DOCKET 05000400
SUBJECT:
Opposes util exemption from v equiv'ement of full pav'ticipation emev gencg plan test IIIithin 1 Ijr pv'iov to QL is su avl c e.
DIBTRIBUTION CODE:
YECBD COPIEB RECEIVED: LTR J ENCL O BI ZE:
3 TITLE: Request fov NRR Action (e. g.
- 2. 206 Petitions) 8c Related Covrespondenc REGULATORY INFORMATION DISTRIBUTION YBTEN (RIDB)
ACCESBI QN NOR: 8606i 90256 DOC. DATE: 86/06/i 9 NOTARIZED:
NQ FACIL: 50-400 Bheav on Hav ris Nuclear PoIIIer Plant>
Unit i>
Cav olina AUTH. NAJ'IE AUTHOR AFFILIATIQN RICHARDSON> C. L.
AffiliationNot Assigned FIELDS> J.
AffiIiation Not Assigned NUNNERY> W. C.
AffiliationNot Assigned RECIP. MANE RECIPIENT AFFILIATZGN DENTON> H.
Office of Nuclear Reactor Regulation>
Directov
<post 85ii25 NOTES: Application fov pev'mit reneIIIal Filed.
05000400 RECIPIENT ID CODE/NANE PNR-* PD2 LA aUCWt EY, a 0i INTERNAL: EDQ/ACB ELD/RED 04 COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDBi NRR DIR COPIES LTTR ENCL EXTERNAL: LPDR NSIC 03 05 i
ii NRC PDR 02 TOTAL NUBBER OF COPIES REQUIRED:
LTTR ii ENCL i
I N
t t
lt L,
I I(
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
I Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, 8606190256 860619 PDR ADOCK 05000000 PDR
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& fight, Emergency Plan
Dear Mr. Denton,
I Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actual3.y be imp3,emented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering, withdrawing from the present emergency plan.
- Clear3y, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fu13y resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
al &MB Sincere3.y,
+ Ab&RA)
K 3
'V I
I,'
Jt IF II
'I r
I UI I
F I'
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Rashington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant Carolina Power S Light Bnergency Plan
Dear Mr. Denton,
Carolina Power 8 Light Company has not conduted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan. Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.
Betty Cross Rt.3, Box 698 Hillsborough, N.C.
27278