ML18017B446

From kanterella
Jump to navigation Jump to search
Application for Amend of CPPR-158,CPPR-159,CPPR-160 & CPPR-161 Adding co-owner.Class II Amend Fee Encl
ML18017B446
Person / Time
Site: Harris, Brunswick  Duke energy icon.png
Issue date: 09/03/1981
From: Jackie Jones
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18017B447 List:
References
NUDOCS 8109090145
Download: ML18017B446 (7)


Text

REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIOS) t ACCESSIONS NSRg 8 1 09090 45 OOC. DATE!c 81/09/03 NOTARIZED:- YES DOCKEiT' 1

FACICC50'00 She'ar on Har ris Nucl ear Power Pl antr Uni t'E Carol jna 500401 Shear on Herr is Nucl cari Power Plant'r Unit 2'E Carolina 050. 01 50.-402 Shear on Harris Nuclear Powe'r Plantr. Unit 3r Cbr olive 05000402 50~403,. Shearon Harris Nuclear>> Power Plantr, Unit'r Carolina 05000403 AUTH',NAMEI AUTHOR' FF I L'IA T I ON JONES'rJ ~ AD Car ol ina Power t L Light" Co; RECIPs NAME( RECIPIENT AFFIL!IATION DENTONeH'st . Of f j cel of Nuc1 ear Reactor" R'egal ati onr Dir ec tort IP SUSJEC>>Tt: Forwards appl ication>> fori amend of CPPR 158r CPPR 159r CPPR 160.

8 CPPR~16frr espective'ly adding, co owner;Class II'mehdi fee ehcl ~

DISTRIBUTION CODEi: 8005S COPIES RECEIVED:L>>TR ~" ENCL'~ STZE TITLE!: Ln cense'pplication 'AMDTS (General I'nfo)

NOTES:

REC IPI ENT', COPIES RECIPIENT 05'COPIE8 ID'ODE/NAME] LTiTR ENCLr ID'OOK'/NAMEi, L'VTRi ENCL~

ACT'ION ~: L>>IC> BR'3>> BC'4, f>> f L>>IC liTRA'iM ~ 1 1 INTERNAL" DIR'r DI V OF LIC 1 1 HYD/GEO~.BR 2 2',

ILK~ 07 2. 2 L>>IC QUAL'R 1 ~

1 11 1 1 QA BR 1 f>>

EG. FI ~

.01 1 ~

1 ~

09'UTBERGiJ 1 1.

f 12'Ti S i ROGRAM. 1 1 FIN BR 08 EXTERNAL~e ACRS 10;, 3 LPDR 03 1 NRC) PDR< 0 1 >>BASIC" 06' NT'i S 1

- 4'EPg(

>881)

TOTAL NUMBER OF COPIES REQULRKD!'TTR 21 ENCL'1 ~

c fK EK C r'K .-c,

\ c Cr rr' ct Eg ~ t ti C I ~

C ll ~ E P nc n

n I f P.I>> u ~ Cl P

r>'l'

~

"'p' 'F 'p.l 1 chl q r" rn l f C f p," '1>> ~ V') 'PI<<CP cc f IC ~ C fr r ' << Iri 'C C ~

'> c p C, I> tK t r W ' E W ~P >',K I fc piK C 'EE pf1T'1

'1r>>>

>f C i>i I P Cc, cy p n gi c I

]f I' W C~

W p l

r'gp C f

I c

C'> "

I CIGAR, Carolina Power & Light Company September 3, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT ~ UNIT NOS 1~ 2~ 3 ~ AND 4 DOCKET NOS. 50-400> 50-401, 50-402> AND 50-403

~ ~ ~ *-" "RE/VEST FOR CONSTRUCTXON PERMIT AMENDMENT ADDITION'OF CO-'OWNER'ear Mr. Denton:

In accordance with the Code of Federal Regulations, Title 10, Section 50.90 and Section 2.101, Carolina Power & Light Company (CP&L) hereby requests revisions to the Shearon Harris Nuclear Power Plant (SHNPP)

Units 1, 2, 3, and 4 Construction Permits CPPR-158, CPPR-159 CPPR-160, and CPPR-161. Attached please find CP&L's application to amend the SHNPP Construction Permits to reflect the inclusion of North Carolina Municipal Power Agency Number 3 (Power Agency) as a co-owner of the facilities. In accordance with 10 CFR t'ttt 50.33 and 50.33a, this application contains the applicable information necessary to determine financial qualification and to conduct the appropriate antitrust reviews. Also attached please find a suggested replacement Paragraph 1.B to amend the SHNPP Construction Permits to reflect Power Agency as a co-owner of the facilities.

In addition, Power Agency is becoming a co-owner of CP&L's Brunswick Steam Electric Plant Unit Nos. 1 and 2, Docket Nos. 50-325 and 50-324. An application to amend the Brunswick Operating Licenses is being filed concur-rently with this application (Serial No.: NO-81-1413). Additionally, due to their volume, Exhibits A through H which are referenced in the attached appli-cation are being submitted under separate cover (Serial No.: N0-81-1414).

We have determined that the requested change to the SHNPP Construction Permits constitutes one Class XX amendment and- three Class I amendments in accordance with 10 CFR tt 170-22. Accordingly, our check for

$ 2,400.00 is enclosed.

8i09090i45 8i0903 p~ />'

05000400 PDR ADOCK (A PDg- ~y>~t 411 Fayetteville Street o P. O. Box 1551 ~ Raleigh, N. C. 27602

0

\

1 t

).

I e J

S v

Ir

The agreements which CPGL and Power Agency have executed relating to the sale of generating capacity are conditioned upon necessary regulatory reviews and approvals. It is requested, therefore, that review of this application"be expedited.

Please contact our staff should you have any questions regarding this matter.

s very truly, J. A. Jo s Vice Chairman ONH/lr (3167)

Attachments cc: Mr. D. G. Eisenhut (letter only)

Mr. F. J. Miraglia, Jr. (letter only)

Mr. E. A. Licitra (letter only)

Sworn to and subscribed before me this 3rd day of September-, 1981.

II I(Ill Notary Public My commission expires: Ocr. 4 1981

~~OTARy

~OgtiC:

8

~e

~ ~II

.Qodgg'li ~g

'~i(9>>Sil<~'

,'i j 1

'l IC

(

r P

l

ATTAVKENT SHNPP CP AMENDMENT The following is a suggested replacement paragraph to amend the SHNPP Construction Permits CPPR-158, CPPR-159, CPPR-160, and CPPR-161 to reflect North Carolina Municipal Power Agency Number 3 as a co-owner of the facilities:

1.B. Carolina Power & Light Company and North Carolina Municipal 1

Power Agency Number 3 (the applicant) have described the proposed design of the Shearon Harris Nuclear Power Plant, Unit No. 1 2 (the facility), including, but not limited to, the principal architectural and engineering criteria for the design and have identified the major features or components incorporated therein for the protection of the health and safety of the public; 1l"Applicant" I

as used through the rest of this Construction Permit shall mean both Carolina Power & Light Company and North Carolina Municipal Power Agency Number 3.

2 Unit No. 2, 3, or 4 as appropriate.