ML18018A904
| ML18018A904 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/26/1978 |
| From: | Rhode G Niagara Mohawk Power Corp |
| To: | Case E Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18018A904 (4) | |
Text
U.S. NUCLEAR REGULATORY~MISSION NRg FORM 195 (2 76) l4RC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER FILL NUMBER TO:
Mr. Edson G ~ Case FROM:
Niagara Mohawk Power Corp
- Syracuse, N.Y.
13202 Gerald K, Rhode DATE OF DOCUMENT DATE RECEIVED LETTER BnRIGINAL C3COPY QNOTORIZED g UN C LASS I F I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED ixz u~
DESCRIPTION
/el//cJ T Iq J 7g ENCLOSURE Forwarding revision to the Stone and Webster Engineering Corporation< 6 "Quality Assurance Program Manual, Nine Mile Point Nuclear Station - Unit 2 '
1p 100p PLANT'AME :
NINE MILE POINT UNIT 2 jcm 05/12/78 u
5/
78 FOR ACTION/INFORMATION ENVIRONMENTAL NCH CHIEF:
PROJECT MANAGER:
LIC. ASST:~
&PlhQ ASSIGNED AD:
BRANCH CHIEF:
ORF LTR F LE DR B.
HARLESS INTERNALDISTRIBUTION NT SYSTEMS SITE SAFETY G
ENVIRON ANALYSIS DENTON G iMlULLER GOSSICK G STAFF V'ANAGEMENT IVS ENGINEERING ACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK ALTZMAN PP LITO BAER UTLER F
CTORS NVIRON TECH ERNST BALLARD L OD TECH AMMILL 2
VALYSIS VOLLMER CH LLINS LPDR'IC SIC REG V J.
HANCHETT) 16 CYS SENT CATEGOR NRC FORM 198 (2.78)
EXTERNAL DISTRIBUTION KO ACRS CONTROL NUMBER 78132ppqp
I
~
Ilik'IjItgg]gE--- -,
NIAGARAMOHAWKPOWER CORPORATION NIAGARA ~l MOHAWK 300 ERIE BOULEVARD, WEST SYRACUSE. N, Y. I3202 April 26, Mr. Edson G.
- Case, Acting Director Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Vl H
gVJ m~C.-.
M~4/)
197K' PF$
Ch w
C" C/2;,
l>l P>l'~'I fSfg CA~
C %l XgJ CD
Dear Mr. Case:
Re:
Nine Mile Point Unit 2 Docket No. 50-410 This letter transmits 40 copies of revisions to the Stone and Webster Engineering Corporation's "Quality Assurance Pro-gram Manual, Nine Mile Point Nuclear Station Unit 2."
These revisions replace pages in the manual which were previously sent to Mr. J.
F. Stolz of the Nuclear Regulatory Commission by letter dated July 8, 1976.
Revisions have been made to better define Stone and Webster Quality Assurance activities for Nine Mile Point Unit 2.
Specific improvements include the appointment of a Stone and Webster Project Quality Manager and an upgrading of the Quality Assurance records systems.
Revisions to the manual are indicated in the margins with the proper revision letter.
Since these modifications improve the present
- program, implementation will be initiated May 1, 1978.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Geral K. Rhode,
'ce President System Project Management NLR/szd Enclosures (40) g@g gOo~
,v b
4t4