ML18012A715

From kanterella
Jump to navigation Jump to search
NRC Jan 2018 Impractical Relief Requests and ASME Code
ML18012A715
Person / Time
Issue date: 01/16/2018
From: Stephen Cumblidge
NRC/NRR/DMLR/MPHB
To:
Rezai A, NRR-DMLR 415-1328
Shared Package
ML18002A510 List:
References
Download: ML18012A715 (20)


Text

CoverageBasedReliefRequests StephenCumblidge NRC/IndustryNDETechnical InformationExchangeMeeting January1618,2018

=

Background===

10CFR50.55a(g)(5)(iii)was originallyintendedtobeused whenASMECodechangesina waythatbringsaplantoutof compliance Theimpracticalityrulewasnot intendedtobeamultidecade solutiontobeapplied repeatedlytothesame components Licenseessubmitrepetitive reliefrequeststotheNRC, consuminglicenseeandNRC resources 2

Plants Plants ASMECode Plants Plants ASMECode Plants Plants ASMECode OriginalIntent Reality Plants Plants ASMECode

Whyover40years?

  • WhileNDEtechnologyhasimproved,manycomponent geometriesandmaterialsremainchallenging
  • Formanywelds,theobtainingcodecoveragewould requiretheredesignandmodificationofthe component
  • TheNRCstaffdoesnotsupportremovingcomponents withgoodOEfromexistingplantsoveracompliance issue
  • ThereliefrequestprocesshasworkedwellandtheNRC didnothaveamotivationtomandateachange 3

TechnicalBasisforReducedCoverageRelief Requests

  • Farsideexaminationsarenotabletodetect smallflawsreliably,butareexpectedtobe abletodetectlargeflaws
  • Operationalexperiencewithreduced coverageinspectionshasbeenfavorablein recentdecades
  • Asignificantamountofengineering judgementisused 4

SomeNotableExceptions

  • TherehavebeeninstanceswheretheNRChas grantedrelieffollowedbyflawsbeingfoundin acomponent
  • Atleastoneleakhasoccurredafterrelief
  • Nopipefailureshaveoccurredinapipe coveredinanimpracticalreliefrequest 5

NotAllCoverageisCreatedEqual

  • Somemethodsworkbetterthanothers throughaweld
  • Manualphasedarraylikelyoutperforms conventional
  • Encodedinspectionshaveadvantagesover nonencoded
  • Difficulttoquantifythedifferences 6

CurrentStatus

  • Thecurrentprocessprovidesreasonable assuranceofstructuralintegrityandleak tightness
  • Thecurrentprocessislargelybasedon operationalexperienceandengineering judgment
  • Changestothecurrentprocesswillrequirea clearunderstandingastowhythecurrent processhasbeenworkingwell 7

NRCResearch

  • WhiletheNRCand Industryhavebeen dealingwithrelief requestsfordecades, noefforthadbeen madetoquantifythe causesoftherelief requests
  • Researchwas conductedintothe maincausesofmissed coverage 8

GoalsofNRCResearch

  • Determinethemaincausesofmissed coverage
  • Determinetheflawsthatcanbedetected whencoverageislimited

- Austenitic

- Ferritic

- CASS

  • UseofModelling 9

CausesofMissedCoverage

  • Themajorityof missedcoverage examinationsare causedbysingle sided examinations 71%

29%

Single Double 10

CausesofSingleSidedExaminations

  • Themostcommon causeofsingle sided examinationsare pipetovalve configurations 42%

14%

13%

9%

6%

16%

Valve Tee Nozzle Elbow WeldOLet Other 11

FarSideExamination Howmuchofaflawhastobeinabeam beforeitcanbereliablydetected?

?

Ferritic?

Wrought?

CASS?

Conventional?

PhasedArray?

Encoded?

12

NoCornerTrap Howmuchofaflawhastobeinabeam beforeitcanbereliablydetected?

No

?

Hopefully Ferritic?

Wrought?

CASS?

Conventional?

PhasedArray?

Encoded?

13

UltrasonicModeling

  • Modelingmaybeusefulindeterminingthe effectivenessofanexamination
  • TheNRCwillhaveconfidenceintheuseof modelingwhenenoughexperimentshave beenconductedandtherelationshipbetween UTmodelingandexperimentshasbeen established 14

ReducingImpracticalReliefRequests

  • Newtechnologycanallowforcomplete coverage
  • Codecoveragerequirementscanbechanged withasufficienttechnicalbasis
  • TheNRCcanchangetherulesforhowreliefs aregiven 15

NewTechnology

  • Whilethisistheidealsolution,itis challengingtomandate
  • Evenifthenewtechnologyemerges tomorrow,itwouldtakemanyyearstoreach thefield 16

ChangestoASMECode

  • N7111willlikelyeliminate70%ofpiping reliefrequests
  • Theremaining30%willbecomplexcasesthat mayrequireNRCreview
  • TheNRCwilladdressotherpossiblechanges astheyarise 17

CodeCaseN7111

  • N7111redefinesthe requiredinspectionvolume insomecases
  • N7111ismosteffectiveat reducingreliefrequestsfor singlesidedexaminations
  • N7111islessusefulfor othertypesofobstructions, suchaspartialobstructions oftheentireweldwidth 18

X

Changesto10CFR50.55a

  • TheNRCstaffhavebeenexploringpossible changestohowimpracticalreliefrequests, especiallyrepetitivereliefrequests,are handled
  • Onechallengeistocraftrulesthathandlenew reactors,existingreactors,andnovelreactor designs 19

PathForward

  • TheNRCstaffisconductingresearchinto determiningtheeffectivenessofexaminations withmissedcoverage
  • TheNRCstaffvotedforN7111attheASME Codestandardscommittee
  • TheNRCstaffislookingintorulemakingor policychanges 20