o l)ENORANDUH FOR:
L. M. Heller, Acting Chief Geosciences
- Branch, DSE s
I s
FROt):
SUBJECT:
- 0. 0. Thompson, Geotechnical Engineer Geotechnical Engineering Section Geosciences
- Branch, DSE TRIP REPORT PLANT NAttE:
Shearon Harris, Units 1-4 LICENSING STAGE:
Post, CP DOCKET NUMBERS:
50-400/403 MILESTONE NUtSER:
R-18, 29-61
'TAC NUNBER:
4953 RESPONSIBLE BRANCH:
Ll<R-3; S. Niner, LPH REVIEll STATUS:
Applicant Awaiting Approval to Commence Embankment Construction On January 29,- 1979 I visited the Shearon Harris site with A. T.
Cardone, Geologist, Geosciences Branch.
Ne met with the follow-ing personnel:
Bob. Black CPKL Steve Floyd
'PKL I
= Pete Long CPKL Siting Doug Bensinger CPM sLicensing Ashleigh Lucas CPSL:Resident Engineer tlilliam Pridgen CPKL Engineer James Nevill CP8L Senior. Engineer Ismai 1 Ciloglu Ebasco Pr incipal Geologist Ed Hedgecock Ebasco Senior Geotechncial Engineer Dan Johnson
. 'basco
.Principal Engineering Geologist Sarah Hilkinson Ebasco Geologist fiike Pavone Ebasco Engineer s
The purpose of our site visit vlas to inspect Test Fills pun 24 4 1
%-l'-g.O-'f and 7VR-24-4-2 which were constructed and tested in December 1978 and January 1979.
.During the site visit I saw a stockpile of-approximately 20,000 cubic yd. of triassic rock from the cooling tower excavation.
The rock appeared to be severely weathered at the surface of the stockpile. 'o attempt was made to L'deter'mine>
.the depth of penetration of the recent weathering into the stock-OUNMAMISW
~ ~ ~
0
~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~I ~
KRC PORht 318 (9.76) NRCM 0240
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
I 0'
~ v ~
~
~
~
~ ~ ~
- Vro 44VCNNIahhv thihvlh4 OPNICNI le'
~
se ~
sse
~
~
C l
4
'g V I
i
L. ll. Heller FEB 14 I)79 I informed the applicant that the staff needed complete details of the recent test fill program, the dehails of the 1975 test fill and laboratory testing program, a comparison and evaluation of these two programs, and construction specifications-%=dam and dike construction.
This information has been received by'RC.
I discussed with the applicant our needs regarding inspection of the foundations for the Auxiliary Dam and Dike.
In particular, I indicated we needed details of the procedures to be adopted for approva'I of foundation naterials, and details of the proposed testing of random rockfill materials including frequency of grada-tion and density testing.
)
J I
1 cc; R. Denise L. Heller R. Jackson A. Cardone S. t4iner
- 0. Thompson PDR Owen 0. Thompson, Geotechnical Engiooer Geotechnical Engineering Section Geosciences Branch Division of Site Safety and Environmental Analysis r
1 I
I I
DISTRIBUTION
'OCKET FILE (50-400/403)
NRR RDG GB FILE OFI1ICR3O CIIRNAMEW DATC~
DSE:ST:G OOThompson:
~ ~ ~ ~ rT
~ ~ ro ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ oooo ~ ~
9
~ ~ ~ ~ ~ ~ ~ o ~ o ~ ~ oI ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
1
~ ~ ~ ~
1 N'OSH 318 (9o76) NRCM 0240 V 0 OOVONNMONT IoNINTINO OIoIoICOI I ~ 10
@44 100
II dl tii 0
Ui41Ti:D 51 A1 FS NUCLEAR f)EGULA1QRYCOhii.:ISSION Vi'ASHINGTON,O. C. 20555 February 14, 1979 MEMORANDUM FOR:
L. W. Heller, Acting Chief Geosc1ences
- Branch, DSE FROM:
SUBJECT:
- 0. 0.
- Thompson, Geotechnical Engineer Geotechnical Engineering Section Geosciences
- Branch, DSE TRIP REPORT PLANT NAME:
Shearon Harris, Units 1-4 LICENSING STAGE:
Post CP DOCKET NUMBERS:
50-400/403 MILESTONE NUMBER:
R-18, 29-61 TAC NUMBER:
4953 RESPONSIBLE BRANCH:
LWR-3; S. Miner, LPM REVIEW STATUS:
Applicant Awaiting Approval to Commence Embankment Construction On January 29, 1979 I visited the Shearon Harris site with A. T.
- Cardone, Geologist, Geosciences Branch.
We met with the follow-ing personnel:
Bob Black Steve Floyd Pete Long Doug Bensinger Ashleigh Lucas William Pridgen James Nevill Ismail Ciloglu Ed Hedgecock Dan Johnson Sarah Wilkinson Mike Pavone CP&L CP&L CP&L Siting CP&L Licensing CP&L Resident Engineer CP&L Engineer CP&L Senior Engineer Ebasco Principal Geologist Ebasco Senior Geotechncial Engineer Ebasco Principal Engineering Geologist Ebasco Geologist Ebasco Engineer The purpose of our site visit was to inspect Test Fills 8VR-24-4-1 and <VR-24-4-2 which were constructed and tested in December 1978 and January 1979.
During the site visit I saw a stockpile of approximately 20,000 cubic yd. of triassic rock from the cooling tower excavation.
The rock appeared to be severely weathered at the surface of the stockpile.
No attempt was made to d'etermi'ne the depth of penetration of the recent'eathering into the stock-pile.
L. W. Heller I informed the applicant that the staff needed complete details of the recent test fill program, the details of the 1975 test fill and laboratory testing
- program, a comparison and eva)uatiog of these two programs, and construction specifications of dam and dike construction.
This information has been received by NRC.
I discussed with the applicant our needs regarding inspection of the foundations for the Auxiliary'am an'd Dike.
In particular, I indicated we needed details of the procedures to be adopted for approval of foundation materials, and details of the proposed testing of random rockfill materials including frequency of grada-tion and density testing.
cc:
R. Denise L. Heller R. Jackson A. Gardone S. trainer
- 0. -Thompson PDR J~
Ma~p)
Owen 0.
- Thompson, Geotechnical Engineer Geotechnical Engineering Section Geosciences Branch I'ivision of Site Safety and Environmental Analysis