ML18017A159

From kanterella
Jump to navigation Jump to search
Notifies That Status Update of Deficiencies Involving Pgcc Cable Connectors Will Be Temporarily Delayed,Due to Extensive Evaluating Process.Final Rept Will Be Submitted Jul 1980
ML18017A159
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/30/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
840-4, NUDOCS 8005080347
Download: ML18017A159 (3)


Text

REGULA TOrE INFORMAT IOr4 DISTRIBUT ION fSTEM (BIDS)

ACCESSION NBR:8005080307 DOC CHOATE: 80/04/30 NOTARIZED:

NO FACI

-susquehanna Steam EleCtriC Station<, Unit 1P Pennsylva 0

388 4squehanna Steam Electric Stationi Unit Zs Pennsylva AUTHOR AFFILIATION C RTISP N,'A, Pennsylvania Power 8 Light Co.

REC IP r4Ab1E REC IP IENT AFFILIATION GRIER,B,H.

Region li Phi ladelphiag Office of the Director

SUBJECT:

'4otifies that status update of deficiencies involving PGCC cable connectors will be temporarily delayedidue to extensive evaluating process. Final rent will be submitted Jul 1980

'OCKET 05000387 05000388 DISTRISUTION CODE:

80198 COPIES RECEIVED:LTR Q ENCL + SIZE:~~

TITLE: Constr uct ion Oef iciency Report (10CFRSO

~ 55E) r4OTES: S~OP RECIPIENT ID CODE/NAKE ACTION:

14 PH W//r/+g 20 LA 4.ulg 4/+

mC <ML>~u74 COP IES RECIPIENT LTTR EN L

ID CODE/NA~E 1

15 BC l Cc/g +Q 1

21 AD 4aJ)P COPIES LTTR ENCL INTERNAL:

REG FILE 08 HPA 10 QAB 13F IELD COOR/IE 17 AO PLANT SYS Z2 DIR DPH AD/RCI/IE AEOO GEOSC IENCES BR IH C SYS BR MECH ENG BR STRUCT ENG BR EXTERNAL! 03 LPDR 24 ACRS 1

2 1

1 1

1 1

1 1

1 1

1 1

1 1

16 1

02 NRC PDR 07 EOO lm STAFF 09 DEPY DIR DPM 11 STANDROS OEV 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD AD/SITE TECH DIRECTOR OSE HAr4AUERzS ~

NATL ENG BR POi'rER SYS BR 04 NSIC C.~

~ed RM 6/8 ~~me.

s. 88cu8 8 wacA 1

1 1

1 1

1 1

1 1

1 1

1 MPY g

TOTAL NUHBER OF COPIES REQUIRED:

LTTR ~

ENCL

80050809gy TWO HORTH HINTH STREET, ALLENTOWH, PA.

18101 PHOHEt (215) 821-5151 NORMAN W. CURTIS Vice President Enjineering 8 Constructicn 821.5381 April 30, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION STATUS UPDATE OF DEFICIENCIES INVOLVING PGCC CABLE CONNECTORS (MCAR 1-29)

ER'00450 FILE 840-4 PLA-477

References:

PLA-437 dated 01/08/80 PLA-313 dated 01/15/79 PLA-301 dated ll/14/78

Dear Mr. Grier:

This letter serves as a supplement to our earlier correspondence on the above listed subject.

since PPIi'L and Bechtel Engineering are still in the process of evaluating the cause and corrective actions necessary to resolve the defective conditions, our final report on the deficiencies involving damage to cable connectors will be temporarily delayed.

I We anticipate providing a final report on the subject deficiencies in July, 1980.

Very truly yours, N.

W. Curtis Vice President-Engineering 6 Construction g 0/g ARS:mcb cc:

Mr. Victor Stello (15)

Director-Office of Inspection

& Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. G. McDonald, Director Office of Management Information a Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 P E N N 5 Y L VA H I A P 0 W E R 8

LIGHT C 0 Iri P A H T

Mr. Boyce H. Grier April 30, 1980 cc:

Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. 0. Box 52 Shickshinny, Pennsylvania 18655