Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Application for Construction Permit DKT 50
MONTHYEARML18018A9441978-08-16016 August 1978 Letter Transmitting a Request for Amendment of Construction Permit ML18018B0821978-07-26026 July 1978 Letter Responding to Request for Advice in Regard to the Revised Application to Construct Unit 2 and Advising That No Antitrust Hearing by the NRC Will Be Required ML18018A9461978-02-27027 February 1978 Letter Enclosing a Pleading Entitled Request for Extension of Latest Completion Date. ML17037C3551968-06-0606 June 1968 Letter Regarding Amendment No. 2 to the Application for a Construction Permit and Operating License and Enclosing Additional Information Necessary to Continue the Review ML17037C3561967-12-21021 December 1967 Letter Regarding an Application for a Construction Permit and Facility License Authorizing Construction and Operation of a Reactor and Transmitting a Copy of the Fish and Wildlife Service Report on Radiological and Non-Radio .. ML17037B7971964-12-21021 December 1964 AEC Hearing on Proposed Niagara Mohawk Nuclear Plant Set for January 19 at Oswegp, N.Y. and Hearing on Niagara Mohawk Nuclear Plant Postponed, Prehearing Conference to Be Held December 15 1978-08-16
[Table view] |
Text
/oft'~/
liEGULATORY INFORMATION DISTRIBUTION SYSTEM < RIDS)
DISTRIBUTION FGR INCOMING MATERIAL 50-410 REC: DFNTON H QRG: FARQN R S DOCDATE: 08/16/78 NRC LEBGEUF LAMB LEIBY ET AL DATE RCVD: 08/16/78 DQCTYPE: LLTTER NOTARIZED: YES COPIES RECEIVED
SUBJECT:
LTR 3 ENCL 20 FORWARDING REQUEST FOR AMEND GF CONSTRUCTION PERMIT NO CPPR-112'UNIT 2)i CONCERNING INCLUDING TRI-COUNTIES CONSTRUCTION TRUST A CO-OWNER AND CQ-.APPLICANT OF SUBJECT f ACILITY... NOTARIZED 08/ii/78.
PLANT NAME: NINE MILE POINT UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL: ~
<<+<<<<<<<<<<<<<<<<<<<<<<<<<<<4~ DI TRIBUTIGN OF THlS MATERIAL IS A FOLLOWS <<<<<<<<<+<<<<<<<<<<<<<<<<<<<<<<
LICENSE APPLICATlGN AMDTS (GENERAL INFO)
(DISTRIBUTION CODE B005>
FOR 'CTION: BR CHIEF LWR84 BC<<<<W/ENCL PRGJ MGR KAME<<+W/ENCL LIC ASST LWR14 LA<<<<W/ENCL FOR INFO: MOORE<<<<LTR ONLY< 1) EPBS2 BC<<<<.l TR ONLY < 1 )
FOR INFO: NORRIS<<<<LTR ONLY(1> DUNCAN<<<<LTR ONLY(i>
INTERNAL: BEG .F /ENCL NRC PDR<<<<W/ENCL
<<~~W/2 ENCL GELD<<<<W/ENCL HANAUER4H~W/ENCL MELTZ4<<W/ENCL SALTZMAN<<<<ll/ENCL RUTBERG<<<<W/ENCL EXTERNAL: LPDR S OSWEGO NY<<<<W/ENCL TERA<<<<W/ENCL NS I C <<<<W/ENCL ACRS CAT B<<+W/3 ENCL DISTRIBUTlON: LTR 22 ENCL 18 CONTROL NBR: 782200278 SIZE: iP+4P THE END
'4 g I
~ ~
L,.[lg..fg., ocKET t ILE c(Ipj'757 N STREET>> N.W.
WASHINGTON, D. C. 20036 TCLCI>>HONK 202 457 ~ 7500 CABLE ASDRE55 LEON A. ALLEN>> JR. CAMEROH F.M*cRAC 4 RAHDALL J. LcSOEUF>>JR. I929 I975 JOSEPH C. BACHKLDER, III CAMCROH F MACRAK>>IK 4 L COW lk>> WASHINGTON>> 0. C.
ERNEST S. BALLARD JR. G>>CRARD A. MAHKR HORACE R. LANS I934 I977 G. S. PETER BERGEN 4 SHEILA H. MARSHALL TELEX: 440274 OCOFFRY D.C. BCST JAMES G. McELROY ADRIAH C.LKISY l952 I97B DAVID P. BICKS JAMES P MCGRANERY. JR. 4 TELECOPIER:
TAYLOR R. BRIGGS PHILIP PALMER McGUIOAN CHARLES N.BURGER HARVEY A.NAPIKR 202 457 7543 THOMAS C.BVRKC JAMES 0 MALLCY.JR.4 ROGER D. FELDMAN i~ 4 J. MICHAEL PARISH EVGENC R. FIDCLL i4 WILLIAMW. ROSKNBLATT JACOB FRICDLANDCR JOHN A. RUDY OERARD GIORDANO PAUL G. RUSSELL DONALD J. ORKENC PATRICK J SCOGHAMIGLIO
~ l40 BROADWAY JAMCS A. O REER, IL 4 HAROLD M. SEIDEL JOHN L. OROSE 4 HALCYON G. SKINNER HEW YORK,H.Y. I0005 DOUGLAS W. HAWKS JOSEPH S.STRAUSS CARL D.HOBELMAN SAMUEL M.SVODCN TELEPHONE 2I2 2B9 II00 MICHAEL IOVCNKO JAMES F. JOHNSON, 4>>
RONALD D. JONES LEONARD M. TROSTIFH i I CUGCNC B.THOMAS JR. 4 HARRY H. VOIGT i4 Augus t 16, 19 78 CABLE ADDRESS LKX K. LARSON 4 H RICHARD WACHTCL
~ LCSWIN, NEW YORK GRAN T S. L EWI 5 GERARD P. WATSON I
K MBA W. LOVEJOY THOMAS A. ZIKRK TCLCX: 4234IB RESIDENT PARTNERS WASHINGTON OFFICE '
4 ADMITTED TO THE DISTRICT OF COLUMBIA BAR
>>V
(>>I I>>>>7 C=
Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Niagara Mohawk Power Corporation Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Denton:
As counsel for Niagara Mohawk Power Corporation, we hereby transmit in the above-captioned docket three (3) originals and nineteen (19) copies of a Request for Amend-ment of Construction Permit for Nine Mile Point Unit 2.
Very truly yours, LEBOEUF, LAMB, LEIBY & MACRAE By o ert S. Faron Enclosures BY HAND 7822OO278
I ph r e C
h 1 1
1
'I g
T r
I 1
L' L
't 4 1
l 4
lf l,,g li'W
~)<>j>>
"" p
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of )
)
NIAGARA MOHAWK POWER CORPORATION ) Docket No. 50-410 (Nine Mile Point Unit 2) )
REQUEST FOR AMENDMENT OF CONSTRUCTION, PERMIT On February 6, 1978, Niagara Mohawk Power Corporation
("Niagara Mohawk" ) filed a request. for amendment to Construction Permit No. CPPR-112. This request asked the Commission to amend the aforementioned Cons'truction Permit in order to include Central Hudson Gas & Electric Corporation, New York State Electric & Gas Corporation, Long Island Lighting Company and Rochester Gas and Electric Corporation as co-owners of the facility. On February 16, .1978, in the Marble Hillcase ~ln the Matter of Public Service'Com an "'of Indiana, ALAB-459),
the Appeal Board held that co-owners'ould also be deemed to be co-applicants. By letter dated April 25, 1978 from the Nuclear Regulatory Commission, Niagara Mohawk was informed that in view of the'Marble Hill decision Niagara Mohawk's request for the amendment of it's Construction Permit would be construed to include the co-owners as co-applicants.
Long Island Lighting'ompany ("LILCO") has been negotiating with the Tri-Counties Construction Trust ("Construction Trust" )
whereby for purely financing purposes 'the, Construction Trust would be created. Approval of the New York Public Service Commission is necessary and Ni'agara Mohawk" has been advised that such approval can, be expected, on or'bout August 24, 1978.
The purpose of the trust is that'during the construction phases of Nine Mile Point Unit 2 the Construction Trust will channel the funds for LILCO's share of the construction costs for the Nine Mile Point"Unit 2 facility. The principal lender to the Construction Trust;is the Chase Manhattan. Bank. Under the terms. of the Construction Trust,.the trust will hold bare legal. title to the assets'and',the entire'beneficial,interest in those. assets will be for" LILCO. At some, future time when construction is substantially completed or the first core is ready for. loading, the Construction Trust will be dissolved and the legal title to the assets of the trust wi'll be transferred from the Construction Trust to'LILCO." More details concerning LILCO and the Construction 'Trust were submitted to the. Commission on June 30., by Niagara Mohawk in'esponse.to certain questions from. the Staff relating to,the 'financial qualifications of all co-owners.
Niagara Mohawk has been advised that'this matter of a Construction Trust created during."the construction period of a nuclear facility is a case of first" impression with this Commission.
WHEREFORE, .Niagara'.Mohawk'Power Corporation prays as follows:
(l) If the. Commission deems't necessary'o include the Tri-Counties Construction" Trust;as a co-owner and co-applicant of .the faciiity'along'with'ILCO and the three other co-owners (Central Hudson:Gas & Electric Corporation, New.',York State. Electric & Gas Corporation, and Rochester Gas, and Electric Corporation), then the Construction Permit'.be so amended; or (2) If the Commission, decides' that it is unnecessary to include the Tri~Counties.'Construction Trust as a co-owner and a co-applicant, then. the Tri-Counties Construction Trust. be,omitted~from'the amended. Construction Permit and the four"co-, owners mentioned. previously in this pleading be named. as.'o-owners and'o-applicants.
0
~
( g )
~ t ~
C 1
C 4 'I'
Respectfully Submitted,
'NIAGARA MOHAWK POWER CORPORATION Geral K. Rhode, e President System Project Management Subscribed and sworn to before me this// ~ay of August, 1978.
NOTARY PUBLIC PHYLLIS D- 'VOYTKO Nota y Public In )ne Qtnto qt, New YorR Quelllleo In onon. to. Iro. 3i'e0553~g MV rlnnrrnsetrnn fvouee rrng+ 30.'19~