Summary of 790918 Meeting W/Util Re Environ Qualification of safety-related Electrical Equipment in FSAR
ML18017A664
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/27/1979
From: Parr O
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
790907, NUDOCS 7910190044
Download: ML18017A664 (9)


Text

SF.P 27 19'ocket Nos. 50-400/401/402/403 APPLICANT:

Carolina Power and Light Company'ACILITY:

Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4

SUBJECT:

'UMMARY OF MEETING HELD ON SEPTEMBER 18, 1979, TO DISCUSS ENVIRONMENTAL QUALIFICATION OF -SAFETY-RELATED CLASS IE ELECTRICAL EQUIPMENT A meeting was held on September 18, 1979, between Carolina

Power, and Light Company (CPEL) and the staff, at the applicant's-req'uest, to discuss environ-mental qualification of safety-related Class IE electrical equipment.

An attendees list is enclosed.

The applicant stated that they plan to tender their application for an operating license for Shearon Harris in June 1980.

They requested an oppor-tunity to discuss.with the-staff the CP&L proposed plan for documentation for environmental qualification of safety-related electrical equipment in their Final Safety Analysis Report (FSAR).

A letter from CP8L dated September 17, 1979, was discussed.

In that letter the applicant stated that the description in their FSAR will list individual pieces of equipment, their location, the seismic and environmental envelope that it is or will be qualified to, the qualification method and the qualification results.

CPSL pointed out, that at the time of the filing of the FSAR, not all of the test data for all of the equipment will be avail-able.

The testing program is ongoing and is anticipated to be completed in late 1981 and early 1982, All required test data will be available and on file prior to receiving the Operating License for the facility. It is not

. CPSL's intention to provide all of the test data in the FSAR, but rather to specify the qualification envelope, method of qualification and qualifica-tion results and to provide only representative test data for NRC staff review.

All other test data for individual pieces of equipment will e

located in CPSL's files and available for audit.

We indicated that the proposed program seemed'reasonable.

CP8L wa ualify-encouraged to consi.der use of IEEE Std. 323-1974 where possible sn ing equipment.

For Shearon Harris both the

'71 and

'74 versions are being gexoo~<:~ R-'

MEETING

SUMMARY

DISTRIBUTION Docket File NRC PDR Local PDR TIC NRR Reading LWR ¹3 File H. Denton E.

Case H. Berkow D.

Ross D. Vassallo D. Skovholt J. Stolz R. Baer

0. Parr L. Rubenstein S.

Varga C. Heltemes W. Haass R. Houston L. Crocker B. Kirschner F. Williams R. Mattson R.

DeYoung Project Manager

Attorney, ELD M; Rushbrook IE (3)

ACRS,(1,6)

R.

Denise BCC'..Applicant f

J

~

S. Niner

& Service List J. Knight S.

Hana'uer R. Tedesco R.

Bosnak S. Pawlicki F. Schauer K. Kniel T. Novak Z. Roxztoczy W. Butler V. Benaroya R. Satterfield V. Moore W. Kreger M. Ernst F.

Rosa R. Denise EP Branch Chief G.

Chipman J. Collins T. Murphy G. Lear B. Youngblood R. Jackson L. Hulman TERA l~l A. Ungaro, DSS -.

J. Zwolinski, DSS A. Szukiewicz, DSS R. Satterfield, DSS T. Dunning, DSS V. Moore, DSS Region II R. Bradley

~\\

~

'e

~ -)

ertLE t,opt DH.+

7910190

~ ~

I ~

~ k 4

~ P I

S II V

'VIk

-l ~-

J I

4 4

~ 4

, ~

~

4 V

I

~ f I

I,

~

7 MLV 'I

~

4 V

I lr r 4 VVV) ',

IL 4

4 11 rL

'I I

I

~

~

I I, V, f w

r

~

4 I ~

4 'f,v 44

~V'I

~ ~ '

~4 P" 4

~ 44 V I

0

.ef 2'.f 2

pP SEP 2'7 19'

'tilized.

CPSL was provided a draft copy of NUREG-0588, "Interim Staff Position on Environmental qualification of Safety-Related Electrical Equipment".'t was agreed that CP8L should not wait until their FSAR is submitted to, again meet with the staff.

As soon's -they have a reasonable package put

,- together.,

a meeting should be arranged with the staff to discuss that

,portion of their program.

p'r')gin@1 Sigaod 5p, Dian P2II,"~I

~

~

~

~

~

Ol an D. Parr, Chief-Light Water Reactors, Sranch No.

3 Division of Project Management cc:

See Next Page ort tea~

, NUII HAMS ~

OATCW

+)QIR g3

'St1> nergec 9/ lq /79 DPM:) WR h3...

ODVarr 9!.Wq'..!?9.

~

2 AKMPl!

~

y ~

~ ~ ~ 0 0 ~

~

~ ~

0 ~ ~ ~ ~ ~ ~ ~ ~

ÃTtl FAPRRft

'%f A FI3 'le% 22Ptt~ Atfth 6 U ~, OOVOONMOIITHIIIITIIIOOTPICOI I ~t ~ tt~ tt ~

PPP A

'P P ~

API ~ P l

,/P P'

~ uP <<>%+lWWQ w

S "'P

> CPSL MEETING SEPTEMBER 18, 1979 ATTENDEES LIST CPSL P. W. Howe T. W. Johnson NRC

0. Parr -

DPM/LWR 83 A. Ungaro - DSS/PSB J. Zwolinski - DSS/CSB A. Szukiewicz - DSS/ICSB R. Satterfield - DSS/ICSB T. Dunning - DSS/ICSB V. Moore - DSS