the licensee.
2.
Minimum spacing is one candidate per 5
X 24 ft., minimum size table with 3 foot spacing between tables.
No wall charts,
- models, and/or other train-ing materials shall be present in the examining room.
3.
Suitable arrangements are to be made by the facility for the candidates to have lunch, coffee, etc.
These arrangements will be reviewed by the examiner and/or proctor.
4.
The facility shall arrange to have a maximum of one facility staff member per section available to review the examination questions and answer key.
This review will only begin after the completion of the written examina-tion and normally be limited to two hours per examination (RO, SRO).
5.
The faoility will provide sealed pads of paper for each candidate's use in completing the examination.
All reference material needed to complete the examination will be furnished by the examiner.
Candidates can bring calcu-lators or slide rules but no other equipment or reference material to the examination room.
6.
Only black ink or dark pencil should be used for writing answers to questions.
7.
Candidates will be asked to provide positive identification at the start of the written examination.