Text
R<Gy po 4
0
++*++
UNITED STATES 3~-<>P NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-$ 01 Septemberl1, 1998 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power 8 Light Company Post Office Box 165, Mail Code: Zone 1
New Hill, North Carolina 27562-0165
SUBJECT:
GRANTING OF RELIEF FROM THE REQUIREMENTS OF THE ASME CODE, SECTION XI ANDAPPROVAL OF THE PROPOSED ALTERNATIVETO 10 CFR 50.55a(g)(6)(ii)(A)(2) - SHEARON HARRIS, UNIT 1 (TAC NO. MA0433)
Dear Mr. Scarola:
By letter dated December 16, 1997, as supplemented June 1, 1998, Carolina Power and Light (CP8 L) requested relief from 10 CFR 50.55a(g)(6)(ii)(A)(2), which delineates the requirements for the augmented examination of the reactor pressure vessel welds, and from the requirements of Section XI of the ASME Code for the Shearon Harris Nuclear Power Plant (SHNPP).
Specifically, relief request R1-011A contained a proposed alternative to the augmented reactor vessel examination, and R1-011B requested relief from the ASME Code,Section XI examination categories B-A, B-D, and B-F for several reactor pressure vessel (RPV) welds.
After evaluation of the information submitted, the Commission has authorized the proposed alternative to the augmented examination of the RPV welds in accordance with the provisions of 10 CFR 50.55a(g)(6)(ii)(A)(5) and 10 CFR 50.55a(a)(3)(ii), and has granted relief from the requirements of Section XI of the ASME Code pursuant to 10 CFR 50.55a(g)(6)(l). The proposed alternative contained in relief request R1-011A is authorized on the basis of the determination that CP&L could not satisfy the augmented exam requirements and that the examination already performed provides an acceptable level of quality and safety by providing reasonable assurance of the continued structural integrity of the subject RPV welds. Therefore, compliance with the requirements of 10 CFR 50.55a(g)(6)(ii)(A)(2) would result in hardship without a compensating increase in the level of quality and safety.
Relief request R1-011B is granted on the basis that meeting the ASME Code examination coverage for the RPV welds contained in the subject CP8L submittals is impractical and the examinations completed on the subject welds, as well as full Code-required examinations completed on other RPV welds provide reasonable assurance that any degradation of the subject welds would have been detected.
These reliefs are granted for the first 10-year inspection interval. The relief granted is authorized by law and will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result ifthe requirements were imposed.
\\)
~ QplQ9 9809ihOi93 9809ii PDR ADOCK 05000400 P
~
h ff September 11, 1998 The NRC staff evaluation and conclusions are contained in the enclosed Safety Evaluation.
Sincerely, Original Signed by:
Pao-Tsin Kuo, Acting Project Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
as stated cc w/enclosure:
See next page
~Dis iibu io:
Docket File PUBLIC PDII-1 Reading J. Zwolinski OGC G. Hill (2)
G. Bagchi T. McLean ACRS L. Plisco, Rll NAME V/
SFla ders G:IHARRIS>HARA 4
.rel OFFICE PM:P 1
LA:PDII-1 EDunnington Bc GCB GBagchi D:PDII-1 PKuo DATE COPY filh98 Yes/No E////98 Yes No
/ )98 Yes/No
/ /98 Ye No
/I48 Yes/No OFFICIALRECORD
~,
lf L
I I
O n
Septe mber 11, 1998 The NRC staff evaluation and conclusions are contained in the enclosed Safety Evaluation.
Sincerely, Original Signed by:
Pao-Tsin Kuo, Acting Project Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
as stated cc w/enclosure:
See next page
~Di tribu ion:
Docket File PUBLIC PDII-1 Reading J. Zwolinski OGC G. Hill (2)
G. Bagchi T. McLean ACRS L. Plisco, Rll G:>HARRIS>HARA04
.rel OFFICE NAME DATE COPY PM:P
-.1/
/V/
SFlanders
//li(98 Yes/No lA:PDII-1 EDunnIngton d"iljigs Yes o
Bc GCB GBagchi n
/ 798 Yes/No
/ /98 Ye No D:PDII-1 PKuo
/l48 Yes/No OFFICIALRECORD
~
~
The NRC staff evaluation and conclusions are contained in the enclosed Safety Evaluation.
Sincerely, ao-Tsin Kuo, Acting Project Director roject Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
as stated cc w/enclosure:
See next page
Mr. James Scarola Carolina Power & Light Company Shearon Harris Nuclear Power Plant Unit 1 CC:
Mr. William D. Johnson Vice President and Senior Counsel Carolina Power & Light Company Post Office Box 1553 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuc ear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Karen E. Long Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer Columbia, South Carolina 29211 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. Mel Fry, Director Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Ms. D. B. Alexander Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Bo Clark Plant General Manager - Harris Plant Carolina Power & Light Company Shearon Harris Nuclear Power Plant P.O. Box 165 New Hill, North Carolina 27562-0165 Mr. J. W. Donahue Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1
New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC Post Office Box 29520 Raleigh, North Carolina 27626 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Chief, Reactor Projects Branch 4 U.S Nuclear Regufatory Comm.
Atlanta Federal Center 61 Forsyth Street, SW, Suite 23185 Atlanta, Georgia 30303 Mr. Stewart Adcock, Chairman Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Margaret Bryant Pollard, Chairman Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Mr. Chris A. VanDenburgh, Manager Regulatory Affairs Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1
New Hill, NC 27562-0165 Mr. Johnny H. Eads, Supervisor Licensing/Regulatory Programs Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P. O. Box165, MailZone1 New Hill, NC 27562-0165