Text
FFICIAL RECORD COPY February 3,
1984 IE HQ pz>E go~
Tennessee Valley Authority ATTN:
Mr. M.
G. Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:
SUBJECT:
MEETING
SUMMARY
BROl'fNS FERRY NUCLEAR PLANT UNITS 1, 2
AND 3 DOCKET NOS. 50-259, 50-260 AND 50-296 This refers to the meeting held with members of your staff in Region II on January 18, 1984, at your request to discuss your plans for strengthening the program for requalification of licensed operator and senior operator personnel at the Browns Ferry Nuclear Plant.
It is our opinion that this meeting was beneficial and has provided for a better mutual understanding of these programs.
Your cooperation with us is appreciated.
In accordance with Section 2.790 of NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and enclosure will be placed in the NRC's Public Document Room.
Should you have any questions concerning these
- matters, we will be pleased to discuss them.
Sincerely, (Original signed by RCLewis)
Enclosure:
fteeting Summary cc w/encl:
G. T. Jones, Plant Manager Browns Ferry Nuclear Plant bcc w/encl:
NRC Resident Inspector Document Control Desk State of-Alabama Richard C. Lewis, Director Division of Project and Resident Programs QZI RII RII RI I ~f
~ (1r Honro:sa GAllilson YAFGib'son 01/as /84 01/RI, /84 01/+84 S4OSIAO494 Soosoh PDR ADOCK 05000259 V
PDR RII ) g JAOlsliinski 01/g+84 DHVerre11>
RCLewss 01/1 $ 84 01/g[ /84
C~
ENCLOSURE MEETING
SUMMARY
LICENSEF.:
Tennessee Valley Authority FACILITY:
Browns Ferry Nuclear Plant, Units I, 2 and 3
LICENSE NOS.:
DPR-33, DPR-52 and DPR-68 DOCKET NOS.:
50-259, 50-260 and 50-296 SUBJECT'E(UALIFICATION PROGRAM IMPROVEMENTS FOR LICENSED OPERATORS 1.
Subjects Discussed:
Licensee representatives discussed their plans for providing additional training to operators and senior operators at the Browns Ferry Nuclear Plant in order to achieve immediate improvements in the operator requalification program at that site.
This training would be provided to the majority of licensed operators.
Justification was provided for the exclusion of certain licensed operators from this program.
The licensee indicated that this improvement program should resolve questions concerning the competence of Browns Ferry licensed operators.
NRC staff agreed that these plans should upgrade the requalification program;
- however, the staff stated that NRC requalification examinations would be required to evaluate the effectiveness of these actions as well as the entire requalification program.
These examinations will be administered on March 23, 1984 and during the week of March 26, 1984.
Licensee representatives stated that they were considering administering written examinations
- to those individuals who completed their upgraded requalification program.
They agreed to submit a letter detailing their final plans for requalification program improvements.
2.
Meeting Attendance:
Tennessee Valle Authorit H. Abercrombie, Assistant
- Manager, Nuclear Production R. Johnson, Chief, Nuclear Training Branch R. Parker, Chief, guality Engineering Branch C.
Noe, Supervisor, Operator Training, Nuclear Training Branch J. Swindell, Assistant Power Plant Superintendent, BFNP J.
Domer, Supervisor, Boiling Hater Reactors, Nuclear Licensing Staff
Enclosure Nuclear Re ulator Commission,~Re ion II J. Olshinski, Director, Division of Engineering and Operational Programs A. Gibson, Chief, Operational Programs Branch D. Verrelli, Chief, Project Branch I B. Wilson, Chief, Operator Licensing Section F. Cantrell, Chief, Project Section 1B J.
Munro, Operator Licensing Examiner G. Paulk, Senior Resident Inspector, Browns Ferry Nuclear Plant