MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20151W4951998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs for Region I IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20202F5501998-07-17017 July 1998 Responds to PP&L Corp Auditing Repts 739459-97,739459-1-97 & 739459-2-98 Re SSES Investigations Into Missed Alarm Tests ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML20202H1331998-04-16016 April 1998 Partially Deleted Ltr Re Concerns Raised to NRC Concerning PP&L Susquehanna Facility NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable1998-04-15015 April 1998 Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable ML20216B6811998-04-0101 April 1998 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Released in Entirety ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20203M5071998-02-26026 February 1998 Final Response to FOIA Request for Documents.Records in App a Being Placed in PDR & Encl.Records in App B Partially Withheld (Ref FOIA Exemption 6) ML20203B5931998-02-23023 February 1998 Ack Receipt of & Wire in Amount of $55,000 in Payment for Civil Penatly Proposed by NRC Ltr . Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing1998-02-18018 February 1998 Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing ML20203M5791998-02-10010 February 1998 Enters Appeal Due to Lack of Response to FOIA Request 97-473 ML18030A0971998-02-0202 February 1998 Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 ML20203G6071998-01-26026 January 1998 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept IR 05000387/19970031998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18030A4071998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18017A2931998-01-0606 January 1998 Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny1997-12-29029 December 1997 Expresses Appreciation for Support Received by Former Project Manager C Poslusny IR 05000387/19970041997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML18026A4901997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML20203M5741997-12-0505 December 1997 FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept1997-12-0404 December 1997 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept 1999-09-08
[Table view] |
Text
41 eLWW McasWeao eas ~
'I (ACCELERATED RZDS PROCESSZNG) 4 .g cN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9509070111 DOC.DATE: 95/06/23 NOTARIZED: NO DOCKET FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 E 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION PRXCE,A.M. Pennsylvania Power & Light Co.
RECXP.NAME RECIPIENT AFFILIATION KEMIG,R. Region 1 (Post 820201)
SUBJECT:
Forwards exercise manual for Susquehanna Electric Station 1995 NRC observed exercise for review.
DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR I ENCL X'IZE:
Action Ltr/Exercise TITLE: Emergency Preparedness-Appraisal/Confirmatory Rep NOTES: 05000387 RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: AEOD/DOA/XRB 1 1 1 1 NRR/DIS P/PIPB 1 1 RP PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 RGN1 FILE 01 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTES NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED)
TOTAL NUMBER OF COPXES REQUIRED.: LTTR 12 ENCL
~ GiEI ~
PENNSYLVANIAPOWER & LIGHT COMPANY EMERGENCY OPERATIONS FACILITY R.R. ¹1, BOX 1646, BERWICK, PA 18603-9989 Telephone: 717-542-3300 June 23, 1995 Attention: Mi. R. Kemig U. S. Nuclear Regulatory Commission Region I Emergency Preparedness Section Division of Radiation Safety and Safeguards 475 Allendale Road King of Prussia, PA 19406
Dear Mr. Kemig:
Three copies of the exercise manual for the Susquehanna Steam Electric Station 1995 NRC Observed Exercise are enclosed for your review.
If you have any questions or concerns please contact me, or Russ Halm at (717) 542-3603.
Sincerely, Anthony . rice Supervis -Nuclear Emergency Planning rhh:mm Enclosures (3) cc: 'NRC Resident Inspectors PDR F
ADOCK t
'P509070iii S'50623 05000387 PDR Tahe Care
/ gl
PRXORXTY (ACCELERATED RZDS PROCESSZN REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9508150089 DOC.DATE: 95/08/11 NOTARIZED: YES DOCKET g FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 P 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION BYRAM,R.G.
RECIP.NAME ,,
Pennsylvania Power RECIPIENT AFFILXATION
& Light Co.
Document Control Branch (Document Control Desk) ~~
SUBJECT:
Informs of proposed changes to TS for plant, which implemented provisions of GL 86-10 re relocation of fire protection program from TS to another controlled document following guidance of GL 88-12. R DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR t ENCL / SIZE: 1+
TITLE: OR Submittal: General Distribution NOTES 05000387 T
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-2 LA 1 1 PD1-2 PD 1 1 POSLUSNY,C 1 1 XNTERNAL: ACRS 6 6 E CENT 01 1 1 NRR/DE/EMCB 1 1 NRR DRC HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 D EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTES 1 1 N
NOTE,TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083)'O ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(
TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 18
n Pennsylvania Power & Light Company Two North Ninth Street ~ Allentown, PA 18101-1179 ~ 610/774-5151 Robert G. Byram Senior Vice Presir/enl-Nuclear 610/774-7502 Fax: 610/774-5019 AUG 11 1995 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Mail Stop P1 - 137 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENTNO. 189 TO LICENSE NPF-14 AND PROPOSED AMENDMENTNO. 146 TO LICENSE NPF-22:
, REMOVALOF FIRE PROTECTION REQUIREMENTS FROM TECHNICALSPECIFICATIONS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 The purpose of this letter is to propose changes to Technical Specifications for Susquehanna Steam Electric Station (SSES), Units 1 and 2, which implement the provisions of Generic Letter 86-10 related to the relocation of the plant's Fire Protection Program from the technical specifications to another controlled document (Technical Requirements Program) following the guidance of Generic Letter 88-12.
An assessment is attached which discusses the safety basis for this proposed change and concludes that the change involves no significant hazards. The change has been reviewed by the Plant Operations Review Committee and the Susquehanna Review Committee. The proposed change meets the Cost Beneficial Licensing Action criteria as outlined in NRC Administrative Letter 95-02. The NRC previously approved a proposed change of similar nature in a SER dated February 1, 1995 for Connecticut Yankee Atomic Power Company's Haddam Neck Station.
Attachment 1 presents the marked-up copy of the affected Technical Specifications.
We request issuance of the proposed amendments at your earliest convenience with the amendments effective as of the date of issuance, to be implemented within 60 days of issuance.
If you should have any questions on the above, please contact Mr. W. W. Williams at (610) 774-7742.
ruly yours, R. . yr Attachment 0O(
'75081.50089 950811 PDR ADOCK 05000387 P PDR
FILES R41-2/A17-2 PLA-4352 Document Control Desk copy: Regional Administrator - Region I Ms. M.Banerjee, NRC Sr. Resident Inspector Mr. C. Poslusny, Jr., NRC Sr. Project Manager Mr. W.P. Dornsife, Pa. DER
ATTACHMENTTO PLA-4352
, Page 1 of 5 SAFETF ASSESSMENT REMOVAL OF FIRE PROTECTION REQUIREMENTS FROM TECHNICAL SPECIFICATIONS Sackgt:@and n
The standard fire protection license condition suggested by Generic Letter 86-10 has been included in the Susquehanna SES Units 1 and 2 facility operating licenses as conditions 2.c.(6) for Unit 1 and 2.c.(3) for Unit 2. These conditions preclude changes to the approved Fire Protection Program without prior Commission approval if those changes would adversely affect the ability to achieve and maintain safe shutdown conditions in the event of a fire.
The proposed change specifically addresses relocation of Fire Protection requirements from the Technical Specifications to the Technical Requirements Program. The Susquehanna Technical Requirements Program is being established to provide the means for controlling those plant operating conditions deemed important to safe and efficient operation of the plant but not directly concerned with Design Bases Accident (DBA) prevention or mitigation. The program will cover systems and components that are a part of the licensing basis, as described in the FSAR, but do not meet the criteria of the NRC policy statement for inclusion in the Technical Specifications.
Technical Requirements established by this program are commitments to control important plant equipment and operating conditions not controlled elsewhere. These requirements are derived from former Technical Specifications, FSAR commitments and other operational related requirements. Adherence to the requirements, actions, and testing requirements in the Technical Requirements Program is mandatory. The Vice President-Nuclear Operations is responsible for ensuring compliance witliTechnical Requirements throughout the plant organization.
In addition, the proposed'change revises Technical 'Specifications to include the requirement for a program and procedure to implement the Technical Requirements Program, and also revises Technical Specifications to add the requirement for the Plant Operations Review Committee to review all proposed changes to the Technical Requirements Program and to forward copies of reviewed changes to the Susquehanna Review Committee (6.5.1.6n).
The proposed change will not affect the substance of the Fire Protection Program, system operability requirements,-compensatory (remedial) actions, surveillance requirements, system bases, or fire brigade staffing.
In accordance with Generic Letter 86-10, Technical Specification provisions related to the Fire Protection Program are being relocated from Technical Specifications to another controlled document, the Susquehanna Technical Requirements Manual. Future changes to the Technical Requirements Manual will be subject to the requirements of 10CFR50.59. Further, changes to Technical Specification Section 6 (Administrative Controls) to include review of changes to the Technical Requirements Program, provide that any changes to the Fire Protection Program and
.9508150089'
ATTACHMENTTO PLA-4352 Page2of5 implementing procedures are reviewed. by. the Plant Operations Review Committee (PORC). *The Susquehanna Technical Requirements Manual is a PP&L initiative which ensures that fire protection limiting conditions -for operation, surveillance requirements, and their bases are adequately controlled and maintained following their relocation from Technical Specifications.
The following changes are proposed to be made to Technical Specifications:
Technical Specifications 3.3.7.9, Fire Detection Instrumentation; 3.7.6, Fire Suppression Systems; and 3.7.7, Fire Rated Assemblies with their associated Bases, will be relocated in their entirety to the Technical Requirements Manual.
Technical Specification 6.2.2e relating to the site Fire Brigade will be relocated into the Technical Requirements Manual.
Three additions will be made to Technical Specification Section 6.0. Technical Specification 6.5.1.6n will be added to include PORC review of all proposed changes to the Technical Requirements Program and submittal of all approved changes .to the Susquehanna Review Committee. Technical Specification 6.8.1j. will be added to include the requirement to establish, implement, and maintain written procedures for the implementation of the Technical Requirements Program. Technical Specification 6.8.2 will be changed to add the requirement for the Vice President-Nuclear Operations to review the procedure implementing the Technical Requirements Program in accordance with Specification 6.5.1.6 or 6.5.3, and "approve prior to implementation and periodically as set forth in administrative procedures.
The proposed change recognizes the Technical Requirements Program. The Technical Requirements Program is a commitment to control important plant equipment and operating conditions not controlled elsewhere. The operating restrictions and testing included in the Technical Requirements Program and procedures for the Fire Protection requirements being relocated are equivalent to those which were in Technical Specifications. Fire protection features necessary to satisfy the fire protection guidelines and requirements of Appendix A to BTP APCSB 9.5-1 and Paragraphs IIIG, j, 0, and L of Appendix R to 10 CFR Part 50 previously committed to for Susquehanna SES have not been changed in conjunction with their removal from Technical Specifications and the scope of fire protection features receiving surveillance has not been reduced.
Plant procedures will continue to provide the specific instructions necessary for the implementation of the specific requirements, just as when the requirements resided in the Technical Specifications.
Fire Protection Program. commitments, reporting requirements and amendments will by this process be transferred from the jurisdiction of 10 CFR 50.73 and 10 CFR 50.90 to 10 CFR 50.59. All changes to the Fire Protection Review Report are provided to the NRC for their review.
Additionally, Susquehanna SES, Units 1 and 2, License Conditions require compliance with the provisions of the fire protection program as described in the Fire Protection Review Report which ensures enforcement of the fire protection requirements. The proposed changes are in accordance with the guidance provided in Generic Letter 86-10 "Implementation of Fire Protection Requirements" dated April 24, 1986, and Generic Letter 88-12, "Removal of Fire Protection
ATTACHMENTTO PLA%352 Page 3 of 5 Requirements from Technical Specifications," dated August 2, 1988.with the exception that the Technical Requirements Manual rather than the FSAR will contain fire protection related operational conditions, remedial actions, and test requirements. Use of the Technical Requirements Program and its associated manual provides a more visible control mechanism for the Fire Protection Program elements.
Provisions for review of future changes to Technical Requirements are dictated by the changes to Technical Specification 6.5.1.6n. The Plant Operations Review Committee's responsibilities and authority are being revised to provide specific reference to the requirement to review the Technical Requirements Program and changes thereto. This change reinforces the importance of the Technical Requirements Program and the requirements controlled by it and assures a multi-discipline review by the Plant Operations Review Committee of proposed changes to those requirements that are removed from Technical Specifications and placed in the Technical Requirements Program. All new Technical Requirements, and any proposed changes that directly affect the Requirement, Applicability, Testing Requirements, or Action sections of an existing Technical Requirement will be submitted to the Susquehanna Review Committee for information.
All new and proposed changes to Technical Requirements will be reviewed by Licensing and Operations.
The proposed change deletes Unit 1 and Unit 2 Technical Specifications 3/4.3.7.9 (Fire Detection Instrumentation), 3/4.7.6 (Fire Suppression Systems) and 3/4.7.7 (Fire Rated Assemblies) and the corresponding section 3/4 Bases and revises Technical Specification 6.5.1.6n in accordance with the annotated pages provided as Attachments 1 and 2.
The requirements of Technical Specifications 3/4.3.7.9, 3/4.7.6 and 3/4.7.7 have been moved in their entirety to the Susquehanna SES Technical Requirements Program. Additionally, the requirements for the Fire Brigade found in Technical Specification 6.2.2e have also been moved to the Technical Requirements Program. These changes are administrative in nature in that no requirements are being altered.
Technical Specification 6.8, Procedures and Programs, is revised to include the Technical Requirements Program implementation. This change reinforces the importance of the Technical Requirements Program and is consistent with the requirements established for similar programs.
Pursuant to the above, this proposed change does not adversely affect the safe operation of Susquehanna SES.
ATTACHMENTTO PLA-4352 Page 4 of 5 The proposed changes do noti
- 1. Involve a significant increase in the probabi%ty or consequences of an accident previously evaluated.
The proposed change relocates the provisions of the Fire Protection Program that are contained in the Technical Specifications and places them in the Technical Requirements Manual. No requirements are being added or deleted. Review and approval of those portions of the Fire Protection Program contained in the Technical Requirements Manual and revisions thereto will be the responsibility of the Plant Operations Review Committee just as it was their responsibility to review changes to the fire protection Limiting Condition for Operation and Surveillance Requirements when they were part of the Technical Specifications. Approved Technical Requirements or changes thereto are provided to the Susquehanna Review Committee for information. No design basis accidents are affected by the change, nor are safety systems adversely affected by the change. Therefore, there is no impact on the probability of concurrence or the consequences of any design basis accidents.
- 2. Create the possibi%ty of a new or different kind of accident from any previously evaluated.
The proposed changes relocate the provisions of the Fire Protection Program that are contained in the Technical Specifications and places them in the. Technical Requirements Manual. No requirements are being added or deleted by the Technical Requirements Manual. There are no
= ~
new failure modes associated with the proposed changes. Therefore, since the plant will continue to operate as designed, the proposed changes will not modify the plant response to an accident.
- 3. Involve a significant reduction in a margin of safety.
No change is being proposed for the Fire Protection Program requirements themselves. The relevant Technical Specifications are being relocated, and the requirements contained therein are being incorporated into the Technical Requirements Manual. Plant procedures will continue to provide the specific instructions necessary for the implementation of the requirements, just as when the requirements resided in the Technical Specifications. Fire Protection Program changes will be subject to the provisions of 10CFR50.59 and the current fire protection license condition. As such, the changes do not directly affect any protective boundaries nor.does it-impact the safety limits for the boundary. Thus, there are no adverse impacts on the protective boundaries, safety limits, or margin of safety.
Since operability and surveillance requirements will remain in a controlled document, the changes do not reduce the effectiveness of Technical Specification requirements. Any changes to the Fire Protection Program requirements will be made in accordance with the provisions of 10CFR50.59 and the fire protection license condition.
I, ATTACHMENTTO PlAQ352 page 5 of 5 We have reviewed the proposed license amendment against the criteria of 10CFR51.22 for environmental considerations. The proposed changes do not increase the type and amounts of effluents that may be released offsite, nor significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, we have concluded that the proposed changes satisfy the criteria delineated in 10CFR51.22(c)(9) for a categorical exclusion
, from the requirements for an environmental impact statement.
h
~ r IL 1 ~