ML18019A790
| ML18019A790 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/25/1986 |
| From: | Holloway C NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML18019A789 | List: |
| References | |
| NUDOCS 8605010513 | |
| Download: ML18019A790 (3) | |
Text
Docket No. 50-400 R S5 )986 STR IBUTION w/encl:
cet ie CJHolloway RMDiggs DWeiss Manpower File LFMS R/F LSolander, NRR
- MKaltman, NRR
- CHarwood, NRR
- BBuckley, NRR MEMORANDUM FOR:
Files FROM:
SUBJECT:
C.
James Holloway, Jr., Acting Director License Fee Management Staff, ADM HARRIS 1
OPERATING LICENSE REVIEW COSTS 10 CFR 170 of the Commission's regulations for license fees was revised effective June 20, 1984.
Section 170.12(b) of the revised rule provides that for applications for operating license (OL) review which have been pending with the Commission for six months or longer, billings would be made at six-month intervals until the review is completed, whichever is earlier.
In accordance with Section 170.12(b),
we have reviewed the cost incurred by the various program offices directly involved in processing the operating license for the period December 23, 1984 through June 22, 1985.
Attached is a summary of the review costs as well as the supporting documentation from the program offices.
The attachment shows that a
total of $731,966 was expended for the OL review.
When these costs are added to the costs of $2,876,329 from the previous billing periods, the cumulative costs through June 22, 1985 are
$3,608,295.
This total exceeds by $530,895 the maximum fee of $3,077,400 as currently stated in 10 CFR 170.21.
Accordingly, $530,895 has been subtracted from the costs of $731,966 leaving a balance due of $201,071.
Enclosure:
Summary of Costs and Supporting Documentation
- Signed, C. dames iiognvr'ag, P~]
C.
James Holloway, Jr.
Acting Director License Fee Management Staff Office of Administration OFFICE:LFMS:
0 SURNAME loway:jp DATE
- 4 ~
86 Sb05010513 Sb0425 PDR ADOCH, 05000400 A
0 I
f(
Carolina Power and Light Company Operating License Review Costs From 12/23/84 Through 6/22/85 FACILITY: Harris 1
DOCKET NO.:
50-400 Program Office Review Costs Per Professional Professional Staff-Hours Staff-Hour Contractual Total E
ff-tl
~E" "d d Costs Costs Costs 1.
$62 1,688.5
$ 104,687
$48,276
$ 152,963 2.
IE-Hg 53 1,471.0 77,963 328,402 406,365 3.
REGIONS 53 3,195.0 169,335 169,335 4.
ACRS 62 21.0 1,302 1,302 5.
- NMSS 58 34.5 2,001 2,001 TOTAL COST:
$731,966 U
+When the costs of $731,966 are added to the costs of $2,876,329 for the previous billing
- periods, the cumulative costs through June 22, 1985 are
$3,608,295.
This total exceeds by $530,895 the maximum fee of $3,077,400 as currently stated in 10 CFR 170.21.
Accordingly, $530,895 has been subtracted from the costs of $731,966 leaving a total of
$201,071 to be assessed.