Text
CATEGORY 2
REGULATORY INFORMATXON-DXSTRXBUTION.SYSTEM (RXDS)
SSION NBR:9811090272
DOC.DATE: 98/10/23
NOTARIZED: NO
CIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATXON
BONSER,BE R.
Region
2
(Post. 820201)
RECIP.NAME
RECIPIENT AFFXLXATION
SCAROLA,J.
Carolina Power
6 Light Co.
DOCKET
05000400
SUBJECT: Forwards insp rept 50-400/98-08
on980816-0926
&, NOV.
Violations of concern because
when viewed cooectively with
previous
NRC violations
&. finding by staff, exemplify broader
problem with corporate office.
DISTRIBUTION CODE: IEOIF
COPIES
RECEIVED: LTR
t
ENCL L
SIKE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
E
NOTES:Application for permit renewal filed.
o5ooo4oo ~
INTERNAL:
RECIPIENT
ID CODE/NAME
PD2-1
FILE
ENTE
NRR DRPM PECB
NUDOCS-ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPXENT
ID CODE/NAME
FLANDERSFS
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
EXTERNAL: LITCO BRYCE,J H
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
D
L0ggPD PRQN
PLF.CTRONC FtLF-
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
.OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
I
October
23,
1998
r
EA 98431
Caroliria Power & Light Company
ATTN: Mr. James Scarola
Vice President - Harris Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code: Zone 1
New Hill, NC 27562-0165
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-400/98-08
Dear Mr. Scarola:
This refers to the inspection conducted on August 16 through September 26, 1998, at the
Shearon Harris facility. The enclosed report presents the results of that inspection.
During the six-weeks covered by this inspection period, your conduct of activities at the
Shearon Harris plant was generally characterized by safety conscious operations and
conservative decision making.
Based on the results of the inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation are described in detail in the enclosed report. The
violation is of concern because when viewed collectively with previous NRC violations and
findings by your staff, they exemplify a broader problem with your corpoiate office consistently
adhering to applicable regulatory requirements.
Although your immediate corrective actions to correct the violation were adequate, you are
required to respond to this letter and should followthe instructions specified in the enclosed
Notice when preparing your response.
Due to the concern described above regarding your
corporate office your response should include a discussion of the broader issue; The NRC will
use your response,
in part, to determine whether further enforcement action is necessary to
ensure compliance with regulatory requirements.
,r <>
f
C
lg wi
cy81 109'0272 ~
~00
pDR
ggocK 0
8
OFFICIAL COPY
~'
CPRL
2
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure(s), and your response
willbe placed in the NRC Public Document Room (PDR).
Sincerely,
Orig s igned
by Brian R. Bonser
Docket No.
License No.
50-400
Brian R. Bonser, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Enclosures:
2. Integrated Inspection Report
cc w/encls: (See page 3)
cc w/encls:
D. B. Alexander, Manager
Performance Evaluation and
Regulatory Affairs CPB 9
Carolina Power & Light Company
P. O. Box 1551
Raleigh, NC 27602-1551
Bo Clark
Plant General Manager-Harris Plant
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
P. O. Box 165
New Hill, NC 27562-0165
Chris A. VanDenburgh, Manager
Regulatory Affairs
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 1
New Hill, NC 27562-0165
Johnny H. Eads, Supervisor
, Licensing/Regulatory Programs
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
P. O. Box165, Mail Zone
1
New Hill, NC 27562-0165
William D. Johnson
Vice President & Senior Counsel
Carolina Power & Light Company
P. O. Box 1551
Raleigh, NC 27602
Mel Fry, Director
Division of Radiation Protection
, N. C. Department of Environmental
Commerce & Natural Resources
3825 Barrett Drive
Raleigh, NC 27609-7721
Karen E. Long
Assistant Attorney General
State of North Carolina
P. O. Box 629
Raleigh, NC 27602
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Chairman of the North Carolina
Utilities Commission
P. O. Box 29510
Raleigh, NC 27626-0510
Robert P. Gruber
Executive Director
Public Staff NCUC
P. O. Box 29520
Raleigh, NC 27626
Stewart Adcock, Chairman
Board of County Commissioners
of Wake County
P. O. Box 550
'aleigh, NC 27602
Margaret Bryant Pollard, Chairman
Board of County Commissioners
of Chatham County
P. O. Box 87
Pittsboro, NC 27312
Distribution w/encls:
L. Plisco, Rll
M. Ernstes, Rll
J. Coley, Rll
S. Flanders, NRR
R. Baldwin, Rll
J. Lenahan, Rll
D. Jones, Rll
D. Thompson, Rll
PUBLIC
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
5421 Shearon Harris Road
New Hill, NC 27562-9998
SIGNATUR
NAME
GMacDonald
JBrady
RHagar
WRcger
ABoland
DATE
COPY?
10/
/98
10/
/98
10/
/98
10/<+98
10/
/98
10/
/98
YES
NO
YES
NO
NO
YES
NO
YES
NO
YES
NO
OFFICIALRECORD COPY
DOCUMENT NAME: I:%PB4WARRIS(REPORT%808HAR.WPD
10/
/98
YES
NO
CPKL
Distribution w/encls:
L. Plisco, Rll
M. Ernstes, Rll
J. Coley, Rll
S. Flanders, NRR
R. Baldwin, Rll
J. Lenahan, Rll
D. Jones, Rll
D. Thompson, R
PUBLlc
~o
NRC Res'nt Inspector
U. S.
clear Regulatory Commission
5421
hearon Harris Road
N
Hill, NC 27562-9998
SIGNATUR
NAME
GMacDonald
J Brady
RHagar
WRogers
DATE
COPY'P
10/
/98
10/
/98
1
98
10/
/98
YES
NO
10/
/98
YES
NO
YE
NO
YE
NO
YES
NO
YES
NO
0
ICIALRECORD COPY
DOCUMENTNAME: IARPB4WARRI
%9808HAR.WPD
10/
/98
YES
NO
CPKL
Distribution w/encls:
L. Plisco, Rll
M. Ernstes, Rll
J. Coley, Rll
S. Flanders, NRR
R. Baldwin, Rll
J. Lenahan, Rll
D. Jones, Rll
D. Thompson, Rll
J. Lieberman'OE
B. Summers, OE
PUBLIC
NRC Resi
nt Inspector
U. S. Nu ear Regulatory Commission
5421
earon Harris Road
New
ill, NC 27562-9998
- (See previous concurrence)
SIGNATUR
NAME
DATE
GMacDonald
10/
/98
JBrady
10/
/98
RHagar
10/
/98
WRogars
10/
/98
ABoland
10/
/98
10/
/98
10/
/98
CO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIALRECORD COPY
DOCUMENT NAME: IARPB4LHARRIQREPOR7%808HAR.WPD
YES
NO
THU,
OCT-22-98
3:48PN
US
NRG
919 362 8648
R. Baldwin, Rll
J. Lenahan, Rll
D. Jones, Rll
D. Thompson, Rll
PUBLIC
NRC Resld
t inspector
U.S. Nuc
r Regulatory Commission
5421 8
aron Harris Road
New
II, NC 27562-9998
OF
Rl
IO'/RlL
NQ
OFF JCIAI. RRIXRD lXPT
I MAIS:
CIQP5'l QQXRNT'5%OS WO
TOTAL P. 81