MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RID DISTRIBUTION FQR INCOMING MATERIAL 50-3 eS REC: GRIER B H ORG: CURTIS N W DOCDATE: 04j'17/78
'RC PA PNR 8. LIGHT DATE RCVD: 05J04f78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 FURNISHING INFQ RE CONSTRUCTION DEFICIENCY REPT CONCERNING WESTINGHOUSE SUPPLIED MEDIUM VOLTAGES METAL CLAD SWITCHGEAR WHICH MAY NOT BE FULLY CAPABLE OF WITHSTANDING THE POSTULATED SEISMIC EVENT FOR SUB JECT FACILITY... ADVISING REQUIRED DEFINITIVE REPT WI PLANT NAME:SUSQUEHANNA UNIT REVIEWER INITIAL: X JM SUSQUEHANNA' UNIT 2 DISTRIBUTER INITIAL:~~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ++++<%%%+<+<<<+<<+
CONSTRUCTION DEFICIENCY REPORT < 10CFR50. 55(E).
(DISTRIBUTION CODE 3004>
FQR ACTION: ASST DIR VASSALLO+~LTR ONLY(i> BR CHIEF PARR++LTR ONLY(i >
PRO G~MINER4NLTR ONLY< 1) LIC ASST RUSHBRQQK<~LTR ONLY(i)
INTERNAL: REG FIL ~~ gNLY< 1) NRC PDR++LTR ONLY<i)
. E+~LTR ONLY(2) QELD++LTR ONLY(i>
GOSSICK 5 STAFF+4LTR ONLY<i) MIPC4+LTR ONLY< 1)
BOYD++LTR ONLY(1) DEYOUNG+>LTR ONLY(i>
HELTEMES+<LTR ONLY(i) R. MATTSON++LTR ONLY<i)
KNIGHT~+LTR ONLY(1 > ROSS+~LTR ONLY(1>
TEDESCO+~LTR ONLY<i) EISENHUT++LTR ONLY< 1)
STANDARDS DEV. ++LTR ONLY(1> K SEYFRITJIE++LTR ONLY(i >
EXTERNAL: LPDR S WILKES BARRE> PA~+LTR ONLY(
TIC4I~LTR ONLY(1 >
NSIC++LTR ONLY(1)
FERD DREHERfIE4~>LTR ONLY(i)
ACRS CAT B++LTR ONLY<16)
DISTRIBUTION: LTR 41 ENCL 0 . CONTROL NBR: 78124 0 - 1 SI ZE: 2P I THE END
~ i It
~ V
i w ~ \~
f sr I-AP>>
r' \ LIP TWO NORTH NINTH STREET, ALLENTOWN, PA. 'I 8101 PHONE: (215) 821-5151 NORMAN W. CURTIS Vice President Engineering 8 Construction c<< C~
1.1 821.5381 <a~
JC Ã~
Cll CAl
~
@err M Mr. Boyce H. Grier Director, Region I ff$ X U.S. Nuclear Regulatory Comhtission CA 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF REPORTABLE DEFICIENCY
~@yy.,
REGARDING POTENTIAL TRANSFORMERS ON 4.16KV SWITCHGEAR DOCKET NOS 50 387 g'0 388
~i g'/gg LICENSE NOSI CPPR-101, CPPR-102 ERs 100450/100508 FILE 840-4 PLA-246 Dear M . Griers This relates to a reportable deficiency, under the provision of 10CFR 50.55(e),
which was. identified to Mx' A Toth NRCg Region I by Mr. A. R. Sabol, PPGL during a'elephone conversation on 3/31/78. The deficiency involves Westing-house supplied medium voltage, metal clad switchgear which may not be fully capable of withstanding the postulated seismic event for the Susquehanna plant.
Z Specifically, Westinghouse C
has advised that, the potential transformer secondary disconnecting contact assemblies on equipment similar to that supplied for Susquehanna have failed to withstand recent seismic tests. Westinghouse further stated that, under seismic conditions, it is possible that the secondary contacts could be dislodged from their normal positions causing open circuiting or shorting of the secondary circuits.
It has been established that eight of the sixteen units, purchased for use in safety related applications, have been shipped to the SSES plant site. To preclude installation of this equipment, Bechtel has identified (3/16/78) these eight units in a QA Stop Work Report (No. 78-06) as being nonconforming. As a result, Bechtel QC has written a Nonconformance Report (NCR No. 2514) and each switchgear unit has had a "Hold Tag" attached.
Bechtel Engineering has reviewed the system design and they have concluded that the worst condition exists with the loss, on each switchgear bus, of the potential transformers on both incoming feeders coupled with the loss of one, or both, of the bus voltage monitoring transformers.
78124003k err r
PENNSYLVANIA POWER 8 LIGHT COMPANY
4
\,'Kr J
Mr. Boyce pi. Grier 2 April 17'978 Under this condition, the incoming bus feeders from the safeguard transformers would be automatically disconnected and the diesel generator power source connected restoring power to the bus.
The feeder breakers supplying power to the shutdown loads are normally open.
A LOCA occurring during or after the postulated seismic event would initiate a closing signal to the motor feeder breakers of the shutdown loads, i.e. RHR and Core Spray Pumps.
These feeder breakers would close and immediately trip due to the false undervoltage indication as sensed by the undervoltage relay. The circuit breakers would be unable to close again because of 'the permanent undervoltage trip signal imposed on them.
The above analysis assumes that the failures concurrently occur on all'redundant switchgear buses.
Bechtel Engineering has further concluded that this loss of capability to supply power to shutdown equipment under a LOCA constitutes a safety hazard to the operation of the plant and represents a deficiency in final design.
As proposed remedial action, Westinghouse has advised that modification kits are available which, when installed, would eliminate the faulty secondary dis-connecting assemblies from the circuit. This is accomplished by hard wiring
'the secondary to the load circuits. Bechtel Engineering is considering the use of these modification kits pending assurance from Westinghouse that this modi-fication will meet all the requirements of the technical specification.
We anticipate submittal of the required definitive report of the deficiency by 7/31/78.
Very truly yours, N. W. Curtis Vice President-Engineering 6 Construction
$ 6iG/ARS: mcb cc: Ms. M. C. Bar to N4 Mr. H. F. Lilligh Bechtel SSES Mr. N. W. Curtis N4 Mr. E. M. Mead N5 Mr. R. L. Emery N4 Mr. M. R. Muir Bechtel SFHO Mr. J. W. Geiling N5 Mr. J. R. Schmiedel Bechtel SFHO Mr. J. D. Green SSES Mr. R. J. Shovlin N4 Mr. H. L. Harris SSES SpsE Correspondence File N3 Mr. Jo To Kauffman TW16 Susquehanna Letter File N3