ML18024A929

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-259/79-12,50-260/79-12 & 50-296/79-12 on 790402-27.No Noncompliance Noted
ML18024A929
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/21/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18024A930 List:
References
NUDOCS 7908060001
Download: ML18024A929 (2)


See also: IR 05000259/1979012

Text

QiritPw(

In Reply Refer To:

RII:RFS

50"259/79"12

50-260/79-12

50-296/79-12

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN 2

1 1979

Tennessee

Valley Authority

ATTN:

H.

G. Parris

Manager of Power

500A Chestnut Street

Tower II

Chattanooga,

TN

37401

Gentlemen:

This refers to the inspection

conducted by R. F. Sullivan of this office on

April 2-27,

1979, of activities authorized by NRC Operating License Nos. DPR-33,

DPR-52 and DPR-68 for the Browns Ferry, Unit I, 2 and 3 facilities, and to the

discussion of our findings held with J.

G. Dewease at the conclusion of the

inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of,procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room, If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

g,c,

,8060>>@,J:

R.

C. Lewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Tennessee

Valley Authority

-2-

JUN 2 1 197S

Enclosure:

Inspection Report Nos. 50-259/79-12,

50-260/79-12

and 50-296/79-12

cc w/encl:

J. E. Gilleland

Assistant

Manager of Power

500C Chestnut Street

Tower II

Chattanooga,

TN

37401

J.

G. Dewease

Plant Superintendent

P. 0. Box 2000

Decatur,

AL

35602

J. F.

Cox

400 Commerce Street

W10C131

C

Knoxville, TN

37902

D. E. McCloud, Project Engineer

400 Chestnut Street

Tower II

Chattanooga,

TN

37401