APPENOIX A NOTICE OF VIOLATION.
Carolina Power and. Light Company Shearon Harris 1, Z', 3', and 4.
Oocket-Nos. 50-400,
- 401, 402,.
5,. 403 License: Nos CPPR--158,
- 159, 169
- 5. 161 As
- a. result: of'he inspection. conducted: on February 20, March-20,
- 1981, and in accordance: with. the Interim Enforcement Policy, 45; FR 66754 (October T,
1980),
the following violations were identified.
(Item A applies to unit 1 only and Item B applies to units 1, Z, 3 and 4).
A.
10 CFR.50, Appendix B, C'riterion X as implemented by PSAR section 1.8.5. 10; CP5L' Corporate QA Program Part I.', section 8.3,.4-and: construction procedure QCI-19. 1,.
section
- 5. 1 and.
- 5. 1'. 1, requires site:
QA welding inspection personnel to conduct inspections at designated QA inspection hold points.
Contrary to the: above, QA inspection hold points numbered one through five on the weld data. report for containment-penetration weld. C1-265-M-108-AFPP were not witnessed or inspected by the site. welding QA inspection personnel.
On Februar'y 25; 1981 steps one-through five on the weld data. report. for.
containment penetration weld M-108-AFPP were found, to-have. been completed without. being. inspectecL'y the site designated welding QA inspection group.
This is; a;Severity, Level V Vi'ol:atiorr (Supplement II:.E.).
This'Violation-applies to" Oocket 50-400 only.
B.
10 CFR 50, Appendix B,. criterion, V, as; implemented.
by PSAR section 1..8. 5.5 and: CP5L's C'orporate-QA Program Part I; section 6.2; I.f requires procedures to contain. sufficient. detail to: assure that activities important. to safety have: been satisfactorily accomplished.
Contrary to the
- above, construction procedure TP-40 revision 0 does not contain sufficient detail to determine the necessary education-or experience required'or-mechanical or electrical inspection personnel.
As, of February.- Z7,, 1981 Construction I'nspectors with very limited. previous. related.
education or.- experience.
are: certified:
as. unlimited mechanical and. or.
electrical'nspectors and.the Construction I'nspection. Supervisor responsible for the training, supervision and. qualification of mechanical and electrical irrspectors'oes.
not. have sufficient education or background; experience in-either mecharrical or electrical fields-.
This is-a, Severity-Leve'1' Viol'ation (Supplement. I'I:.E.).
This. Viol'ation applies. to: Oockets. 50-400, 401, 402, and. 403 '~
rsuant. to. the: provisions of 10 CFR'".201, you are hereby required to submit; to is office within twenty-five days of. the date of this Notice',
a written state-
Carolina. Power, and. Light Company-
-2.
Docket: Nos., 50-400, 50-401 50-402,. and 50-403 License Nos.. CPPR-158, 159 160 and. 161 Notice, of. Violation
~
~
~
~
~
~
ment or-explanation. in reply,. including:,
(1) admission.
or. denial of the alleged:
violations;-.
(2) the reasons; for the violations, if admitted (3) the corrective steps, which~ have:.been-taken-and, the. resul.ts, achieved;.
(4) corrective steps. which wi.=l.l: be taken-. to; avoid; further. violations',, and (5); the; date when.ful,l compliance will. be achieved:
Under the. authority of-'Section 182!-of the Atomic Energy-Act:
oF 1954, as, amended;. this'esponse. shall be~ submitted. under oath or affirmation; Date. APR 0 3 7987