ML18024B037
| ML18024B037 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/06/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18024B038 | List: |
| References | |
| NUDOCS 7910020322 | |
| Download: ML18024B037 (4) | |
See also: IR 05000259/1979018
Text
~ P,S 4EGI
(4
P0
Op
C
4
0
++**~
In Reply Refer To:
RII:RFS
50-259/79-18
50-260/79-18
50-296/79-18
UNITED STATES
NUCI EAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
AUG 6
Valley Authority
Attn:
H.
G. Parris
Manager of Power
500A Chestnut 'Street
Tower II
Chattanooga,
37401
'Gentlemen:
This refers to the inspection
conducted
by R. F. Sullivan of this office
on June 21-July 6,
1979 of activities authorized by NRC License Nos.
DPR-52 and DPR-68 for the Browns Ferry facility, Units 1,
2 and
3, and to the discussion of our findings held with J.
G. Dewease at the
conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these areas,
the inspection
consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room. If this report contains
any information that you (or
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include
a full statement
of the reasons
on the basis of which it is
claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained
in a separate
part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document
Room.
Oi
II
-2-
duo
6
I
/
Should you have any questions
concerning this lett
,
we will be glad to
discuss
them with you.
Sincerely,
E'.c.
R.
C.
ewe.s, Acting Chief
Reactor Operations
and
Nuclear Support Branch
Enclosures:
Inspection Report Nos. 50-259/79-18,
50-260/79-18
and 50-296/79-18
cc w/enclosures:
J.
G. Dewease
Plant Superintendent
Post Office Box 2000
Decatur,
35602
D. E. McCloud, Project Engineer
~
~
~
~
400 Chestnut Street
Tower II
Chattanooga,
37401
I
0
0