UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 dAN P. S
>SSO In Reply Refer To:
RII:JJL 50-400/80-01 50-401/80"01 50"402/80-01 50"403/80-01 Carolina Power and Iight Company ATTN:
Mr. J.
A. Jones Senior Executive Vice President and Chief Operating Officer 411 Fayetteville Street
- Raleigh, NC 27602 Gentlemen:
This refers to the inspection conducted by J. J.
Lenahan of this office on January 2-4, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-158, CPPR-159, CPPR-160 and CPPR-161 for the Shearon Harris facility, and to the discussion of our findings held with T. H. Wyllie at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these
- areas, the inspection consisted of selective examinations of procedures and representative
- records, interviews with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements.
This item and references to pertinent requirements are listed in the Notice of Violation enclosed here-with as Appendix A.'his notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you.to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken'to avoid further noncom-pliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
8003 yg pgg~
Carolina Power and Iight Company JAN 2r. 1960
+ pa
~
a Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, J;
C.
ryant, Acting Chief Reactor Construction and Engineering Support Branch
Enclosures:
l.
Appendix A, Notice of Violation 2.
Inspection Report Nos. 50-400/80-01, 50-401/80-01, 50-402/80-01 and 50-403/80-01 cc w/encl:
R. Parsons, Site Manager P. 0. Box 101 New Hill, N C