Docket Nos.:
50-400 and 50-401 SEp 8 0 1983 83iOi80185 830P30 PDR ADOCK 05000400 F
PDR APPLICANT:
Carolina Power and Light Company FACILITY:
Shearon Harris Nuclear Power Plant
SUBJECT:
SUMMARY
OF SEPTEMBER 26 AND 27, 1983 MEETING HELD WITH CAROLINA POWER AND LIGHT COMPANY TO DISCUSS FIRE PROTECTION On September 26 and 27, 1983, representatives from Carolina Power and Light (CP8L) and Ebasco met with members of the Chemical Engineering and Auxiliary Systems Branches.
The purpose of the meeting was to discuss the fire protec-tion open items.
Enclosure 1 is a list of attendees at the two days of meet-ings
~
The first day's activities dealt mainly with the issues covered in the Chemical Engineering Branch (ChEB) review areas.
Twelve of the twenty-one open items were closed at the meeting.
Two issues required clarification and no additional remaining ten issues were closed pending CPImL's formal response to question 280.1 or an amendment to the final safety analysis report.
A detailed listing of the items discussed during the September 26, 1983 portion of the meeting are given in Enclosure 2.
The day concluded with a meticulous review of the fire protection drawings and a discussion on possible exemption request.
On September 27, 1983, the remaining fire protection drawings were reviewed and the Auxiliary Systems Branch (ASB) discussed the Safety Shutdown Analysis (SSA).
The ASB review items are listed in Enclosure 2 and the ASB concerns on the SSA are given in Enclosure 3.
In addition, CP&L explained how to use the SSA in conjunction with the FSAR and several complimentary documentations.
ASB felt that the SSA review for Shearon Harris would require more time than normal because of the cross referencing of documents.
Additionally, ASB noted that the concerns discussed at the meeting were not an inclusive list and more concerns could result from their detailed review of the SSA.
~
~
1 t Ffl 1
II Rl Phft te II'R 1
f
~
~
NW' t et I I It 1
~ 1 1
FPPR I
1
'll thf gr 1
II
~he e
I 'R=
l I'I
, 'I II I
I~ 1 P)PR" lhv*
I 1
I 9 "el l'7
~
f't
~
II ytt 1
f,'
~ '
II
'f nr lf 1 RP II fl 1
ll g PRteR
~ li1, II FD
~
R M
'I R
"}"y fl I tf R
t,h
.,I I
f.h lf R
1 ehreele I
11 1 ~
ll P t
~ r r 11th
~ 1 III l
'1 ft I
1 II ht'PVR I
f 1,,1 Ptl ht If I
\\
l 'V I
H 1
1 P
)
1=
I R
- -'EETING SVMMARY'
'l I
<0'ocument. Contro,T (M;400/401)
=
NRC PDR t'DR,.
NSIG..
il Ll@K Reading.
'. Kni'ghtoe'.
Prospect-Manager.
JHolonich/BBuckley- ".:
.Attorney GEE':--
=. ~,-
E. L. Jordae'-"
RegionaT; Admfrivstmtor. Region O'.R Tayl'or.
,, ~
PARTICIPANTS."
NRC '=
z '
=
~
~ ~
R I
JHoloni.cubi:;,':"..;;-,;.
'",,i,'
'Wagner
-"..='
R SEP 3 0 lg83 R
~
rr
- i R
- ~
~
~
-t CPSL stated that the draft documents presented at the meeting and any addi-tional information that required docketing would be submitted within two weeks.
The staff noted that none of the issues would be closed until the necessary information has been docketed.
B. C. Buckley, Project Manager Licensing Branch No.
3 Division of Licensing
Enclosures:
As stated Joseph J. Holonich, Project Manager Licensing Branch 1
Division of Licensing cc w/enclosures:
See next page D:
3 JH ch'ph 9/~/83 DL:LB¹ BBuckley 9/q/83
¹3 DE;ChEB G'ghton PEberly 9/
/83
. 10/ 0 l'83
4 l
I lli
~ scag 1
h~,>>'
A 1$ 1I I
'I II IIII
'k I
'<< I t ~ p I'g II p'
0 Shearon Harris Mr.
E.
E. Utley Executive Yice President Power Supply and Engineering and Construction Carolina Power 5 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 cc:
George F, Trowbridge,
- Esq, Shaw, Pittman, Potts 5
Trowbridge
. 1800 M
- Street, NW Washington, D.
C.
20036 Richard E. Jones, Esq.
Associate General Consel Carolina Power 5 Light Company 411 Fayetteville Street Mall
- Raleigh, North Carolina 27602 M. David Gordon, Esq.
Associ.ate Attorney General State of North Carolina Post Office Box 629
- Raleigh, North Carolina 27602 Thomas S. Erwin, Esq.
115 W. tiorgan Street Raleigh; North Carolina 27602 Mr. George Maxwell Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Charles D. Barham, Jr.,
Esq.
Yice President
& Senior Counsel Carolina Power 5 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 Mr. John Runkle, Executive Coordinator Conservation Council of North Carolina 307 Granville Road Chapel Hill, North Carolina 27514 Mr, Wells Eddleman 718-A Iredell Street Durham, North Carolina 27705 Mr. George Jackson, Secretary Environmental Law Project School of Law, 064-A University of North Carolina Chapel Hill, North Carolina 27514 Dr. Ph~]) is Lotchi n Chapel Hill, North Carolina 27514 Mr. Travis Payne, Esq.
723 W. Johnson Street Post Office Box 12643
- Raleigh, North Carolina 27605 Mr. Daniel F.
- Read, President CHANGE Post Office Box 524 Chapel Hill, North Carolina 27514 Bradley W. Jones, Esq.
U.S. Nuclear Regulatory Commission Region II 101 Marietta Street Atlanta, Georgia 30303 Richard D. Wilson, M. D, 725 Hunter Street Apex, North Carolina 27502 Regional Adminstrator - Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303 Robert P. Gruber Executive Director Public Staff - NCUC Post Office Box 991 Raleigh, North Carolina 27602
Shearon Harris Dr. Linda Little Governor's Waste Management Board 513 Albemarle Building 325 North Salisbury Street
- Raleigh, North Carolina 27611
ENCLOSURE I ATTENDANEES AT FIRE PROTECTION MEETING I
Joe Holonich R. Eberly Margareta Serbanescu Dennis E. Connelly John G. Garibaldi Matt Stokes Steve Hardy David C. McCarthy John Eads Dean Tibbitts Bart Buckley Ed Williamson Dean Shah E.
Chan N. Wagner NRC/Licensing NRC/DE Ebasco/Fire Protection Ebasco/Nuclear Licensing Ebasco/Nuclear Licensing SNHPP Fire Protection CP&L Harris Engineering CP&L Harris Engineering CP&L Licensing CP&L Harris Ops.
NRR/DL/LB¹3 Ebasco/Fire Protection Ebasco/Fire Protection Ebasco/Mech.
Engineering NRC/ASB
ENCLOSUE 2 FIRE PROTECTION ITEMS Items 1.
Fire Hazards Analysis 3.
Administrative Controls 4.
Fire Brigade Size 5.
Penetration Seals 6.
Fire Doors 7.
Metal Roof Deck 8.
Stairwell Enclosure Coranents Closed-pending formal submittal Open-need information an inadvertent operation of sprinkler system.
Closed pending formal response to guestion 280.1 Closed pending formal response to guestion 280.1 Closed pending formal submittal Open-need formal submittal of information discussed at meeting.
Closed-clarified at meeting Open-need drawing of a typical stairwell.
9.
Safe Shutdown ASB review area, see concerns listed in Enclosure 2.
- 10. Alternate Shutdown ASB review area, see concerns listed in Enclosure 2.
ll. Cable Tray Protection Closed pending formal submittal.
Items 12.
Power Supplies for Ventilation 13.
Fire Detection ENCLOSURE 2
(CONTINUED Conments Closed pending formal response to guestion 280. 1 Closed pending revision and formal response to guestion 280.1 Closed pending FSAR Amendment 15.
Fire Pump Separation 16.
Seperation of Safety Related Components in Containment 17.
Control Room Complex
.18.
Suppression in Control Room Ceiling 19.
Detection in Control Room Cabinets 20.
Cable Spreading Room 21.
Remote Safety Related Panels Closed-Clarified at meeting Open pending detailed staff reyjew Open pending detailed staff review of. exemption request.
Closed pending formal response to guestion 280.1 Open-(1) staff will check on Water-
=- ford - 3 design.
(2)
Applicant will provide details of cabinets.
Closed-clarified at meeting.
ASB review area see concerns listed in Enclosure 2.
ENCLOSURE 3 Concerns 1.
Define Fire Areas 2.
Capability to be in cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
3.
Instrumentation Description 4.
High/Low Pressure Interfaces "can a fire course the MOVs to Open?"
5.
Can a fire destroy all pressurizer heats 6.
Auxiliary Control Panel (ACP) switches Comments Key in FSAR Will be addressed in formal submittal Listed in FSAR Addressed in draft submittal which will be formally submitted.
Exemption request being reviewed by the staff.
One switch at ACP and one at the control room.
Under staff review.