ML18017B210
ML18017B210 | |
Person / Time | |
---|---|
Site: | Perry, Harris |
Issue date: | 08/15/1980 |
From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
To: | Varga S Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8008260402 | |
Download: ML18017B210 (4) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18017A9241999-10-15015 October 1999
[Table view]Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML18017A9241999-10-15015 October 1999
[Table view]Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 1999-09-09 Category:UTILITY TO NRC MONTHYEARPY-CEI-NRR-1226, Forwards LERs 90-018-00 & 90-019-00 for Plant1990-09-14014 September 1990
[Table view]Forwards LERs 90-018-00 & 90-019-00 for Plant ML20059L0911990-09-12012 September 1990 Confirms That Fee Electronically Transferred to Dept of Treasury for Payment of NRC Review Fees ML18009A6581990-09-11011 September 1990 Submits Addl Info Re Use of Hafnium Control Rods at Facility.All Rods Will Be Removed During Spring 1991 Outage PY-CEI-NRR-1218, Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis1990-09-10010 September 1990 Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis ML20059H4181990-09-0606 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-400/90-13.Corrective Action:Changes to EST-717 in Area of Power Normalization Under Study for Past Several Months ML20059E8741990-09-0505 September 1990 Forwards Fourteenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-June 1990. Five Microevents Originating within Network & Three Other Events Originating Outside of Network Recorded ML17348B4941990-08-30030 August 1990 Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-duty ML20059D3511990-08-30030 August 1990 Forwards Decommissioning Financial Assurance Certification Rept Submitted by North Carolina Eastern Municipal Power Agency PY-CEI-NRR-1216, Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept1990-08-29029 August 1990 Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept PY-CEI-NRR-1201, Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements1990-08-28028 August 1990 Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements PY-CEI-NRR-1211, Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-00861990-08-23023 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-0086 PY-CEI-NRR-1210, Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant1990-08-17017 August 1990 Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant PY-CEI-NRR-1208, Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl1990-08-10010 August 1990 Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl ML18009A6261990-08-10010 August 1990 Informs That Action Committed to in Response to Generic Ltr 88-14, Instrument Air Supply Sys, Completed ML18009A6241990-08-0303 August 1990 Forwards Addl Info Re Operator Action Times Assumed in Steam Generator Tube Rupture Analyses for Plant,Per 900712 Telcon ML18009A6081990-07-31031 July 1990 Forwards Plan for Shearon Harris Nuclear Power Plant Emergency Exercise - 900919, Per NRC Request.W/O Encl ML20055J4171990-07-30030 July 1990 Forwards Rev 5 to Security Plan.Rev Withheld (Ref 10CFR73.21) PY-CEI-NRR-1203, Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved1990-07-27027 July 1990 Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved PY-CEI-NRR-1200, Forwards Decommissioning Repts on Financial Assurance for Plant1990-07-25025 July 1990 Forwards Decommissioning Repts on Financial Assurance for Plant PY-CEI-NRR-1196, Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan1990-07-24024 July 1990 Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan PY-CEI-NRR-1205, Forwards LERs 90-014-00 & 90-015-00 for Plant1990-07-20020 July 1990 Forwards LERs 90-014-00 & 90-015-00 for Plant ML20055F9431990-07-12012 July 1990 Advises That Stated Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900711 for Payment of Operator License Exam Fees for Listed Insp Invoices ML18009A5991990-07-0606 July 1990 Comments on Electrical Distribution Sys Functional Insp Rept 50-400/90-200 on 900212-0316.Seismic Qualification Package Subsequently Upgraded to Include Qualification Info Based on Receipt of Part 21 from Transamerica Delaval PY-CEI-NRR-1193, Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues1990-06-29029 June 1990 Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues ML18009A5851990-06-28028 June 1990 Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl ML20043H7371990-06-19019 June 1990 Forwards Individual Plant Exam Project Milestones.Milestones Subj to Change from Project or External Causes & Will Not Be Docketed Again Unless Significant Impact on Final Rept Contents or Submittal Date Exists ML20043H1711990-06-14014 June 1990 Discusses Util Radiological Safety Board of Ohio 900614 Comments on Notice of Opportunity for Hearing Re Rev to Previously Submitted License Amend Application.Licensees Would Welcome Opportunity to Consult W/State of Oh ML20043E5771990-06-0808 June 1990 Provides Info Re Implementation of Administrative Controls & Training Related to Use of Tech Spec 3.0.4.Util Intends to Implement Amend 30 Changes by 900618.All Licensed Operators Would Receive Training to Generic Ltr 87-09 ML18009A5621990-05-30030 May 1990 Responds to NRC 900504 Ltr Re Violations Noted in Insp Rept 50-400/90-06.Corrective Actions:Procedures OST-1008 & OST-1108 Revised to Delete Stroke Testing of Valve 1ST-359 on Quarterly Basis ML20043B6981990-05-21021 May 1990 Forwards Info Re Activation Energy Values Utilized for Brand-Rex Co Cable at Facility.Encl Includes Rept, Qualification Tests of Electric Cables for Class 1E Svc in Nuclear Power Plants. ML20043A7041990-05-18018 May 1990 Forwards LERs 90-007-00 & 90-008-00 ML20043A4771990-05-16016 May 1990 Provides Justification Re Events Leading to Declaration of Alert on 900403 Due to Loss of Emergency Svc Water When Manway Flange Gasket Leak Developed at Pump a Discharge Strainer,In Response to Ocre 900406 Petition ML20042F4931990-05-0404 May 1990 Forwards Response to Generic Ltr 89-19 Re Reactor Vessel Overfill Protection ML18009A5141990-05-0303 May 1990 Forwards Eddy Current Exam CP&L Shearon Harris Nuclear Power Plant Steam Generators A,B & C, Providing Results of Inservice Insps Performed During Plant Second Refueling Outage in Oct 1989 ML20042F1961990-04-27027 April 1990 Informs of Adoption of Reorganization Plan Re Plants on 900424.Reorganization Will Make No Changes in Technical or Financial Qualifications for Plants.Application for Amends to Licenses Adding Company as Licensee Will Be Submitted ML18009A4941990-04-26026 April 1990 Forwards Radiological Environ Operating Rept,1989, Radiological Environ Operating Rept,Vol II,Jan-June 1989, Sample Analyses Data & Radiological Environ Operating Rept,Vol III,Jul-Dec 1989,Sample Analyses Data. ML18009A5031990-04-25025 April 1990 Submits Suppl 2 to Relief Request R2-001 Re Plant 10-yr Inservice Insp Plan,Per 880129 Request ML18009A4911990-04-24024 April 1990 Forwards Addl Info Re Proposed Wakesouth Regional Airport to Be Located Near Facility,Per 900411 Request.Info Previously Provided to NRC During 900320 & 23 Telcons ML18009A4841990-04-24024 April 1990 Forwards Corrected Bases marked-up Page to 900226 Tech Spec Change Request Re Surveillance Intervals ML20042F8051990-04-19019 April 1990 Forwards 1989 Financial Repts for Centerior Energy Corp, Cleveland Electric Illuminating Co & Toledo Edison Co & Supplemental Sec Form 10-K ML20012F3521990-04-0202 April 1990 Suppls Response to NRC 891215 Ltr Re Deviations Noted in Insp Rept 50-440/89-26.Corrective Actions:Profile of Heat Generation from Stored Fuel Vs Time for First Four Fuel Load Discharges Calculated & Design Changes Implemented ML20012E7811990-03-30030 March 1990 Confirms Basis for 890417 Submittal Re Station Blackout ML18009A4251990-03-30030 March 1990 Submits Supplemental Response to Station Blackout Rule Based on Guidelines Provided in NUMARC 87-00, Guidelines & Technical Bases for NUMARC Initiatives.... No Changes to Previous Calculations Necessary & One Deviation Noted ML18009A4231990-03-29029 March 1990 Suppls Response to NRC 900216 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Actions:Surveys Performed to Determined Extent & Level of Contamination & Personnel Involved Decontaminated ML20012E9431990-03-26026 March 1990 Forwards Correction Pages to Semiannual Radioactive Effluent Release Rept 1989:Quarters 3 & 4. Changes Affect Liquid Effluent Data Only.Corrections Made Due to High Contribution of Sr-89 to Liquid Effluent Dose ML18009A4121990-03-23023 March 1990 Forwards Rev 17 to PLP-201, Emergency Plan & Fission Product Barrier Analysis.Rev to Emergency Plan Incorporates Comments Received During Recent Licensed Operator Requalification Training in Emergency Plan Procedures ML18009A4111990-03-23023 March 1990 Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-400/90-02.Corrective Actions:Personnel Involved W/ Quadrant Power Tilt Ratio Calculations & Operability Determination Counseled ML18009A4151990-03-22022 March 1990 Responds to NRC SALP Rept for Jul 1988 - Nov 1989.Contrary to Statement in Rept Significant Amount of Refresher Training Was Conducted During SALP Assessment Period Including Termination & Splicing & Motor & Bus Relays ML18009A4081990-03-19019 March 1990 Responds to NRC 900226 Ltr Re Violations Noted in Insp Rept 50-400/90-01.Corrective Actions:All Calibr Required by Tech Specs for Power Range Nuclear Instrumentation Satisfactorily Completed ML20012B9851990-03-0909 March 1990 Responds to Generic Ltr 90-01 Re Regulatory Impact Survey 1990-09-06 |
Text
REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)
ACCESS/ON NBR:8008260402 DOC;DATE: 80/08/15 NOTARIZED; NO DOCKET FACIL:50"400 Shearon Harris Nu'clear Power Planti Planti Unjt li Carol Unit 2P Carol ina ina 06000400 50 401 Shearon Harris Nuclear Power 05000401 50-.402 Shearon Harrjs Nuclear Power Plant< Unit 3i Carol jna 05000402 50 403 She'aron Harris Nuclear Power Planti Unit 4i Carol ina 05000403 AUTH, NAME AUTHOR AFFILIATION MCDUFFIKiM~ A", Cat ol ina Power 8 Light Co ~
RECIP ~ NAME, RECIPIENT AFFILIATION VARGAES,AD Operating Reactors Branch 1 SUBJECT; Submits info re use, of masonry walls in Category structures at fa'cility in response to NRC, 800421 requ est,No Category I masonry walls have been used,No safety rel ated equipment is permitted to be support from walls, DISTRIBUTION CODE: BOOIS COPIES RECEIYED:LTR + ENCl,' SIZE TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME'OUNGBLOODpB LTTR ENCL ACTION! A/D LICENSNG 1 RUSHBROOKPM ~ 1 WILSON p JERRY 04 INTERNALi ACCID KVALi BR26 AUX SYS BR 07 CHEM ENG BR 08 CONT SYS BR 09 CORE'ERF BR 10 DIRg SFTY TECH11 EFF TR SYS BR12 EMERG PREP 22 EQUIP QUAL~ BR13 GKOSCIKNCES 14 HYD/GEO BR 15 IaC SYS BR ISE 06 MATL ENG BR 17 MECH ENG BR 18 MPA NRC PDR 02 OELD POWER SYS BR 19 PROC/TST RFV 20 QA BR 21 SS BR22 REAC SYS BR 23 FI K 01 SIT ANAL BR 24 STRUC KNG BR25 EXTERNAL; ACRS 27 16 1 LPDR 03 NSIC 05 1
, TOTAL NUMBER OF COPIES REQUIRED; LTTR 50 ENCL
We 0
1 f
II 0
I(
I C, fl A Al l1 I
1 4
CSQE, Carolina Power & Light Company August 15, 1980 Steven A. Varga, Acting Assistant 3)irector for Light Water Reactors Division of Project Management United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3, & 4 DOCKET NOS. 50-400, 50-401, 50-402, 50-403 CATEGORY I MASONRY WALLS
Dear Mr. Varga:
As requested in youx letter of April 21, 1980, Carolina Power &
Light Company (CP&L) has reviewed the use of masonry walls in Category I structures at the Shearon Harris Nuclear Power Plant (SHNPP) . As a result of that review, CP&L provides the following information:
- 1. Masonry walls are used in Seismic Category I structures at the SHNPP; however, no Category I masonry walls have been used and no I
safety-related or Seismic Category equipment or components are permitted to be supported from these walls. The masonry walls in these structures are used for st:airway enclosures, elevator enclosures, shielding and knockout panels.
- 2. The design of the walls is based on dead load conditions.
- 3. CP&L is evaluating the'se walls against the criteria for damage of safety-related components by nonsafety items (Regulatory Guide 1.29).
CP&L believes that the above information should satisfy your concerns related to masonry walls at the SHNPP. CP&L'ill inform you with respect to Regulatory Guide 1.29 reveals any exceptions to the'stablished if the'valuation criteria. If you have any questions on this subject, please contact our staff.
+~h~ Yours very M. A. McDuffie truly, Senior Vice President pool 5
l/o Engineering & Construction MAM/dk 411 Fayetteville Street o P. 0. Box 1551 ~ Raleigh, N. C. 27602
<<eaaae q~g