Urges Denial of Util Request for Exemption from 10CFR50,App E Requirement Re Full Participation Exercise of Emergency Response Plan within One Yr of Operation Exceeding 5% of Rated Power.Changes Needed in Evacuation Plan
ML18019B118
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/22/1986
From: Andrews F, Clapton L, Clopton L, Edds T, Johari Moore
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8608260165
Download: ML18019B118 (7)


Text

'I REQUL RY INFORl')ATION DIBTRIBUTI BYBTEN (R IDB)

ACCESSION NBR: 8608260165 DOC. DATE: 86/08/22 NOTARIZED: NO DOCKET I FAC IL: 50-400 Shearon Harris Nuclear Power Plant> Uni,t f Cav olina

> 05000400 AUTH. NANE AUTHOR AFFILIATION EDDS> T. AFfiliation Not Assigned CLAPTON> L. D. AFFiliation Not Assigned ANDREWS> F. Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H. Office of Nucleav Reactov Regulation> Div ectov'post 85f f25

SUBJECT:

Package oF 4 postcav ds uv ging denial of util v'equest fov exemption fv op 10CFR50> App E v equiv ement oF Full pav ticipationl exev cise of emev gencg v'esponse plan within one gr of opev ation exceeding 5/ oF rated power.

DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Request fov NRR Action (e. g. 2. 206 Petitions) h Related Cov v espondenc NOTES: Application Fov pev mit v eneeal filed. 05000400 RECIPIENT COP IEB RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL

'PWR-A PD2 LA PWR-A PD2 PD BUCNLEY. B Of INTERNAL: EDO/ACB ELD/HDSf D NRR DIR REQ FIL 04 EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUl/BER OF COPIES REQUIRED: LTTR, ENCL f1

t l I'

W 'li I

"' UNDERSIZED DOCUMENTS

.II 8608260ib5 860822 PDR ADOCK 05000400 H PDR

Dear Mr. Denton:

wish to urge denial of CPSL's request10 for CFR 50, exemption from the requirement, under full Appendix E, that the Company conduct a

Response

participation exercise of the Emergency Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise is should be permitted to conducted before the plant operate at all. F Dc7 p (~~

Sincerely, ice u P~BC gpss/0

~ It>~~

/

g'I

"'-"": '--"'-" 'i "'"" iVN'DERSIZED DOCUMENTS

Dear Mr. Denton:

I wisn to urge denial of CPSL's request for under CFR .,50, exemption from the requirement,conduct a full 10 A'ppendix E, that the Company Emergency Response pa"ticipation exerciseHarris of the Plan for its Shearon nuc3'ear power p3,ant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise shouldto be conducted before the plant is permitted operate at all.

Sincerely,

/~~~.Jab >y W g ~~ g(

gg1Lgp Nexr Dnv DE rvaRY

~k Ptl

Dear Mr. Denton:

< zgUG ~

Cttrtr~t:rt ItttrttSrt;SaC.t.

/986 I wish to urge denial of CPS,Q's request 10 for CFR 50, under exemption f rom the requirement, cogduet a full Appendix E that the Company of the j;m8rcfdncy Resplant p onse articipation exercise h'ear Plan f'ar its Sh eabefore within one y the plant beginning operation o f ron Harris nuclear power commercial or before operating a t of rated power.

greater than a five percentchanges in the evacua-Because of the need for exercise should be I believe this permitted too conducted before the plant is operate .at all. 9d6S It 0

Sjp.ye,rely,

03. )hi'3

'3llNA

+rr ~

f s'

"""'0:NDERSIZED DOCUMENTS

Dear Hr. Denton:

I wish to urge denial of CPSL's request for under 10 CFR 50, exemption from the requirement,conduct a full Appendix E, that the Company Emergency Response of the participation exerciseHarris Plan for its Shearon nuclear power plant within one year before beginning commercial operation of the plaqt or before at operating of rated power.

greater than five percentchanges in the eV'acua-Because of the need for this exercise should be tion plan, I believe plant conducted befoxe the is permitted to operate at all.

Sincerely,