UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
In Reply Refer To:
RII:RFS
50-259/79-13
50-260/79-13
50-296/79"13
JUL 1 1 1S?9
Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga,
TN
37401
h
Gentlemen:
This refers
to the inspection
conducted
by R. F. Sullivan of this office on
April 30 - June
15,
1979, of activities authorized
by NRC License Nos.
and
DPR-68 for the
Browns Ferry, Unit
1>
2> and
3 facility, and to the
discussion
of our findings held with J.
G.
Dewease
at the conclusion of the
inspection.
t
Areas
examined
during the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold
such
information
from public disclosure.
Any.;such application
must
include
a full statement
of the reasons
on the basis of which it is claimed that
the information is proprietary,
and
should
be
prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
g.c.
Richard
C. Lewis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosure:
See
Page
2
~
.
~
Valley Authority
-2"
JUL 1 1 1979
Enclosure:
Inspection Report Nos. 50-259/79-13,
50-260/79-13,
and 50-296/79-12
cc w/encl:
J.
G. Dewease
Plant Superintendent
P. 0.
Box 2000
Decatur,
35602
D. E. McCloud, Project Engineer
400 Chestnut Street
Tower II
Chattanooga,
TN