ML18019A846
| ML18019A846 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/28/1986 |
| From: | Rulison M AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606040015 | |
| Download: ML18019A846 (4) | |
Text
1$;
ACCESSION NBR:
FACIL: 50-400 AUTH. NANE RULISQNi t'f.
REC IP. NAME DENTONp H, REQULATO INFORMATION DISTRIBUTION STEM (R IDB) 8606040015 DOC. DATE: 86/05/28 NOTARIZED:
NO DOCKET ¹ Sheav on Hav ris Nuclear Power Plant>
Unit I>
Cav olina 05000400 AUTHOR AFFILIATION Affiliation Not A551gned RECIPIENT AFFILIATION Office of Nuc 1 eav Reactor Regul ationt Div'ec tov'p ost 85f 1 25
SUBJECT:
Suggests that NRC increase evaluation radius around plant to 25-35 miles. Full-scale emergencM evacuation exev'cise should be held before OL granted.
DIBTRIQUTIQN CODE:
YE03D COPIES RECEIVED: LTR
~
ENCL 0 SIZE:
TITLE: Request
+or NRR Action (e. g.
- 2. 206 Petitions>
Cr Related Cov v'espondenc NOTES:Application fov permit v eneual Piled.
'05000400 RECIPIENT ID CODE/NANE PWR-A PD2 LA gUCKLEY B Oi CQPIEB LTTR ENCL RECIPIENT ID CODE/NANE P4lR-A PD2 PD COP IEB LTTR ENCL INTERNAL: EDO/ACB ELD/
ELD/HDBi NRR DIR EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOTAL NUBBER OF COPIEB REQUIRED:
LTTR 12 ENCL
~:
g~Ah C
1 a
~~
0 .
Ipl'l p,
"'p>>
(
V
~
w '1$ I k~l l~
th l',
~" II i g
!.< '3 ', '3 l'k '7 U l@
lc
)
y, 4
II, y
N c".'4
>i~
, "<< t 'fi,'
P
)gp 1,
'>$',f >,I, g
~ Qi, g
8 gfg$,,>
$ i
,,, y,
~ I, r<-V.~ ~3>>
j aX g 1I 0
I Ck C
fJ I
I 4'
" 0.39 P'" ( I',l
~sf Cl'lgV J
j'I II
Michael
- v. E. Rulison 3256 Lewis Farm Rd.,
- Raleigh, NC 27607 28 MAY 1986 Mr. Harold Denton, Dirctor Nuclear Reactor Regulations US Nuclear Regulatory Commission VASHINGTON DC 28555
Dear Mrs Denton:
CP&L Shearon Harris Nuclear Reactor EVACUATION PLAN I understand NRC is considering reducing the evacuation radius around nuclear electric generating facilities to 2 miles from 18 miles.
Does this mean that NRC believes evacuation is basically a futile effort and not worth doing?
If that is not the NRC position, then I suggest that more is better and that the radius should be increased to 25-35 miles.
That is certainly the appropriate radius for the Shearon Harris plant,,which has three major population centers in the 15-35 mile zone (Chapel Hill, Durham, Raleigh).
- Moreover, I believe a full-scale emergency evacuation exercise SHOULD BE HELD before an operating license is granted.
The con-cerned parties have know for many years that the plant was under-way. There is not reason to delay that exercise now. Let us find out beforehand whether evacuation is possible.
I am opposed to exempting CP&L from this exercise until after the plant is operating.
Thank you very much.
Michael Rulison
'6060400iS 8608>8 0
PDR ADOCK 0>
~f05 i(y
t J
p J
'I tl M
I 4
1