UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 26, 1999 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power 8 Light Company Post Office Box 165, Mail Code: Zone 1
New Hill, North Carolina 27562-0165
SUBJECT:
COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01, "TESTING OF SAFETY-RELATED LOGIC CIRCUITS," DATED JANUARY 10, 1996; SHEARON HARRIS NUCLEAR POWER PLANT (TAC NO. M94683)
Dear Mr. Scarola:
On January 10, 1996, the U. S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-01, "Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction permits.
The NRC issued GL 96-01 for three principal reasons:
Notify addressees about problems with testing of safety-related logic circuits; 2.
Request that all addressees implement the actions described within the generic letter; and 3.
Require that all addressees submit to the NRC a written response regarding implementation of the requested actions.
In GL 96-01, the NRC staff specifically requested that licensees take the following actions:
~
1.
Compare electrical schematics and logic diagrams for the reactor protection system, emergency diesel generator load shedding and sequencing, and actuation logic for the engineered safety feature systems against plant surveillance test procedures to ensure that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses, and inhibit circuits, are adequately covered in the surveillance procedures to fulfillthe technical specification requirements.
This review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic circuits performing a safety function and 2.
Modifythe surveillance procedures as necessary for complete testing to comply with the technical specifications.
Additionally, the licensee may request an amendment to the technical specifications ifrelief from certain testing requirements can be justified.
Furthermore, the NRC staff required that addressees prepare and submit the following:
1.
a written response indicating whether or not the licensee would implement the actions requested above or propose an alternative action; 2.
a schedule for completing the requested actions or proposed alternative; and 3.
a response confirming completion of the requested actions.
WVOSoaOOSO ev052S PDR ADOCK 05000400 p
~-
H 0
-v
J. Scarola May 26, 1999 In response to GL 96-01, you provided letters dated April 16, 1996, January 21, 1997, and May 4, 1999, for the Shearon Harris'uclear Power Plant. These submittals provided both the information requested and the responses required by GL 96-01; therefore, TAC No. M94683 is closed.
Sincerely, Original signed by:
Docket No. 50-400 cc: See next page Distribution:
Docket Fjle g PD II Rdg PUBLIC OGC Richard J. Laufer, Project Manager, Section 2 Project Directorate II Division of Licensin'g Project Management Office of Nuclear Reactor Regulation HBerkow BBonser, Rll JZwolinski/S Black ACRS FILENAME-G:>HARRIS)LTR94683.WPD OFFICE PM:PDII/S2 LA:PDII/S2 EEIB SC: PDII/S2 SPetersoh
</</99 Yes o
EDun n
on HGarg iV~~
NAME RLaufer e /No e
No Yes/No COPY OFFICIAL RECORD COPY DATE
/ [5 /99 5/ lg /99 5/A/99 In response to GL 96-01, you provided letters dated April 16, 1996, January 21, 1997, and May 4, 1999, for the Shearon Harris Nuclear Power Plant. These submittals provided both the information requested and the responses required by GL 96-01; therefore, TAC No. M94683 is closed.
Sincerely, Richard J. Laufer, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-400 cc: See next page
Mr. James Scarola Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant Unit 1 CC:i Mr. William D. Johnson Vice President and Corporate Secretary Carolina Power 8 Light Company Post Office Box 1551 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Karen E. Long Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Public service Commission State of South Carolina Post Office Drawer Columbia, South Carolina 29211 Mr. Mel Fry, Director Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Dr.
Raleigh, North Carolina 27609-?721 Mr. Terry C. Morton Manager Performance Evaluation and R'egulatory Affairs CPB 9 Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Bo Clark Plant General Manager - Harris Plant Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P.O. Box 165 New Hill, North Carolina 27562-0165 Mr. John H. O'eill, Jr.
Shaw, Pittman, Potts 8 Trowbridge 2300 N Street, NW.
Washington, DC 20037-1128 Mr. Chris L. Burton Director of Site Operations Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1
New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC Post Office Box 29520 Raleigh, North Carolina 27626 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. Vernon Malone, Chairman Board of County Commissioners of Wake County P.
O. Box 550 Raleigh, North Carolina 27602 Mr. Richard H. Givens, Chairman Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Ms. Donna B. Alexander, Manager Regulatory Affairs Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Johnny H. Eads, Supervisor Licensing/Regulatoty Programs Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165