ML18026B131
| ML18026B131 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/27/1984 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Tennessee Valley Authority |
| Shared Package | |
| ML18026B132 | List: |
| References | |
| DPR-33-A-104, DPR-52-A-098 NUDOCS 8408130032 | |
| Download: ML18026B131 (10) | |
Text
<~~ ~~a>,C~
+0 Po
. p%~
E 0
Ec Pp
/~
~ ga>
~+*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-259 BROWNS FERRY NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
104 License No. DPR-33 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated August 24, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities, authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance 'of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No.
DPR-33 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B,
as revised through Amendment No. 104, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
8408130032 840727
,PDR ADOCK 05000259 P
i l
W
[
r
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch t2 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 27, 1984
ATTACHMENT TO LICENSE AMENDMENT NO. 104 FACILITY-OPERATING LICENSE NO.
DPR-33 DOCKET NO. 50-259 Revise Appendix A as follows:
Remove page 245 and replace with revised page 245 Remove 245 Insert 245 The marginal lines on this page denote the area being changed.
t t
LI:'lITI'NG CONDITIO.'JS:-O.. OPERATION SURVEILLANCE REQUIP=VENTS j ~ 7 E.'OHI'AINilENT SYSTE. IS 4.7 COhNINHENT SYSTEMS 3.
C ~
System flew xate shall be sho~n to be within
+10% design flaw when tested in accordance with ANSI H51 0-1975.
If these conditions cannot he met.
reactox'hutdc'~
shall he initiated and all reactors shall be in cold shutdown within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> for reactor operations and refueling operations shall h= terminated wi'thin 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />'s ~
From and after the date that one ot the can trol room emergency pressuxixation systems is made or found to he inoporahle for any
- reason, reactor operation or rexueling operations is permissible only during the succeeding 7 days unless such circuit is soonex made operable.
c d.
Halog nates hydxocarhan testing shall he performed after each complete or partial replacement of the chaxcoal adsort r hank or after any s tructura1 maintenance on the system housing.
Each circuit shall he operated
.~t least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> overy month.
At least anc pe operating cycle nat to exceed 18 manths, autamatic ini"iation of the contxol roam emergency pressurization system shall be demonstrated.
During th s mu'a ed automatic actuation test of this system (see Table
- 4. 2. G), it shall be verified that the fallowing dampers ocex'ate as indicated:
Close:
Open:
FCO-150 a,
D, E,
and F
FCO-151
+CO-152 245 Amendment No.
104
gp,S AEQ(g
~C+,
Wp0 cv
~+i ba I
~w>
I 0
+Y
<4<v" 4~**4 UNITED STATES NUCLEAR R EG ULATORY COMMISS ION WASHINGTON, O. C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS FERRY NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
98 License No.
DPR-52 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated August 24, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the, activities agthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No. DPR-52 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
98, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
2 3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION B.,lq7f.
/I
~g
~
~
r Domenic B. Vassallo, Chief Operating Reactors Branch ¹2 Division of Licensing
Attachment:
Changes to the Technical Speci fications Date of Issuance:
July 27, 1984
I
ATTACHMENT. TO LICENSE AMENDMENT NO.
g8 FACILITY OPERATING LICENSE NO.
DPR-52 DOCKET NO. 50-260 Revise Appendix A as follows:
Remove page 245 and replace with revised page.
Remove 245 Insert 245 The marginal lines on this page denote the area being changed.
CONOKTXO lS OR OPER iTION SUP)EI LLANCZ RZQ'-'I. "-i"c N<<
< orcrALNSLNT.'~T::.:~:
4 7
COh CA INHcVT SYST=~S 3.
C ~
System f icw rate shall be sho~n to be within
+ 1G des ign f low when tested in accordance with ANSI N~10-1975.
t t thi~::e con~.'1t1ons cannot be m~t, reactor nhutdcn shall Le initla ted and 41L reactors shall he ir. cold shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> r or reactor operations and refuel ing operations shall b: terminated within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
From and after the date that one of the con trol room emergency pressuri=a tion systellls is made or found to b
inopi cable for any r~..~ son, reac..or operation or refueling o p ~rati ons is permissible only durin'he succeeding 7 days unless such circuit is sooner made operable.
3.
4 c
Ha log:n i".9'>
hydrocarcon testirg shall be performed after each complete or partial replacement o..
the charcoal adsorber tank or after any structurRl mainl.enanco.
on the syst~m housing.
d ~
Fach c1 r <<ll l 4 shall L.
operated at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> overy month.
At least once per operatinq,cycle not to exceed 13 mcntits, automa t ic i.ni iat ion of the con t ro L room emergency P assur 1 t<1.. 10h Sy item shal l. be demonstrate l.
Dur 1ng the
~ "u-a'ed autcmatic ac"uation test of this syuem (see Table
- 4. 3. G), it shall be verified tha t the fo liowin@
dampers c"crate as indica ted:
Clo e:
Oper.:
FCO-150 B,
D, E,
and F
ECO-151 ECO-1 )2 245 Amendment 98