ML18019A982
| ML18019A982 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/10/1986 |
| From: | Howell A AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606100447 | |
| Download: ML18019A982 (2) | |
Text
4 0
REQU ORY INFORMATION DISTR IBUT SYSTEN (R IDS)
"~
g'4 f4 ACCESSION NBR: 8606100447 DOC. DATE: 86/06/10 NOTARIZED:
NO DOCNET 0 FACIL:50-400 Shearon Harris Nuclear Power Planti Unit 1> Carolina 05000400 AUTH. NAHE AUTHOR AFFILIATION HOWELL> A.
Affiliation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulationr Director (post 851125
SUBJECT:
Opposes util exemption Prom requirement of full participation emergency plan test utithin 1 gr prior to OL issuance.
DISTRIBUTION CODE:
YEOSD COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Request
+or NRR Action (e. g.
- 2. 206 Petitions) 8r Related Correspondenc NOTES: Application for permit renewal filed.
05000400 REC IP IENT ID CODE/NAME PMR-A PD2 LA BUCKLEY'S B 01 INTERNAL: EDO/ACB ELD/RED RE(; FILE COPIES LTTR ENCL RECIPIENT ID CODE/NANE PAR-A PD2 PD EL D
RR D
COP IES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
( 301 ) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
1 Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuc'lear plant as required by federal regulation, 10 CPR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
PDR g
~8+0610 8M~-
H
< 0~000<00 PDa