Notifies of Review of M Mcduffie 790802 Submittal Re Emergency Svc Water Intake Channel.Procedures to Remove All Existing Fill Along Intake Channel Alignment & Replace Fill Per Tech Specs Is Acceptable
ML18017A645
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/18/1979
From: Rolonda Jackson
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7910030599
Download: ML18017A645 (3)


Text

gy,R RE00 (4

0 Cy

  • 0 cA Op lg+

~O

+a*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PEP

> 8 579 MEMORANDUM FOR:

Olan D. Parr, Chief Light Water Reactors Branch No. 3, DPM FROM:

SUBJECT:

Robert E. Jackson, Chief Geosciences

Branch, DSS EVALUATION OF EMERGENCY SERVICE WATER INTAKE CHANNEL PLANT NAME:

Shearon Harris, Units 1-4 LICENSING STAGE'ost CP DOCKET NUMBERS'0-400/403 MILESlONE NUMBER:

R-18 RESPONSIBLE BRANCH:

LWR-3; S. Miner, LPM REVIEW S ATUS:

Awaiting Information from Applicant Regarding Criteria for Support of Category I Pipes and Conduits In accordance with a Transfer of Lead Responsibility from IE to NRR for certain earthwork items (memo to D. Vassallo, hRR, from G. Reinmuth, IE, dated April 27, 1979) we have reviewed a submittal from M. McDuffie, CPIIL, to J.

O,'Pei lly, IE Region II, dated August 2, 1979, regarding the emergencv service water intake channel.

The applicant has decided to remove all existing fill along. the intake channel alignment and to replace fill in accordance with revised specifications as outlined in a letter from M. McDuffie, CPEL to H. Denton, NRR, dated September 6,

1979.

We find that these procedures are acceptable.

We have not yet been provided with the design bases or stability analyses of the channel

slopes, but understand that the applicant's engineers have designed the slopes.

It is our judgement that the channel details appear to be reasonable.

We recommend that continuation of the intake channel construction be permitted without cur having reviewed the design details, provided that the applicant submits these details in the FSAR and provided that the applicant agrees to correct any deficiencies which may be found during the FSAR review by NRR.

V0100ao 5

'P 9'

Olan D. Parr $ EP i 8 579 The remaining unresolved issue with respect to the transfer of lead responsibility is the criteria for fill and backfill supporting category I pipes and conduits other than those covered in my memo to you dated August 8, 1979 (Station N 230 to N 1300).

In my memo to you dated May 8, 1979 we requested additional information regarding category I pipes and conduits.

The applicant has not yet fully responded.

We request that the applicant be required to submit the necessary information in a timely. manner so as to allow us to complete our review within a reasonable review schedule.

cc:

F. Schroeder J. Knight S.

Varga C. Murphy T. Conlon R. Bradley J.

Lenahan J. Harris R. Jackson L. Heller S. Miner A. Cardone

0. Thompson F. Williams PDR Local PDR Robert E. Jacks

, Chief Geosciences Branch Division of ys ems Safety

4

~ II Cit