Forwards IE Insp Repts 50-259/81-07,50-260/81-07 & 50-296/81-07 on 810309-12.No Noncompliance Noted
ML18025B496
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/07/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18025B497 List:
References
NUDOCS 8105120578
Download: ML18025B496 (3)


See also: IR 05000259/1981007

Text

'~'y,g AEQUI

,c~

"Lr,

~ I

+

O~

Cy

A0O

I

cOt

0~

Cp

w+

Cp

t7 ++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA30303"

APR '?

~88>

Tennessee

Val 1 ey Authority

ATTN:.

H. G. Parris

Manager of'Power

500A Chestnut-Street.

Tower II;

Chattanooga,.

TN

37401

Gentlemen:

9

thAYl y 1981

U,S, I@~thR RE~14

g0gglSS~

C>

Subject:

Report Nos.

-259/81-

=260 81"

6 81-

This refers to the routine safety inspection

conducted

by

E.

H. Girard of this

office on March 9-12,

1981, of activities authorized

by

NRC Operating

License

Nos.

DPR-33,

DPR-52 and

DPR-68 for the Browns Ferry facility and to the discus-

sion of our findings held with W.

E. Andrews at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the

inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations- were disclosed.

We

have

examined

actions

you

have

taken with regard

to previously identified"

enforcement matters.

These are discussed

in the enclosed inspection report.

Three

new unresolved

items resulted

from this inspection

and are discussed

in the

enclosed'eport.

These-items will be examined during subsequent

inspections.

In accordance: with Section

2.790 of the

NRC's "Rules- of Practice",

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter- and the enclosed

inspec-

tion report will be placed

in the

NRC.'s Public

Document

Room.

If this report

contains

any information that you (or your contractor) believe to be proprietary,

it is necessary that you make

a written application within 20 days to this office

to withhold such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is claimed that

the

information is proprietary,

and

should

be

prepared

so that proprietary

.

information identified. in the application is contained. in a separate

part of the.

document. If'e do not hear

from you within the specified period,

the report

will be placed in. the Public Document

Room.

Tennessee

Valley Authority,

APRi'ss>

I

Should you have

any questions

concerning this letter;

we will be glad to discuss

them with you.

Sincerely

Encl osure:

Inspecti on Report Nos.

50-259/81-07;

50-260/81-07 and

50-296/81"07

-

". C.,

ct.ing, D rector-

D.iv.ision'o

Resident. and

Reactor Project Inspection

cc. w/encl:

H. J.

Green, Division Director

H. L. Abercrombie, Plant, Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff