ML18024A704
| ML18024A704 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/02/1979 |
| From: | Devease J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML18024A705 | List: |
| References | |
| NUDOCS 7903070213 | |
| Download: ML18024A704 (4) | |
Text
REGULATOR'Y FORt. ATION DISTRIBUTION SY N (RIDS)
ACCESSION NdR:7903070213 DOC.DATE: 79/03/02 NOTARIZED:
NO FACIL:50 259 BRO~<NS FERRY NUCLEAR POINTER STATION<
UNIT 1
TENNESSEE BROGANS FERRY NUCLEAR POMMER STATION UNIT 2 TENNESSEE 50-296 DANS FERRY NUCLEAR POWDER STATIONS UhlIT 3 TENNESSEE AU
~ i AUTHOR AFF ILIA TIDE DEBASE J. 6 TENNESSEE VAlLEY AUTHOR I T Y REC IP.NAt'iE RECIPIENT AFFILIATION DOCKET 05000259 05000260 05000296 OFF ICE OF INSPECTION 4
Ei<FORCEHE{vT
SUBJECT:
FORWARDS REVISED PAGE FOR MONTHLY OPERATING REPT FOR JAN 1979
'ISTRIBUTIONCODE:
AOOSS COPIES RECEIVEO:LTR Q ENCL + SIZE:~2 Q TITLE: ANNUALP SEMI ANNUAL 5 HONTHLY OPERA TING REPORTS (OL STAG NOTES:
REC IP IENT ID CODE/NAME ACTION:
05 ec INTERNAL: 0 16 0 IR DOR 18 ENGR 6R 20 PLANT SYS BR 22 CORE PERF BR EXTERNAL: 03 LPDR NATI LAB 26 ACRS COPIES LTTR ENCL 6
6 1
2 2
1 1
1 1
1 1
1 1
2 2
1 15 15 RECIPIENT ID CODE/INANE 02 NRC PDR MPA 17 AD SYS/PROJ 19 REAC SAFT BR 21 EE8 23 EFFL TR SYS 04 NSIC 25 8ROOKHAVEN CUP lES LTTR FNCL 1
1 2
2 1
~ 1 1
1 1
1 1
1 1
1 1
1 TOTAL NU>18ER OF COPIES REQUIRED:
LTTR 40 ENCL 40
7:-
i ic.:-=:-:-
'10 i i:-Y AU,.'-'.CRITY Browns Ferry Nuclear Plant P.
O.
Box 2000
Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
Please replace page 20 of your January 1979 Monthly Operating Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 with the attached revision thereof dated February 28, 1979.
Very truly yours, TEiVEESS E VALLEY AUTHORITY J ~
og se Pl Superintendent Enclosure CC:
Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 101 Marietta Street Suite 3100
- Atlanta, GA 30303 (1 copy)
Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies)
Nr. J.
A. Prestele, Acting Director Nuclear Engineering and Operations Dept.
Electric Power Research Institute P.
O.
Box 10412, Palo Alto, CA 94304 7903010 Pl
CO CO cd CO
'NITSIIUTDOlUNSANDPOWER REDUCTIONS REPORT AIONIII~TUARYI'OCKET NO.
UNI'I'AhIE DATli COhll'LETED IIY TEL EI'IIONE
'0-259 o
0 een 205-729-68<<6 No.
Dale oG~
I Ac
~P RP E/)
Liccnscc Event Report ¹ H~
C RP 0C r) cl CJ Cause i%. Correct ivc Action lo PrcYcnl ltccurrcnce 55 56 57 58 59 60 61 62
'90101 790120 790120 790122 790122 790129
'90129 790131 471.1 24.7
.3 ll;6 B
4 B
B 4
B
~
A B
Refuelin No shutdown/ ecirc.
um tri test Balancin Main Turbine No shutdown turbine'verspeed trip test Turbine trip on "sensed" moisture separator high level when resetting turbine the Rx scrammed on stop valve closure with first stage pressure in excess of 154 psig, due t an EHC'malfunction.
Derated due to Rx feed um tests Derated due to low condenser vacuum when "B" steam)get air effector ressure re ulator malfunctioned.
Derated for refuel test instruction RTI323 F: Forced S: Scl)eduled
(')/77) kcas)ul:
A Equipment Failure (Explain)
II hlaintcnancc or Test C.Rct'ucling D Ret,ulat>>ry Restriction I!.Operator Trainint', k. Liccnsc Exa)ninalion I) Adn)inistralivc G Operali)nial Err()r (Explain)
I I Other (Explain) hlcthod:
I.gianual 2-hlanual Scran).
3-Auto)ualic Sera)n.
~AI'Otilcr(Explain)
I)xi)ibit G - I)fst) oct ious fiu PreparatiPu) ol'hta
':nt)y Sl)cuts t)u I.)ccuscc Lvcnt lti;p)at ( I.I'.R) I'ile (NIIRI'.(P.
0 I 6) I I Exist>>t I-Sa)n<<Sou)cc
- Revised 2/28/79.
I
~
UNITSIIUTDO(VNS AND PO'iVER REDUCTIONS REPORT AlONfll~JREARY I
DOCKF1 NO.
50-259 UNLTNAhfE Hro'wns Ferr I TEL( I IIONF 205-729-6846 I
Nf(.
l)atc r(
5 P(,I ~
Ra C
~ (rI Llccnscc Event Report rr C+
(J
'YS
~aa (rI'Cr I
~an O
R'(s O
Cause A. ( or(ective Act(on lo p(( vcol R( (.uf((.o(.f, 55 56 790101 790120 57 790120 S
471.1 ll.3 24.7 C
B B
Refuelin No shutdown/ ecirc.
um tri test Balancin Main Turbine 58 59 790122 790122
.3 ll;6 B
A 3
No shutdown turbine overspeed trip test Turbine trip on "sensed" moisture separator high level when resetting turbine the Rx scrammed on stop valve closure with first stage pressure in excess of 154 psig, due t an EIIC'malfunction.
60 790129"'1 790129 62 '90131 S.
B Derated due to Rx feed um tests Derated due to low condenser vacuum when "B" steam,get air e)ector ressure re ulator ma functioned.
Derated for refuel test instruction RTI>23 I". Fore d S: Scheduled R@asoll:
A-FAIuipntcnt Failure (Explain)
II h(aintcoancc or Test C Rciuclhlg I) Regulalo(y Restriction
. I.
F.-Operator Training 4 License Iixao(inat ion F-Adroinistralire CA Operational I:rror (Lxplalo)
I I Other (L(xplaio) h(clhod:
I ~)(Iaoual 2 h(aoual Scraol.
3-Autoloalic Seraol.
~4.Other (L'xplaio)
I!xhihit CA ~ Il(sl(net h(os fol I (CPauaal Illa Ot l)illa(
':ol(y Sheets Io( I.icons<<c liven( I((fpo(l ( I.liR) I'iic(N(IRII(>~
0161)
Iixhihil I ~ Saute S((ulcc
- Revised 2/28/79.