LER-1980-008, /03L-0:on 800206,while Conducting Automatic Depressurization Sys Logic Functional Test,Relay 10A-K26 Manually Operated in Place of Relay 2E-K26 Causing Recirculation Pump 2B Trip.Caused by Operator Error |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2601980008R31 - NRC Website |
|
text
U. S. N CLEAR REGIJL,ATORY COMMISSION Qa~ 00 LICENSE TYPE 30 57 CELT 58 NRC FOAQ 3GG Il 27I. ~
e LICENJS44 EVENT RCPPH+
CONTROL BLOCK:~~~ Ql (PLEASE PRINT OR TYPE ALI. REQUIRED INFORMATIONI I
I r>
~OI A
L B
Q2L0 0
o '
Q' 8
9 LICENSEE CODE 14 15 LICENSE iIUMGER 25 26 CON'1
~OI
~LQG 0
5 0
0 0
2 0 Oj 0
2 0
6 8
0 B
0 3
0 6
8
~0QB DOCKET NUMBER GB GJ EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES QIO During normal power operation while conducting SI 4.2.B.44 (ADS Logic Fun ctiona 1 Test ) ~ relay 10A-K26 was erroneous ly manua 1ly operated rather than the intended relay 2E-K26, resulting in recirculation pump 2B tripping and recirculation pump, 2A & 2B discharge valves closing.
Recirculation to the health or safety of the public.
There were no redundant systems.
/, >>/>>,
/>>.
7 8
9 80 SYSTEM
CAUSE
CAUSE COMP VALVE CODE CODE SUGCODE COMPONENT CODE SUBCODE SUGCODE o
9
~~gQII A Q>>
~AQI3 LRRE L
A Y
X Q4
~AQIB
~ZQIG 7
8 9
10 ll 12 13 18 19 20 SEOUENTIAL OCCURRENCE REPORT REVISION I ER/RO EVENT YEAR REPORT No.
CODE TYPE NO.
Q/T
/I ETC/lT ~80
~
~00 8
~~
~03
~L
0 21 22 23 24 2G 77 28 29 30 31 ACI'ION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDuI PRIME COLIP.
COMPONEN r TAKEN ACTION ON PLANT METHOD HOURS +22 SUBSIITTED FOR@I 5UB.
SUPPLIER MANUFACTURER QIB LuQ>>
~Q2O
~2Q"
~ Q>>
~Q24 MQ>>
33 34 35 36 37 40 41 47 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o
The recirculation pumps were tripped due to personnel error caused by poor communication while conducting SI testing.
The error has been discussed with personne involved.
Further corrective action is being investigated.
3 4
7 OTHER srnTUs Q"
8 9
F AC I LITY STATUS WIOWER B
8 QTB ~09 8
Q>B N/A 7
8 9
10 12 11 44 ACTIVITY CONTENT RELEASED OF RELEASE AMPUIJT OF ACTIVITYQB Q
7 8
9 10 11 44 PERSONNEL EXPOSURES L000 00JQ>T 8
Q>B N/IL 7
8 9
11 12 13 tt PERSONNEL INJURIES METHOD OF DISCOVERY DIscovERY DEscRIPTIDN Ai
[ B iQ31 Surveillance Instruction 4.2.%44 45 46>
Bn LOCATION OF RELEASE Q N/A 4 EG 80 7
8 7
8 o
9 11 12 LOSS OF OR DAMAGE TO FACILITY Q43 TQE OESCRIPQ)g 9
10 PUBLICITY ISSUED" DESCRIPTION~
~NQ44 N)A 9
10 80 NRC USI ONLY 80 GB 69 BOOS 1 1o '7 f P 80 I
0 J
Tennessee Valley Authority Browns Ferry Nuclear Plant FOWl 3F"1V BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO 260 / 808 Technical Specification Involved 6.7.2.b (2)
Reported Under Technical Specxfxcatcon Date of Occurrence Time of Occurrence 0420 3.6.F.5 Unit
~
Identification and Descri tion'of Occurrence:
2A and 2B recirculation pumps were tripped.
Conditions Prior to Occurrence:
U-1 8 0, refueling outage.
U-2 8 98%, normal operations conducting SI 4.2.B44 U-'3 8 100%, normal operations Action specified in the Technical Specification Surveillance Requirements met due to ino erable e ui ment.
Describe.
Steady state power operations without recirculation pumps permitted for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (T.S. 3.6.F.5).
SI 4.2.B.44 was terminated and the-plant was returned to normal operation.
A arent Cause of Occurrence:
Relay 10A-K26 was erroneously manually operated, rather than the intended. relay 2E-K26, resulting in recirculation pump 2B tripping and recirculation pumps 2A and 2B discharge valves closing."
Recirculation pump 2A was tripped by the operator.
Anal sis of Occurrence:
There was no hazard to the public health or safety.
Corrective Action
The, error was discussed with personnel involved; --'Thie'rpr'imary'cause,-of 'the error was a, lack.og:communications breakdown.
Future recurrence control actions being investigated".
Failure Data:
260/806>
259/7934$
259/7926
eriod - Lifetime; Responsibility - Administrative Supervisor
~Revision:
I
i REGUL'ATORY I, RMATION DISTRIBUTION SYST M (RIDS)
ACCESSION NBR: 8003110719 DOC ~ DATEt 80/03/06 NOTARIZED!
NO D
E 0
FACIL!50<<260 Browns Ferry Nuclear Power Stationi Uni t 2i Tennessee 0
26 AUTH'AME AUTHOR AFFILIATION Tennessee Valley Authority REC IP, NAME RECIPIENT AFFILIATION Region 2i At 1 antsy Of f ice of the Di r actor
SUBJECT:
LER 80~008/03L; 0:on 800206iwhile,conducting automatic depressurization sys logic functional testirelay 10A K26 manually operated in place of relay 2E K26 causing recirculation pump 2B trip, Caused by operator errors DISTRIBUTION CODE; A002S'OPIES RECEI VED: L>>TR J.>>
ENCL'>> 3 SIZE'.
TITLEj Incident Reports N
C'0 ~
8
+ oowwmmoewwwMWWWwQIIWWwwMMMWMMM~WO~MW~~~mwmge&WWQfOSMMW~WOSMWwmwWwMM~M RECIPIENT ID CODE/NAME" ACT10N>>
05 BC g~ P COPIES LlTTR ENCL RECIPIENT COPIES ID CODE/NAME'TTR ENCL INTERNAL:
09 ILE>>
14 TA/EDO 16 EEB 18" PLANT SYS BR 20 AD PLANT SYS 23 ENGR BR 25 PAR SYS BR 27 OPERA LZC BR 29 AUX>> SYS BR AEOD HANAUEReS ~
JORDANiE',/IE 1
1 2
?
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 02 NRC PDR 11 MPA 15 NOVAK/KNIEL'7 AD FOR ENGR 19 ILC-SYS BR 22'EAC SAFT BR 24 KREGER 26 AD/SITE'NAL(
28 ACDENT ANLYS AD/ORP-DOR DOUG MAY TERA IRELANDiR~
1 1
3 3
1 1
1 1
1 1
1
'1 1
1 1
1 1
~
1 1
1 1
3 3
EXTERNAL: 03 LPDR 29 ACRS 1
1 16 16 04 NSIC 1
1 TOTAL NUMBER OF COPIES REQUIRED!
LTTR 52 ENCL 5?.
p>> ~
~ v e
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000259/LER-1980-001, Supplemental LER 80-001/01T-1:on 800107,during Performance of Ster 7902 Per IE Bulletin 79-23,diesel Generator 3A Lost Speed Control.Caused by Deteriorated Elastomer Spider Coupling.Spider Coupling Replaced | Supplemental LER 80-001/01T-1:on 800107,during Performance of Ster 7902 Per IE Bulletin 79-23,diesel Generator 3A Lost Speed Control.Caused by Deteriorated Elastomer Spider Coupling.Spider Coupling Replaced | | | 05000259/LER-1980-001-01, /01T-0:on 800107,in Cold Shutdown While Performing Tests Per IE Bulletin 79-28,speed Control on Diesel Generator 3A Was Lost.Caused by Broken Coupling Which Connects Speed Pickup to Generator Shaft.Coupling Replaced | /01T-0:on 800107,in Cold Shutdown While Performing Tests Per IE Bulletin 79-28,speed Control on Diesel Generator 3A Was Lost.Caused by Broken Coupling Which Connects Speed Pickup to Generator Shaft.Coupling Replaced | | | 05000296/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000260/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000296/LER-1980-001-03, /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections | /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections | | | 05000260/LER-1980-001-03, /03L-0:on 791229,during Normal Operation,While Performing SI 4.2.B-1,switch 1 on Reactor Water Level LITS-3-58D Failed to Operate.Caused by Rendom Failure of Switch in Yarway Model 4418CE.Switch Replaced | /03L-0:on 791229,during Normal Operation,While Performing SI 4.2.B-1,switch 1 on Reactor Water Level LITS-3-58D Failed to Operate.Caused by Rendom Failure of Switch in Yarway Model 4418CE.Switch Replaced | | | 05000259/LER-1980-002-03, /03L-0:on 800112,during Shutdown for Refueling, Wind Direction Channel at 33-ft Elevation Failed Upscale. Caused by Lightning Damage at Meteorological Tower.Series 312D Millivolt to Current Converter Repaired | /03L-0:on 800112,during Shutdown for Refueling, Wind Direction Channel at 33-ft Elevation Failed Upscale. Caused by Lightning Damage at Meteorological Tower.Series 312D Millivolt to Current Converter Repaired | | | 05000259/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000260/LER-1980-002-03, /03L-0:on 791222,w/unit in Cold Shutdown,Found That Flow Control Valve 2-FCV-68-79 on Recirculation Sys Would Not Operate.Caused by Motor Pinion Gear Being Installed Backwards.Installment Procedures Will Be Revised | /03L-0:on 791222,w/unit in Cold Shutdown,Found That Flow Control Valve 2-FCV-68-79 on Recirculation Sys Would Not Operate.Caused by Motor Pinion Gear Being Installed Backwards.Installment Procedures Will Be Revised | | | 05000296/LER-1980-002-03, /03L-0:on 800117,while Performing Surveillance Instruction 4.5.B.1.d,residual Heat Removal Sys Flow Control Valve FCV.74-73 Tripped in mid-position.Caused by Valve Stem Lubricant Losing Lubricity,Causing Force on Motor | /03L-0:on 800117,while Performing Surveillance Instruction 4.5.B.1.d,residual Heat Removal Sys Flow Control Valve FCV.74-73 Tripped in mid-position.Caused by Valve Stem Lubricant Losing Lubricity,Causing Force on Motor | | | 05000260/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000296/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000260/LER-1980-003, Updated LER 80-03L/01X-1:on 800914,during EOC-3 Fuel Shuffling Operations,Fuel Assemblies Tz 758 & Tz 399 Discovered Misoriented 90 Degrees.Caused by Misorientation of 16 Fuel Assemblies During Previous Refueling Outage | Updated LER 80-03L/01X-1:on 800914,during EOC-3 Fuel Shuffling Operations,Fuel Assemblies Tz 758 & Tz 399 Discovered Misoriented 90 Degrees.Caused by Misorientation of 16 Fuel Assemblies During Previous Refueling Outage | | | 05000259/LER-1980-003-03, /03L-0:on 800112,while Performing Local Leak Rate Testing During Refueling Shutdown,Path Leakage Through MSIVs for 3 of 4 Main Steam Lines Exceeded Leak Rate Per Tech Specs.Caused by Normal Wear & Erosion | /03L-0:on 800112,while Performing Local Leak Rate Testing During Refueling Shutdown,Path Leakage Through MSIVs for 3 of 4 Main Steam Lines Exceeded Leak Rate Per Tech Specs.Caused by Normal Wear & Erosion | | | 05000296/LER-1980-003-03, /03L-0:on 800126,while Performing Control Rod Exercise,Control Rod 18-55 Would Not Insert W/Normal Drive Pressure.Caused by Failed Seal in Hydraulic Control Unit Directional Control Valve.Valve Repaired | /03L-0:on 800126,while Performing Control Rod Exercise,Control Rod 18-55 Would Not Insert W/Normal Drive Pressure.Caused by Failed Seal in Hydraulic Control Unit Directional Control Valve.Valve Repaired | | | 05000260/LER-1980-003-03, /03L-0:on 800122,during Normal Operation,Momentary Breach of Secondary Containment Occurred When Air Lock Doors Between Turbine & Reactor Bldg Were Simultaneously Opened.Caused by Misaligned Latch Lock & Latch Bolt | /03L-0:on 800122,during Normal Operation,Momentary Breach of Secondary Containment Occurred When Air Lock Doors Between Turbine & Reactor Bldg Were Simultaneously Opened.Caused by Misaligned Latch Lock & Latch Bolt | | | 05000296/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000259/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000260/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000296/LER-1980-004-03, /03L-0:on 800129,4160 Volt Bus Tie Board de-energized & Restored to Normal Cooling Tower Transformer Feeder.Caused by Need to Return Electrical Sys to Normal Configuration.No Recurrence Control Required | /03L-0:on 800129,4160 Volt Bus Tie Board de-energized & Restored to Normal Cooling Tower Transformer Feeder.Caused by Need to Return Electrical Sys to Normal Configuration.No Recurrence Control Required | | | 05000296/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000259/LER-1980-004-01, /01T-0:on 800118,during Refueling Outage,Ndt Insp Revealed Linear Indication 7/8 Inch Long in Reactor or Water clean-up Sys Weld DRWC-1-2.Cause Unknown.Defect Will Be Removed & Weld Repaired Prior to Startup | /01T-0:on 800118,during Refueling Outage,Ndt Insp Revealed Linear Indication 7/8 Inch Long in Reactor or Water clean-up Sys Weld DRWC-1-2.Cause Unknown.Defect Will Be Removed & Weld Repaired Prior to Startup | | | 05000260/LER-1980-004-03, /03L-0:on 800122,reactor Water Level Switch LIS-3- 203D Switch 2 Exceeded Tech Spec Limit During Normal Operation.Caused by Model 288A Switch Drifting Above Setpoint.Switch Tested,Inspected & Recalibr | /03L-0:on 800122,reactor Water Level Switch LIS-3- 203D Switch 2 Exceeded Tech Spec Limit During Normal Operation.Caused by Model 288A Switch Drifting Above Setpoint.Switch Tested,Inspected & Recalibr | | | 05000259/LER-1980-004, Forwards LER 80-004/01T-0 | Forwards LER 80-004/01T-0 | | | 05000296/LER-1980-005-03, /03L-0:on 800205,during Normal Operation,Fcv 74-73 Found Inoperable While Performing Surveillance Instruction. Caused by Random Failure of Gear Tooth in Limit Switch,Size SMB-2,Model 3-G.Limit Switch Replaced | /03L-0:on 800205,during Normal Operation,Fcv 74-73 Found Inoperable While Performing Surveillance Instruction. Caused by Random Failure of Gear Tooth in Limit Switch,Size SMB-2,Model 3-G.Limit Switch Replaced | | | 05000260/LER-1980-005-03, /03L-0:on 800125,while Performing Special Instruction 4.2.B-1 During Normal Operation,Switches 1,2 & 4 on LIS-3-58A Did Not Operate at Proper Setpoint.Caused by Switch 4 Hanging on Magnet.Switches Adjusted | /03L-0:on 800125,while Performing Special Instruction 4.2.B-1 During Normal Operation,Switches 1,2 & 4 on LIS-3-58A Did Not Operate at Proper Setpoint.Caused by Switch 4 Hanging on Magnet.Switches Adjusted | | | 05000260/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000259/LER-1980-005, Forwards LER 80-005/01T-0 | Forwards LER 80-005/01T-0 | | | 05000296/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000259/LER-1980-005-01, /01T-0:on 800118,during Refueling Outage,While Performing Insp Per IE Bulletin 79-14,found No Seismic Restraints in Drywell of Reactor Bldg Closed Cooling Water Piping.Restraints Will Be Installed Prior to Startup | /01T-0:on 800118,during Refueling Outage,While Performing Insp Per IE Bulletin 79-14,found No Seismic Restraints in Drywell of Reactor Bldg Closed Cooling Water Piping.Restraints Will Be Installed Prior to Startup | | | 05000296/LER-1980-006-03, /03L-0:on 800217,w/unit at Steady State Operation, Emergency Equipment Cooling Water Flow Did Not Meet Min Flow of 4 Gpm.Caused by Shells & Mud Preventing Adequate Flow Through Residual Heat Removal Pump 3B Seal Cooler Valve | /03L-0:on 800217,w/unit at Steady State Operation, Emergency Equipment Cooling Water Flow Did Not Meet Min Flow of 4 Gpm.Caused by Shells & Mud Preventing Adequate Flow Through Residual Heat Removal Pump 3B Seal Cooler Valve | | | 05000260/LER-1980-006-03, /03L-0:on 800203,while Running Electrical Checks on Recirculation Pump,Reactor Recirculation Pump 2A Was Accidentally Tripped.Caused by Misinterpretation of Labels on Recirculation Pump Trip Breakers | /03L-0:on 800203,while Running Electrical Checks on Recirculation Pump,Reactor Recirculation Pump 2A Was Accidentally Tripped.Caused by Misinterpretation of Labels on Recirculation Pump Trip Breakers | | | 05000296/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000260/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000259/LER-1980-006-03, /03L-0:on 800122,during Refueling Operations, Control Rod Driveline Accumulator Level Switch LS-1-305-129 on Unit 38-11 Was Found Inoperable.Caused by Broken Reed Switch.Switch Replaced | /03L-0:on 800122,during Refueling Operations, Control Rod Driveline Accumulator Level Switch LS-1-305-129 on Unit 38-11 Was Found Inoperable.Caused by Broken Reed Switch.Switch Replaced | | | 05000259/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000260/LER-1980-007-03, /03L-0:on 800203,during Normal Operation,Reactor Recirculation Pump 2B Tripped.Caused by Pickup of Recirculation Motor Generator Set Generator Stator Temp Relay.Tests Run,No Problems Found | /03L-0:on 800203,during Normal Operation,Reactor Recirculation Pump 2B Tripped.Caused by Pickup of Recirculation Motor Generator Set Generator Stator Temp Relay.Tests Run,No Problems Found | | | 05000296/LER-1980-007-03, /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated | /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated | | | 05000260/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000259/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000259/LER-1980-007-03, /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed | /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed | | | 05000296/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000296/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000260/LER-1980-008-31, /03L-0:on 800206,while Conducting Automatic Depressurization Sys Logic Functional Test,Relay 10A-K26 Manually Operated in Place of Relay 2E-K26 Causing Recirculation Pump 2B Trip.Caused by Operator Error | /03L-0:on 800206,while Conducting Automatic Depressurization Sys Logic Functional Test,Relay 10A-K26 Manually Operated in Place of Relay 2E-K26 Causing Recirculation Pump 2B Trip.Caused by Operator Error | | | 05000296/LER-1980-008-03, /03L-0:on 800402,3B Diesel Generator Governor Actuator Would Not Respond Properly During Operability Surveillance Instruction.Cause Unknown.Oil Contamination Suspected.Sump Flushed & Refilled | /03L-0:on 800402,3B Diesel Generator Governor Actuator Would Not Respond Properly During Operability Surveillance Instruction.Cause Unknown.Oil Contamination Suspected.Sump Flushed & Refilled | | | 05000259/LER-1980-008, Forwards Updated LER 80-008/03L-1 | Forwards Updated LER 80-008/03L-1 | | | 05000260/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000259/LER-1980-008-03, During Scheduled Refueling Outage,Hpci Turbine Had Crack in Coupling Bearing Support Pedestal.Possibly Caused by Water Hammer in Main Steam Supply Line | During Scheduled Refueling Outage,Hpci Turbine Had Crack in Coupling Bearing Support Pedestal.Possibly Caused by Water Hammer in Main Steam Supply Line | | | 05000296/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000296/LER-1980-009-03, /03L-0:on 800404,during Normal Operation,Relay 16A-K63B Overheated & Failed,Blowing Fuse Causing Containment Isolation Sys Group 6 Valves to Fail Closed. Caused by Natural Aging of Relay.Relay & Fuse Replaced | /03L-0:on 800404,during Normal Operation,Relay 16A-K63B Overheated & Failed,Blowing Fuse Causing Containment Isolation Sys Group 6 Valves to Fail Closed. Caused by Natural Aging of Relay.Relay & Fuse Replaced | |
|