ML18022A457

From kanterella
Jump to navigation Jump to search
Package of 78 Comments Requesting Denial of Util Request for Exemption from Full Participation Exercise of Emergency Response Plan.Exercise Should Be Conducted Before Plant Permitted to Operate
ML18022A457
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1986
From: Barker L, Barnhart M, Michael Brown, Burke A, Carraway L, Carraway P, Casey M, Champion L, Kelly Clayton, Cofresi L, Coleman S, Desoto A, Desoto R, Duch D, Dunn A, Durham B, Elliot B, Fulton T, Gower A, Hamilton D, Harrington J, Harrison A, Hayes J, Hegler P, Hickle S, Lancaster I, Landy E, Laughter D, Laughter E, Marcoplos M, May A, Mcgowan J, Maria Moore, Moore T, Mark Morrison, Morrison R, Murphy A, Nibby N, Osullivan E, Peterson L, Pleasants R, Powers B, Ransom M, Rhodarmer K, Richardson K, Rosemont N, Sears H, Sewais L, Shiffield S, Shirley G, Sink M, Slaugaten D, Suggs S, Tyler L, Whitt S, Willis N, Zeeger R
AFFILIATION NOT ASSIGNED
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8611050175
Download: ML18022A457 (234)


Text

Sb11050175 Bb1031 PDR ADQCK 05000400 H PDR

'L I

I gy 6 /

~ \

( ~

<<NUDOCS/RD>> Nuclear Regulatory Commi ssi on ADQ42 V6

==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm Address: 38480-206 38480-206 Size: 1p.

Document Type: Incoming Correspondence Issued: 861031 Desc/: Package of 78 comments requesting denial of 'util request for exemption

Title:

from full participation exercise-of emergency response plan. Exercise should be conducted before plant permitted to operate.

Authors: MAY,A. Affiliation Not Assigned BARKER,L.B. Affiliation Not Assigned Recipients: Office of Nuclear Reactor Regulation, Director (8 Dockets: 05080408 50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina File. Locations: PDR ADOCK 05880480 H 861031 Package: 8611050175 4 I ~ ~ ~ ~

Count: "8 <Replace>

Dear Mr. Denton:

I wish-to urge denial of CPS,L'8 )lrequest for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted befo're the plant is permitted to operate at all.

il Sincerely, g /~K(~~

Mr. Harold Denton,,Director Offi'ce of Nuclear Re'action Regulatiop Nuclear Regulatory Commission Washington, DC '20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the ~requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashi.ngton, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CI'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincere y

t<cxr D:.48i((qh fp $

M p <<QP@t(- ~<<

31 OCT

/9g6 (;Vi~l)~ 'rOURPQST ~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

>>l(ill l >>>> t(t>> l(l((l(l>>(lJ(l

Dear Mr.. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR Appendix E, that the Company conduct a" full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent 'of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton~

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CVR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

ph, Q l4

~~~~@@ p pjl

/ 31 FACT

~

y '11$ +f CFQ I

yg~(~~ppgE /UC Z.

H Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Mashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEI.'s request for exemption from the requirement,'nde'r~ 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for 'changes in the evacua-tion plan, -I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincere

t'cxrD; W 'L)ltlclfllf p y jg lY Cl N(l'Cg5" 31 OC'I 1986 riovr HAP .

)

o"sr PF&0 ~

E Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear"Mr. Denton:

I wish to urge denial of CPS,1.'s request. for exemption from the requirement, under 10 Ct'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Plcxr D~- "

ir gy voUR &OS. QFlc .

',N~'

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.. benton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at a Sincerely,

41a @or ~~

L.C m MC .'778 31 CCT Io Q+

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct- a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

'tC p()5a CP

.s')'fQCT vDU(l

~

mq ait E

~14 i'r.

Harold Denton, Director Office of Nuclear. Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 lssl(lllsssslslsslslsslslsssllsl

er

Dear Mr. Denton:

5 I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 Cl'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at

~

greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

2~ P~gPPL. <.a5'agia '-

~nC ~ 7'1 OCT  ;,.'r.

Isa Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CI'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise sh uld be conducted before the plant is permi ed to operate at all.

Sincerely, C7

/

~

t-I fg Ol 3i OCT 198e A1 S

Mrs Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

5

Dear Mr..'Denton:

I wish to urge denial of CPS,L's reques't for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe t:his exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before -beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

DQ ssss $ ,

(

)9>36 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 ls)lslllssssl)ls)lsl)slslss)llsl

Dea'r Mr. Denton:

I wish to urge denial of CPLI 's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr ~ Harold Denton, Director Office of Nucl ear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Dentons I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E,'hat the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating, at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, g2/L~ I 8

a t~k ttEXT O.".'v o.VLW 'I'~ p4>><~~ ~-)Sniqlnir

>.- gv'i ~

~~s >)~~

+w( ~nvd4 C->%RA'g6-- ~g iigg, I

egin~,

pygmy POS. DFr4

, CFA

'N i Mr. Harold Dentoni Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashington, DC 20555

Dear Mr. Denton:

I wish to urge'enial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent" of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashington, DC 20555

Dea'r Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct. a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

o~ "4N'. V'('<

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one .year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at M~ l.

Sincerely,

r4 3X OCT I<a6 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

0 l wish to urge denial of CPS,I.'s reqdept for exemption from the requirement, unde'r 10 Cl'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

~ ~ ~

~

ffg Pap)g ~4 ~

~c << >a~.

pg/L/Agree w~ 2=. +PF'-"',:-;= '<)

'@P,.fl 1986 c'4J& POSTS'jP'g S

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

'I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR 50, A endix E that the Company conduct a full participation exercise of the Emergency Respon se Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or, before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

a gPP j

l f9$ $8'~pis,'

~ ~~Iyp p.ps @FACE

14 i Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington> DC 20555

Dear Mr. Denton:

I wish. to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan,'. I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Il Pg AH@ i

~~

OCXT D>>

~ Sinclair VIS 6 5~4 QP3pF

~il/eY

'BP-

'7OLe r Ot>IAOT VOVR POSTO:

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

r 315cA ie85-Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr-. Denton~

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

4

Dear Mr. Denton:

/1 I

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 Cl.'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington> DC 20555 J>>l) lit>>))l) l>>l)l)) I) l)>>lj)I

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nucleax'ower plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, 1 believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Nr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

1 O'G 19%

Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

3 Dear Mr. Den4on.

I wish to urge denial of CPSI.'s request for exemption from the requirement, urger 10 CPR 50, Appendix E, that the Company conJ ct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

~Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

D/)IV l 0 Du>-.H pe Hy +Q PM GIYE TSIJ(jl EB-.

CEBEBB f. PAL't N< 77<1/ 31 OCT

/9g6 HELP DISABL>PFLI 14 i'P Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 1>>l) tll(>>fl)l>>l)f))ht)))lf)l

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear; power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Mashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct<a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial opeiation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

,5a <<i... I<~>fbi>>

~ ~

Mr . Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10.CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant .

within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear-Mr. Dentonc I wish to urge denial of CP6,L's request for exemption from the requirement, under ]0 CFR 50, Appendix E, that the Company conduct' full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted t'o operate at all.

Mr ~ Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Dentons T wish to urge denial of CP6,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant 'or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Ha'roid Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full part.icipation exercise of the Emergency Response Plan for its Shearon Harris nuclear p'ower plant within one year before beginning'commercial operation of. the plant or',before operating at greater than five percent of rated power.

~ Because of the need for changes in the evacua-I tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

CC iS $ aau CCM ~

gg

)& 98 CD'. "I II'CC CF" Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington> DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, qa)cC

Mr. Harold Denton< Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency

/ Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or .before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted Co operate at all Sincerely,

PQ pig 4'PS~biyJ-,;:

I gl $ ~ i lrCVA PO+T C ~FIC

)B i Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company conduct 5 -full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant.-

within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton> Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Mashington, DC 20555 l>>((lit>>iilil(ilili(Ill>>)

Ilail

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before t e plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

De'a'r Mr. Dent. on:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all Sincerely,

Ig~S Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company'conduct a full participation exercise of the Emergency Respons~

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Dentonc I wish to urge denial of CPLL's request for exemption from the requirement, under 10 CVR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

g~f& i p>81 >qlaif-

~v p>>

".-14

('r.

Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

re V

Dear Mr. Denton:

wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulhtion Nuclear Regulatory Commission Washington, DC 20555 .

Dear Mr. Denton:

I .wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Hr. Harold Denton, Director Office of Nuclear Reaction Regul'~~tiop Nuclear Regulatory Commission Washington, DC 20555

r *4 U

Dear Mr. Denton:

I wish to urge denial of CP8L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, l

~

~ ~ ~ ~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPLL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exert:ise should be conducted before the plant is permitted to operate at all.

Sincerely,

flcxTD:Y

=

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

0' wish to urge denial of CPS.I.'s request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, d

'":'I'e'7"

Ce h'OVA POSTCfF <<USA -14+ Mr;-'Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washing'ton, DC 20555.

Dear .Mr. Denton:

I wish to urge denial of CPLI,'s request for exemption from the requirement, under 10 Cl'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for -changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, P.

K 31 "CT

/9' Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company'conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear"power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for .changes in the evacua-

~

tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

tlEXfDcY " g" PQ p'+p+8 @'~~laii )vis,'/A lg P:-. " >

3i OCS

/986 gg!sr,igt <<.-'l.'i 6 D5 l'i 14 ~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Mashington, DC 20555

Dear Mr..Denton:

~,I E wish to urge denial of CPS I.' reques t for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear'ower plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Haro'ld Denton, Director Office of Nuclear Reaction Regulatiop .

Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPB,I.'s request Eor exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all. gggT g~g Qg gogg~I + p F~p E 'P<of'LES c'ow~gg~

Sincerely,

~gyp~~~~ ~kltlcli1fp yyjs gal@ i 32 OC> I Q7$ gQ ass l"k I Mr . Harold Den ton , Di re ctor Office of Nuclear Reaction Regul a tiop Nuclear Regulatory i Commi s s on Washington , DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS.L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe thi's exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

GL ~6H~+ Ncxr I: jPirida~iii f j MQ so p~ p$ pgp ll~~gv 1$ ii <

0'<4~~+5~ g$ 'Sindhi y~eaefl 4j 8 ttw4wg -Sr OZEgCr, << ~" ZpC YCUfr S

l4 1 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashington, DC 20555 f>>lifll>>islil~ilili~lil>>l till
'ear Mi. Dentonc I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPB 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power. Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all. Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington< DC 20555

Dear Mr. Denton:

I wish.to urge denial of CPS,I.'s reque~st for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency response Plan for its Shearon Harris nuclear pdwer plant within one year before beginning commercial operation of the plant oi before operating at greater than five percent of rated power.

Because of the need for 'changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~~gJ/ 3@9cl+ 7 /~i ., 4

/

lfr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Dentons 1 wish to urge denial of CPS,L's req'uest for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 libel)lllssitlslitlij)(I<I)<sll)l

~q$ 3P

/

Dear Mr. Denton:

~,

I wish to urge denial of CPSI,'s request for exemption from the requirement, undeb 10 CPR 50, Appendix E, that the Company conduct, a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

1 vm>Vi C,+. u tfEXF ar.'Y I

~4~ H.ill Pg @~WgIa)p 31 SNAIL "c 0CV'~e c;OurnCr Vodka PnSr oPrge llSA

~I% i Mr. Harold Denton, Director

-Office of Nuclear Reaction'egulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

.I wish to urge denial of CPEL's request for exemption from the requirement, uqder'10 CPR 50, Appendix E, that the Company conduct .a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

h1r. and htrs. John

~ <<p T /'~ lj~(

gl 105 Oiler Dri<<e yl

~% % j Siucl>>q>'>

Q p~

1 Cary, Worlh Carolt 7510 sr N',1 )r

'JSA Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

c5

)

E~

Dear Mr Den ton:

I wish to urge denial of CPS,I.ls request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~'P M

~at ocr.

'o 1 qI M Zgd l9BSc 986 Mr. Harold Denton Director Office of Nuclear Reaction Reg~ulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton~

I wish to urge denial of CPLL's request for exemption from the requirement, under ]0 CPR 50, Appendix E, that the Company conduct a full

~~~;participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes..in the evacua-tion plan, I believe this exercise should be conducted. before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct,a, full participation exercise of the Emergehcy Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincere

Mr. Harold", Denton, Director Office of Nuclear Reaction Regu3.atiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS.I.'s request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

1 I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 Ct'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

'\

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton~

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, X believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, ~~~@ W~~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington< DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company cond@et a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Ir Sincerel

x~~ 4

~

i blllclgfp~yyj PM 31 OC'l Igqf Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~S)I)gl)) j) ~

V

~J <<<<

R.4, L~ g t Q ~+~]~)sb USA

~44 Gc B~'

lir. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at gieater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

cH lfEXTDAr y<<~ ~ r. Mgt shawm ItIr 31 QCV I)j clair+ is,'uP f996 I'rI I I I II 'V h PO 5 T i I f-JC

'SA

.24 Harold Denton, Director i'r.

Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Den@on:

l wish to urge denial of CPS*L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct, a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the p1ant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

'Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is perm'd to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington< DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Hr; Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear .Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

~. N

,"4 jl Dear .Hg. Denton'i t' '~ S I wish to urge denial of CPLI.'s request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year .before beginning. commercial operation of the plant or before operating at greater than five percent of rate'd power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

F985 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

H. hl= g Jag P'~~PCj~ ~ plllVCgll ling AN~

sI>OSt

if' I

4 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

w I, r

"/

I ~ I '

f

Dear Hr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, 40nder 10 CFR 501 Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-t'ion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, 0-. g

fl.-xrD.,"v Dcaergv pp'pp&$'g .'-

MA COtJTACI YOUIIPOSi+$ I

/986 Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

i

~ PI

  • 0 f S0( e I il

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement,<under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response

.Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at

~

gryater than five percent of rated power.

,Because of the need for changes in the evacua-tion" plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~~5 ~H e~

po 4 ~ Peg>> '-

C bc'e/ 4'l( 5~&8 Ilk Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPSL's request for exemption from the requirement @under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Respons Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua- .

tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.'incerely,

Mr,.. Ha'roid Denton, Director Offi'ce of Nuclear Reaction Regulatio Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS L's request for exemption from the requirement, under 10 CE'R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the, plant or before operating at greater than five percent of rated power.

.~Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the is erma,t ted to o crate at all.

Sincerely,

0 Y. Ve< <Al p p Acx~81nvh~~F

)0'6 en.rrIn 4 P~ c FXPg~g@c-,;..'

P I~sgom> ~< >a>a CG/aF<0'p pg Jlpg 1 c ~

4 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

83tHTmW "'UOQ 88804'8@g>>

Dear Nr.)D e> U~yggq ~~o,

4 RUG; l70$

m~h to urge denial of CPS L' request for exemption from the requirement, un'der 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, g beep< zog@>>>>(=

. )/z

<<//>> IN/ ."." GOODWILL INDUSlI lfS Our BUSINESS IOhk, FOB DISABLED PEI Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.,

'Denton:

I wish to urge denial of CgB,L's request for exemption from the requireQe~t, under 10 CPR 50, Appendix E, that the Compang~p'onduct a full participation exercise of the Erdergency Response P-an for its Shearon Harris nucl'ear power plant within one year before beginning commercial operation of the plant or before operating at gregter than five percent of rated power.

Pecause of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, s.c.. ~~

lou Ccu l S+ Q~4o~ p~ ~~g~>

Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear'r,

. Denton:

I wish to urge denial of CPSL~ request for exempt'ion from the requirement/, under 10 CFR 50, Appendix E, that the Company conductor@ full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerel

6/ cC Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

~f.'ish to urge denial of CPBL's request for exemption from the requirement:<~~pnder 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of .the Emergency Response

-~ Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatio Nuclear Regulatory Commission Washington, DC 20555

4

Dear Mr. Denton:

~ t I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conducP,"a full participation exercise of the Emergency Response P3.an for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

'> n~

u, M>> ~~

~~

22 AUG a) 1986 Ifr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise>of the Emergency Response Plan for its Shearon Harris nuclear power plant wx,thin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-t'ion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

c f GOOD'jl'IILL INDUSITlg%

AvN AO.

OUR BUSiVESS FOR DlSt BLED PBN Mr. Harold Denton, Director

  • Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

l lg I g

Jgr go g; ~

Dear'Mr. Denton:

rg~

I wish to Gage denial of CPSL's request for exemption from the requirement, undjq 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan, for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

l(-

GOODVIlLL INDUS RK4' g~ ~ OUR BUSlNESS NOBLES-.

CA ~-'OR

'ZE 'lUG DlSABLEQ PEOPL I

/986 Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

N,.C-~ g

Dear Mr. Denton:

X wish to urge denial of CPSL's~equest for exemption from the requirement, g>der 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emerge'ncy Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

/'incerely,

<<e < ',~ y gg'i <<I C ~ V<<o 4 I gSJ))elf)~

AL( ~( Ql

",g<<g +~~"

22 AUG'~

'USA

/996 tir. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Dento I wish to urge denial of CPSs request for

'exemption from the requiremen't, uri8pr 10,CFR 50, Appendix E, that the Company conduct a,full participation exercise of the Emergency Response P='an for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at grater than five percent of rated power.

Pecause of the need for changes in the evacua-tion plan: I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, f05<<%$

QspQ- /lid, 2pp($

f(ExY DAYDggtyggy

~ ~

gp~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. De ..on:

wish to urge denial of CPSL's request for exemption from the requirement, uyder 10 CFR 50, Appendix E, that the Company condt a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear 'power plant wi-thj.n one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, Io P~cb~go~ Qg ~~BIO

22 AUG

/986 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory DC 20555 Commission'ashington,

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant

~,w".2thin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

XI t4exr Dav DQP

/

I r2 f(s. t5 L j ~

~~ 'll Qgc -w~I Qp~ C conracr vovn nosr os <ea'~>w Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 t T

Dear Hr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct<<a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-Cion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

-p,PM.5 ~ GOODWILL INDUSTI'I~IE(

OUR BUSlNESS VIlORKF IV FOR DISABLED PEO, IL Xp Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear Mr. Denton 9'ish to urge denial of CPS L ' request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response pl.an for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Wr GOODWILL INDUS iB)f3'UR Ql BUSINESS Ui0

'PP AUG FOR DIShBLED PBS Ioe6

- Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

~ ~

Et L1 I

Ev n

Dear Mr. Denton:

~

wish to urge denial of CPSL's request for exemption fr~de the requirement,qunder 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of,. the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial I operation of the plant or before operating at

~ greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerel

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response p='an for its Shearon Harris nuclear power plant within one year before beginning commercial operation. of the plant or before operating at greyter than'3five percent of rated power.

Because of (he need- for changes in the evacua-p tion plan, believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Dent'on,, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 PM

( SinqlaiP J-':

yvj8,

~

g86I 3~ld0 lB', SIG 803 9A< 14 j"'na ~Ao Ã

'No SHI~iCiiGill'illR0009

Dear Hr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, 'un'der 10 CFR 50, Appendix E, that the Company condu0t a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial

'operation of the plant or before operating at greater than five percent of rated power.

,Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely

~ fi o <77

1 LUG IQGQ Mr.'. Ha'roid Denton, Director Offi;ce of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conBuct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincere

4 yGH M MIIIIIT ILL fttp95jlg 2! AUlp.

I986 OUR BUSI+

Foe QisAI!gy ~ '

'14~ />

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.,

Denton:

We are pleased that you denied "backfit status" for two design changes to Shearon Harris. We are hoping that you will require CPS,L to meet the specific NRC regulations in full. We also hope that you artfully investigating the substance of our concerns in'the Petition to Intervene and the Motion to Stay the Immediate Effectiveness of the NRC's Licensing Board's Final Decision on Shearon Harris.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation,.

Nuclear Regulatory Commission Washington, DC 20555 oc>

~ ~

C3 C3 z ~r-t 'rl

~ wo Cf

~~cr fTl

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement~~nder 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the, Emergency Response Plan for its Shearon Harris nuclear power plant wf.thin one year before beginning commercial

~

operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

s'55"+

,CONT4~g yy $

~ p Mr. Harold Denton, Director Office of Nuclear=Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

JaHl ~l,;,'"

Dear -Mr. Denton:

882.'

wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

GOODVIILL INDUS-'fFI S.

OUR BUSINESS VvOR, FOB DISABLED PE PL Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, unB'er .10 CFR 50, Appendix E, that the Company condbct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial opo.ration of the plant or before operating at, greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response P1an for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Be~ause of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

OOOO YIlLL lHDL'M %F oua DUslNESS,~~ .K~

Cll "gP AUG Foe DtS<BLED',PE

~lSS6 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Mashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI"s request for exemption from the requirement;, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Pla~ for its Shearon Harris nuclear power plant withi'n one year before beginning commercial ope'ration of the plant or before operating at greater than five percent of rated power.

Bee.ause of the need for changes in'he evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all. pe Sincerely, f oft

G OODvllLL INEglQI%lfs'UR BUSINESS 4'OR 01SABl.EO'Fs Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 J

4 ~

Dear Hr. Denton:

I l wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response

,-P3.an for its Shearon Harris nuclear power plant wi'thin one year before beginning commercial operation of the plant or before operating at

- greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

19'lExr

~2l~

g" gglÃjg

~pgppct 1 Mc@

D.$ .,

0IIR pD$ Y Fjl

'X Mr. Harold Denton, Director Office. of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPSL's request for exemption from the requirement, ~under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant wit'nin one year before beginning commercial bperation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at, all.

Sincerely, 2 8/W

Mr. Harold Denton, Director Offi'ce of Nuclear Reaction Regulatio Nuclear Regulatory Commission Washington, DC 20555

~ S C

tj

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50 Appendix E, that the Company conduct a full participation exercise. of the Emergency Respons, plan for its Shearon Harris nucl'ear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated pover.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

OlJR jpgp~

O8 &k BUSIgE<'j,i'@<<

FOR OfSABLF>~ P'OogQp Ck~~ PC g. 7 a ~ <

'r.

Harold Denton, Director Office of Nuclear React,ion Regulatio Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

PZF@%.~;;.

~ip~eL-.Hru,~p'lp i

~,tY c aiirt c r v our'n,o Mr. Harold Denton, Director Office of Nuclear Reaction Regulatio.".

Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton.:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50,.

Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

,Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitti d to operate at all.

Sincerely,

GOOD WILLIIL'/gled

0) OUR BUSIIIIES.~ I,rf Sf 6-FOR DISABLED)P'l

%00 Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI 's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant

, within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 t

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response

>lan for its Shearon Harris','nuclear power plant

,within one year before beginning commercial operation of the plant or before operating at

.greater than five percent of rated power.

, Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plarit is permitted to operate at all.

Sincerely,

F3a.v AC/ i~"'c iv)S GiVF.-TO UgiTEof, 3g p Pgtg D.c

/ il

- CERESAtii. Phi.sy~k "

Cp gt~uc HELP DlSABLED P..[PL, Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's r~equest for exemption from the requirement, u'ader 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is per 'tted to operate at all.

Sincerely,

(C~

gs PQi;

/986 Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPSI 's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant

~within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

5

~

Mg C HAPL 4 Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company,conduct a f ull participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

QJE TO Uth',HiEQair v(s nN CEBEBRAL PAL, Y- --.,

zi augf Q - HEg+IPPLED PE JF

'l4 E

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatio Nuclear Regulatory Commission Washington, DC ZQ555