Notifies That Status Update of Deficiencies Involving Pgcc Cable Connectors Will Be Temporarily Delayed,Due to Extensive Evaluating Process.Final Rept Will Be Submitted Jul 1980
ML18017A159
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/30/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
840-4, NUDOCS 8005080347
Download: ML18017A159 (3)


Text

ACCESSION NBR:8005080307 FACI C

REC IP 0 388 RTISP N,'A, r4Ab1E GRIER,B,H.

'OCKET REGULA TOrE

-susquehanna 4squehanna AUTHOR INFORMA T IOr4 DISTRI BUT ION DOC Steam Steam CHOATE:

AFFILIATION Pennsylvania Power 8 Light Co.

REC IP IENT AFFILIATION Region li Phi ladelphiag Office of the f STEM (BIDS) 80/04/30 NOTARIZED: NO EleCtriC Station<, Unit 1P Pennsylva Electric Stationi Unit Zs Pennsylva Director 05000387 05000388

SUBJECT:

'4otifies that status update of deficiencies involving PGCC cable connectors will be temporarily delayedidue to extensive evaluating process. Final rent will be submitted Jul 1980 DISTRISUTION CODE: 80198 COPIES RECEIVED:LTR Q ENCL +

TITLE: Constr uct ion Oef iciency Report (10CFRSO ~ 55E)

SIZE:~~

r4OTES: S~OP mC <ML >~u74 RECIPIENT COP IES RECIPIENT COPIES ID CODE/NAKE LTTR EN L ID CODE/NA~E LTTR ENCL ACTION: 14 PH W//r/+g 1 15 BC l Cc/g +Q 20 LA 4.ulg 4/+ 1 21 AD 4aJ)P INTERNAL: REG FILE 1 02 NRC PDR 1 2 07 EOO lm STAFF 1 08 HPA 1 09 DEPY DIR DPM 1 10 QAB 1 11 STANDROS OEV 1 13F IELD COOR/IE 1 16 AD FOR ENGR 1 17 AO PLANT SYS 1 17 AD REAC SFTY 1 Z2 DIR DPH 1 23 OELD 1 AD/RC I/IE AD/SITE TECH 1 AEOO 1 DIRECTOR OSE 1 GEOSC IENCES BR 1 HAr4AUERzS ~ 1 IH C SYS BR 1 1 NATL ENG BR 1 MECH ENG BR 1 1 POi'rER SYS BR 1 STRUCT ENG BR 1 EXTERNAL! 03 LPDR 1 04 NSIC 24 ACRS 16 1 C.~

~ed RM 6/8 ~~me.

s. 88cu8 MPY 8 wacA g

TOTAL NUHBER OF COPIES REQUIRED: LTTR ~ ENCL

80050809gy TWO HORTH HINTH STREET, ALLENTOWH, PA. 18101 PHOHEt (215) 821-5151 NORMAN W. CURTIS Vice President En jineering 8 Constructicn 821.5381 April 30, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION STATUS UPDATE OF DEFICIENCIES INVOLVING PGCC CABLE CONNECTORS (MCAR 1-29)

ER'00450 FILE 840-4 PLA-477

References:

PLA-437 dated 01/08/80 PLA-313 dated 01/15/79 PLA-301 dated ll/14/78

Dear Mr. Grier:

This letter serves as a supplement to our earlier correspondence on the above listed subject. since PPIi'L and Bechtel Engineering are still in the process of evaluating the cause and corrective actions necessary to resolve the defective conditions, our final report on the deficiencies involving damage to cable connectors will be temporarily delayed.

I We anticipate providing a final report on the subject deficiencies in July, 1980.

Very truly yours, g 0/g N. W. Curtis '

Vice President-Engineering 6 Construction ARS:mcb cc: Mr. Victor Stello (15)

Director-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information a Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 PE N N 5 Y L VA H I A P 0 WE R 8 LIGHT C 0 Iri P A H T

Mr. Boyce H. Grier April 30, 1980 cc: Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. 0. Box 52 Shickshinny, Pennsylvania 18655