APPENDIX B NOTICE OF DEVIATION Tennessee Val 1 ey Authority License Nos. OPR-33, OPR-52 5 OPR-68 Based on the results of the NRC inspection conducted on January 26-31, and February 2-6,
- 1981, certain of your. activities appear to deviate from your commitments to the Commission as indicated below:
A.
As stated in TVA correspondence dated Janu'ary 25,
- 1980, in response to IE Reports 50-259, 50-260, and 50-296/79-30, Appendix A, Item E, TVA stated "As a result of TVA' own review,'of its procedures, we will review each
- USQD, including. any revisions, to ensure that each USQD accurately addresses the change before notification to NUCLEAR POWER that ENDES work is completed on the change.
This will provide further assurance that the change is accu-rately evaluated in the USQD.
This procedural change was implemented on December 3, 1979.",
~,
Contrary to the-above,,
a procedure change was implemented to EN OES-EP 2.03 on January 8, 1981, exceeding the commitment date by 13 months.
As stated. in TVA correspondence dated Janaury 25,
- 1980, in response to IE Reports 50-259, 50-260, and 50-296/79-30, Appendix A Item A, TVA stated "Additionally, existing section instructions will be surveyed by the plant quality assurance staff by January 31.,
1980.
The results of these surveys will be documented and reported'to the plant superintendent."
0 Contrary to the
- above, no survey had been conducted by the established
- date, January 31, 1980.
As of this inspection; the survey had not been conducted.