ML18024B248
| ML18024B248 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 11/23/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18024B249 | List: |
| References | |
| NUDOCS 8001170025 | |
| Download: ML18024B248 (4) | |
See also: IR 05000259/1979035
Text
~R BEoy
j
~4"
"p.
++*++
n-Reply Refer To:
II:IIJ
50-259/79-35
50-260/79-35
50-296/79-35
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
'EGION
II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
NOV 23 1S79
Valley Authority
ATTN:
H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
TN
37401
Gentlemen:
This refers to the inspection
conducted
by L. L. Jackson of this office on
October 22-26,
1979, of activities authorized
by NRC Operating License Nos.
DPR-52 and DPR-68 for the Browns Ferry facility, and to the discussion of our
findings held with H. I,. Abercrombie at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
t
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompj.iance
were disclosed.
We have
examined actions
you have taken with regard to previously identified
enforcement matters.
These are discussed
in the enclosed
inspection report.
One new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed
report.
This item will be examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report, contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard within
the specified period,
the report will be placed in the Public Document
Room.
sooner ~o C25
,
Valley Authority
~OV 23 ]yg
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report Nos. 50-259/79-35,
50-260/79-35
and 50-296/79-35
cc w/encl:
H. I. Abercrombie
Plant Superintendent
P. 0.
Box 2000
Decatur,
35602
D. E. McCloud, Project Engineer
400 Chestnut Street
Tower II
Chattanooga,
TN
37401
J. F.
Cox
400 Commerce Street
W10C131
C-K
Knoxville,'N
37902
E.
G. Beasley
Valley Authority,
309 Grant's Building
Knoxville, Tennessee
37902