QiritPw(
In Reply Refer To:
RII:RFS
50"259/79"12
50-260/79-12
50-296/79-12
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
JUN 2
1 1979
Valley Authority
ATTN:
H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
TN
37401
Gentlemen:
This refers to the inspection
conducted by R. F. Sullivan of this office on
April 2-27,
1979, of activities authorized by NRC Operating License Nos. DPR-33,
DPR-52 and DPR-68 for the Browns Ferry, Unit I, 2 and 3 facilities, and to the
discussion of our findings held with J.
G. Dewease at the conclusion of the
inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of,procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room, If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement
of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
g,c,
,8060>>@,J:
R.
C. Lewis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Valley Authority
-2-
JUN 2 1 197S
Enclosure:
Inspection Report Nos. 50-259/79-12,
50-260/79-12
and 50-296/79-12
cc w/encl:
J. E. Gilleland
Assistant
Manager of Power
500C Chestnut Street
Tower II
Chattanooga,
TN
37401
J.
G. Dewease
Plant Superintendent
P. 0. Box 2000
Decatur,
35602
J. F.
Cox
400 Commerce Street
W10C131
C
Knoxville, TN
37902
D. E. McCloud, Project Engineer
400 Chestnut Street
Tower II
Chattanooga,
TN
37401