SOUTHERN CALIFORNIA Al Bates EDISON~
Manager, Regulatory Affairs An EDISON INTERNATIONAL Company U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 January 11, 2018
Subject:
Docket Nos. 50-206, 50-361, 50-362, and 72-41 10 CFR 50.54(q)
Revision 3 to the Permanently Defueled Emergency Action Levels, San Onofre Nuclear Generating Station (SONGS), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Pursuant to 10 CFR 50.54(q), Southern California Edison (SCE) has revised the Permanently Defueled Emergency Action Level Technical Basis Manual and two Permanently Defueled Emergency Plan Implementing Procedures (EPIPs) for the San Onofre Nuclear Generating Station (SONGS). This letter serves as the report required by 10 CFR 50.54(q)(5).
SCE has determined that the changes do not reduce the effectiveness of the Permanently Defueled Emergency Plan (PDEP) or Permanently Defueled EPIPs, and the PDEP, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50 Appendix E (as exempted). of this letter transmits Revision 3 of the SONGS Permanently Defueled Emergency Action Level Technical Basis Manual effective December 12, 2017. provides a report and analysis summary of the Permanently Defueled Emergency Action Level Technical Bases Manual changes. of this letter provides a copy of the following revised Permanently Defueled
- Emergency Plan Implementing Procedures:
fl'pJ£
µ,v15SZ.lf piJ{(IL fJNsS
Document Control Desk Procedure S0123-VIII-ADMIN-1, EMERGENCY PREPAREDNESS PROGRAM MAINTENANCE S0123-VIII-ADMIN-4, 10CFR50.54(q) SCREENINGS AND EVALUATIONS Rev.
Effective Date 5
12/12/2017
.1 12/21/2017 provides a report and analysis summary of the Permanently Defueled EPIP changes.
There are no commitments contained in this letter or its attachments.
If you have any questions or require additional information please contact me at (949) 368-6945.
Attachments: 1. SONGS Permanently Defueled Emergency Action Levels Technical Bases Document - Revision 3
- 2. Report and Analysis Summary of Changes to Permanently Defueled Emergency Action Level Technical Bases Document
- 3. Revised Permanently Defueled Emergency Plan Implementing Procedures
- 4. Report and Analysis Summary of Permanently Defueled Emergency Plan Implementing Procedures Change cc:
Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 3)
K. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, San Onofre ISFSI