ML18017B051
| ML18017B051 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/04/1980 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML18017B046 | List: |
| References | |
| 50-400-80-06, 50-400-80-6, 50-401-80-06, 50-401-80-6, 50-402-80-06, 50-403-80-06, NUDOCS 8005020355 | |
| Download: ML18017B051 (1) | |
Text
soososos 5>
APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris license Nos.
CPPR-158 CPPR-159, CPPR-160 Sr CPPR-161 Based on the NRC inspection February 19-22, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in correspondence to you dated December 31, 1974.
I As required by Criterion V of Appendix B to 10 CFR 50, implemented by Carolina Power and Light PSAR Section 1.8.5.5, "Activities affecting quality shall be prescribed by documented instructions, procedures or drawings,...and shall be accomplished in accordance with these instructions, procedures or drawings."
Paragraph 4.1.2.3
" of CPSL procedure TP-08 states "To verify curve selection for moisture and percent compaction, the one-point proctor shall be completed for each density test."
Contrary to the above, one point proctor tests were not completed for den-sity test numbers ESW-33, ESW-65, ESW-66, ESW-96, ESW-98, ESW-103, ESW-104, ESW-110, ESW-110R, ESW-124, and ESW-125.
These'density tests were performed on fillin the emergency service water canal.
This is an infraction.
/Cw