Text
EAR REOO
~c"
+
0
Cy
00
Op
o~
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
MARl 0 1981
Valley Authority
ATTN:
H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
TN
37401
Gentlemen:
SUBJECT:
Report Nos. 50-259/81-03,
50-260/81-03
and 50-296/81-03
This refer'st'o"the ro'uti'ne-'sa'fety inspection
conducted
'by .R
F. Sullivan of'this
".'ffice
on January'1-31,
19'81; of activities authorized
by NRC Operating License
Nos.
and
DPR-68 for the Browns Ferry facility.
Our preliminary
findings were discussed with H. Abercrombie at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was
found that certain activities under your license
~
~
~
~
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed herewith as Appendix A.
,Elements.to
be included in your response
are delineated in Appendix A.
We have
examined
actions
you have
taken with regard
to previously identified
enforcement matters
and unresolved
items.
The status of these items is discussed
in the enclosed report.
- ~,
In 'accordance 'with'ection 2.790 of the
NRC "Rules 'of Practice," Part 2, Title
10,
Code of Federal Regulations,
a copy of this letter and'the enclosed inspection
report will be placed in the
NRC Public Document
Room. If this report contains
any information that you believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold such infor-
mation from public disclosure.
Any such application must include the basis for
claiming that
the
information is proprietary
and the proprietary information
should be contained in a separate
part of the document.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Si:ncerely,
Enclos'ures:
(See
Page
Richard
C.
wis,
Ac ing
irector
Resident.G
Reactor Project Inspection
2)
0
Valley Authority
-2-
Mphil
O 1981
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-259/81-03
50-260/81-03
and 50-296/81-03
cc w/encl:
H. L. Abercrombie, Plant Superintendent
R. E. Rogers,
Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
H. J.
Green, Division Director
'