ML18019A947
| ML18019A947 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/10/1986 |
| From: | Lefbortz L AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606100126 | |
| Download: ML18019A947 (3) | |
Text
REQUL RY INFORMATION DISTRIBUTI SYSTEN (RIDS)
ACCESSION NBR: 8606i00i26 DOC. DATE: 86/06/i0 NOTARIZED:
NO DOCKET 0 FACIL:50-400 Sheav on Harv'is Nuc 1eav Pouer Planti Unit i.
Cav olina 05000400 AUTH. NAHE AUTHOR AFFILIATION LEFBORTZ, L.
AffiliationNot Assigned RECIP. NANE REC IP XENT AFFILIATIQN DENTQNi H.
Office of Nucleav Reactor Regulation.
Direc tov (post 851 i25
SUBJECT:
Opposes util exemption +rom v equiv'ement of full pav ticipation emev gencg plan test within i gr pv'ior to QI issuance.
DISTRIBUTION CODE:
YEOSD COPXES RECEIVED: LTR ENCL SIZE:
TITLE: Request fov NRR Action
<e. g.
- 2. 206 Petitions) 5 Related Correspondenc NOTES:Application fov pevmit v enewal filed, 05000400 REC IP XENT ID CODE/NAt'IE PNR-A PD2 LA BUCKLEY.B oi COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD COP IFS LTTR ENCL, INTERNAL: EDO/ACB FILE EXTERNAL: 24X NRC PDR 04 02 ELD/HDSi NRR DIR LPDR NSIC 03 05 TOTAL NUNBER OF COPIES REQUIRED LTTR i2 ENCL
") Q~~
Q+ /FAV Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power 8 Light, Emergency Plan
Dear Mr. Denton,
I Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
. At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, SbOb10012b 8bOb10 H
PDR PDR ADOCK 05000400