'I ACCESSION NBR:
FAC IL: 50-400 AUTH. NANE EDDS> T.
CLAPTON> L. D.
ANDREWS> F.
RECIP. NANE DENTON> H.
REQUL RY INFORl')ATION DIBTRIBUTI BYBTEN (R IDB) 8608260165 DOC. DATE: 86/08/22 NOTARIZED:
NO DOCKET I Shearon Harris Nuclear Power Plant>
Uni,t f >
Cav olina 05000400 AUTHOR AFFILIATION AFfiliation Not Assigned AFFiliation Not Assigned Affiliation Not Assigned RECIPIENT AFFILIATION Office of Nucleav Reactov Regulation>
Div ectov'post 85f f25
SUBJECT:
Package oF 4 postcav ds uv ging denial of util v'equest fov exemption fv op 10CFR50> App E
v equiv ement oF Full pav ticipationl exev cise of emev gencg v'esponse plan within one gr of opev ation exceeding 5/
oF rated power.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Request fov NRR Action (e. g.
- 2. 206 Petitions) h Related Cov v espondenc NOTES: Application Fov pev mit v eneeal filed.
05000400 RECIPIENT ID CODE/NANE
'PWR-A PD2 LA BUCNLEY. B Of COP IEB LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL: EDO/ACB D
REQ FIL EXTERNAL: LPDR NSIC 04 03 05 ELD/HDSf NRR DIR NRC PDR 02 TOTAL NUl/BER OF COPIES REQUIRED: LTTR, ENCL f 1
t l
I' W
'li I
"' UNDERSIZED DOCUMENTS
.II Dear Mr.
8608260ib5 860822 PDR ADOCK 05000400 H
PDR Denton:
wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, p (~~ F Dc7 ice u P~ ~
It>~~
< BC gpss/0
/
g'I
"'-"": '--"'-"'i
"'""iVN'DERSIZED DOCUMENTS
Dear Mr. Denton:
I wisn to urge denial of CPSL's request for exemption from the requirement, under 10 CFR.,50, A'ppendix E, that the Company conduct a full pa"ticipation exercise of the Emergency
Response
Plan for its Shearon Harris nuc3'ear power p3,ant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
/~~~.Jab >y W g ~~ g(
gg1Lgp
~ k Ptl
Dear Mr. Denton:
zgUG ~
/986 Nexr Dnv DE rvaRY Cttrtr~t:rt ItttrttSrt;SaC.t.
I wish to urge denial of CPS,Q's request for exemption rom f
the requirement, under 10 CFR 50, E
that the Company cogduet a full Appendix articipation exercise of the j;m8rcfdncy p
Res onse Plan f'ar its ea Sh ron Harris nuclear power plant within one y
h'ear before beginning commercial t operation of the plant or before operating a
greater a
than five percent of rated power.
Because of the need for changes in the evacua-I believe this exercise should be to conducted before the plant is permitted o
operate.at all.
It Sjp.ye,rely,
'3llNA
- 03. )hi'3 9d6S 0
+rr
~
f s'
"""'0:NDERSIZED DOCUMENTS
Dear Hr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plaqt or before operating at greater than five percent of rated power.
Because of the need for changes in the eV'acua-tion plan, I believe this exercise should be conducted befoxe the plant is permitted to operate at all.
Sincerely,