ML18019B160
| ML18019B160 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/03/1986 |
| From: | Bostian B, Griffith L, Mann S, Morris W AFFILIATION NOT ASSIGNED |
| To: | Harold Denton NRC |
| References | |
| NUDOCS 8609100028 | |
| Download: ML18019B160 (8) | |
Text
yL
\\"
ACCESSION NBR:
FAC IL: 50-400 AUTH. NAME NORRIS> W. R.
BOSTIAN> 8-MANN>S.
RECIP. NAME DENTON> H.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8609100028 DOC. DATE: 86/09/03 NOTARXZED:
NO Sheav on Harris Nucleav Powev Plant>
Unit 1> Carolina AUTHOR AFFILIATION AffiliationNot Assigned AffiliationNot Assigned AffiliationNot Assigned REC IP XENT AFFILIATION NRC No Detailed Affiliation Qiven DOCKET 05000400
SUBJECT:
Uv ges denial of util v equest fov of 10CFR50>App E to conduct full emergencg v esponse plan wuthin 1
DISTRIBUTION CODE:
YE03D COPXEB RECEIVED:
TXTLE: Request fov NRR Action (e. g.
- 2. 206 exemption fv'om req,uirement pav ticipation exev cise of gr of commev cial opev ation.
Petitions) 8r'elated Correspondenc NOTES: Application for pev mit v enewal filed.
05000400 RECIPIENT ID CODE/NAME PMR-A PD2 LA BUCKLEY> B 01 COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME P4lR-A PD2 PD COP IES LTTR ENCL 1
INTERNAL: EDO/ACB ELD D
ILE EXTERNAL: LPDR NSIC 04 03 05 1
1 1
1 1
1 1
1 1
1 ELD/HDS1 NRR DIR NRC PDR 02 1
1 1
TOTAL NUMBER OF COPIES REQUIRED'TTR 11 ENCL 11
'I'3)I )L)rl UPI:<I ~'~):AATUN t,<)X'20%68
<3TAri.:XI<I G<.:t)t)',)k<O.'
arri go~-3
~r,
.t irr(<,;,lira/< g tt<o1
~< ~foul>i.<or'c'9 1~iiII < "~k IT I lh )Ic"ITU'1 b9frpL82A ZOIC
<r~k ', ftsi I, i l Ice be<>pie "A fo!~ <rui$'-i f. H'10 bor<L<iaeA foPI
<r< iver.il'i<I'-Ih I1CIITAK,IK I lh I'Y l1:~U
<raviU no~.5'sr I iRWA b@Lxt<.I<<G
<~l'1
~ ')HN Hf~N Vir.l)'P,~~ 3.,-.'~~
OOf Oc,. 3i;:"'F ll <riI'i.I.l I">> I'>
><,YiA<'
.!<l"'."
~l'I"diV'<
. II'<,~'-<'"a - ~ '~<<$I
,I I <'ir:) I'NH<$
t r <r '<. e "ri < r
'<o 9!i )
ffo 5~+6 T'}q pox mu rq rioifqmu s voi trouper f.i.0u
~ i I.,~i,rr b '!.
< rU: <'.~.Ii afar&.'~x
<<<or..I'<'qi ~i9'r,iq 2 iud
+aubrroa t.8 9
qqh.t)~>~~.I;>t)J 1o o f<<x ~ <'~mmov 'io v<j t rri<I8uu
<ra<',q aorroq'. z',
I<a<r'>P,'<-:<<<"<
- =3K 7,'-,'4')N RTJ:03VI33'3R 3Ic'0:)
OCO:~V
=3<<<.') NQ~
Ur<~RT T(r,
.,6'3br<Rqc~'3'r'rOG b9fi>f.'<0>>>>~i (c~f<OLfL$'3 I CROAK.Fi
.Q.O) r<OXf PA H~IYI 'l'O
'i
. 'u<rlii <<$ <
".3.I I
~
II 00i~OOO.l 0
.bglx.<
I.< vorr <=r J ie r~<<<r<< I rrol i;,->if,.r,"<'.4'.~.'t,'er PBI'll)0 J:)'A3 Hl"<" I
<'I'<3 1 <<II33R
- RYANX3003 QI G~
-ae A-RXS
'il.lY, IQQ JDI13 RTTJ I'Y< lT.RJ')'>l Itch<<AJQU.") ~
h I
~ar> "l k~)
>li,Y'=I.I)l pl)>I EBGHXGJ3 RIG RRN
<<."~St)(l 3 t'ai
~,', I>>
IAI>i)I.~I'"
- ) f.'!I <
Dear Mr. Denton:
~p wish to urge denial of CPS,L's request for mkemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, hip
4
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, undep 10, CFR 50, Appendix E, that the Company conduct,h full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
<3~ ~9
~go5
Dear Mr. Denton:
I wish to urge denial of CPS,I 's request for exemption from the requirement, und r 10 CFR 50, Appendix E, that the Company conduct a full paarticipation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Dear Mr. Denton:
I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Ccqpany conduct a full participation exercise. of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Cappany conduct a full participation exercise
-of the Emergency
Response
Plan for.its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, Cg~ ~ Q