Urges Denial of Util Request for Exemption from Requirement Under 10CFR50,App E That Full Participation Exercise of Emergency Response Plan Be Conducted for Plant within 1 Yr Prior to Commerical Operation
ML18019B145
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/01/1986
From: Holzer L
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8609050192
Download: ML18019B145 (6)


Text

REQUL RY INFORNATION DIBTRIBUT SYSTEM (RIDB)

ACCESSION NBR: 8609050192 DOC. DATE: 86/09/Oi NOTARIZED: NO DOCKET ¹ FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i. Car olina 05000400 AUTH. NAKE AUTHOR AFFILIATION HOLZERp L. Affiliation Not Assigned RECIP. NAKE RECIPIENT AFFILIATION DENTONi H. Office of Nuclear Reactor Regulation. Director (post 851125

SUBJECT:

Urges denial of util request for exemption from requirement under iOCFR50iApp E that full participation exercise of emergency response plan be conducted for plant within 1 gr prior to commerical operation.-

DISTRIBUTION CODE: YEOSD COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) Cc Related Gorrespondenc NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/MANE L TR ENCL PNR-A PD2 L* P4lR-A PD2 PD 1 gUCKLEYiB 01 INTERNAL: EDO/ACB ELD/HDS1 NRR DIR EXTERNAL: LPDR NBIC 04 03 05 NRC PDR '2 TOTAL NUBBER OF COPIES REQUIRED: LTTR ENCL ii

I  % 41 "f <<lf << <<~ " 4,<<

II"

'<<4$ << >> ~ f 0 ll<<il 4 4

'<<h I P 4 I'

'hf "<<

ii -. 4 df'f., f fd lh,f Kh, 4 WI<<h'll <<$ 44 4'

Nh ~l ~~ A, if hh << l lf jhh f" >>>>

'4<'fh1h~<<d Nl I,f P. P,,w h

J5f 1

~

' 4 d.ll Wh' r' lf'3 <df IW II) 4 4

~ 'l<<rl I

lff<<g N Ill'I <<4 I (gd wt 4(f 4 II'4<<h P

I dr 7,l ~

4'<< ."4 4

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Nashington, DC 20555 I 1 I I I I I I l l l I I I I l I I l I I!I l I l l I I I l I 8609050192 860901 PDR ADOCK 05000400 H PDR i.

0

'L

Dear Mr. Denton:

I wish to urge denial of CPSL's re ueet for exam tion from the requirement, under li 0 lCFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

)gal~

0 /