Forwards IE Insp Rept 50-296/80-38 on 801202-05.No Noncompliance Noted
ML18025B376
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/04/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18025B377 List:
References
NUDOCS 8103120429
Download: ML18025B376 (4)


See also: IR 05000296/1980038

Text

~g RECy

(4

P

~4

0

O

th

0

++*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION I I

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

FEB 04 ass]

In Reply Refer To:

RII:EHG

Tennessee

Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga,

TN

37401

Gentlemen:

This refers to the inspection conducted by E. H. Girard of this office on December 2-5,

1980,

of activities

authorized

by

NRC Operating

License

No.

DPR-68 for the

Browns Ferry facility, and to the discussion of our findings held with H. L. Abercrombie

at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,.

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is. claimed that the information is. proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C

C. E. Murphy., Chief

Reactor Construction

and Engineering

Support Branch

Enclosure:

(See

Page

2)

,8 $ 08 1 80~~7

P

y bl

~ ~

g

~

9 Pi

1

t

rt

U

f

Tennessee

Valley Authority'2-

F~B 04 1s8)

Enclosure:

Inspection Report No.

50-296/80-38

cc w/encl:

H. L. Abercrombie, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff