Submits Plant Rev 1 to COLR in Support of Cycle 7 Operations Per Requirements of HNP TS 6.9.1.6.4
ML18011B035
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/10/1995
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18011B036 List:
References
HNP-95-089, HNP-95-89, NUDOCS 9510190002
Download: ML18011B035 (4)


Text

P PRIORITY 1 j) (ACCELERATED RZDS PROCESSING) t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9510190002 DOC.DATE: 95/10/10 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 P AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits plant Rev 1 to COLR in support of Cycle 7 operations per recpxirements of HNP TS 6.9.1.6.4.

0 DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE-TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT ~ COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 P

INTERNAL: ACRS 6 6 FILE CE TER 1 1 1 NRR/DE/EMCB 1 1 ~DRCH~/H 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR ,1 1 Di 0,

N NOTE .TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED.'OTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant OCT 1 0 ]995 United States Nuclear Regulatory Commission Serial: HNP-95-OS9 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 7 CORE OPEIUt.TING LIMITREPORT Gentlemen:

Carolina Power and Light Company (CPEcL) hereby submits the Harris Nuclear Plant (HNP)

Core Operating Limits Report (COLR), Revision 1 in support of Cycle 7 operations, per the requirements of HNP Technical Specification 6.9.1.6.4. Changes relative to the Cycle 7 core load were made to the Moderator Temperature Coefficient Surveillance Limit, the Heat Flux Hot Channel Factor (F< Z) and the Boron Concentration value required to maintain adequate shutdown margin. Additionally, Figure 1 (Shutdown Margin versus RCS Boron Concentration) has been added to the Cycle 7 COLR per the NRC's approval of Ammendment 59 to the HNP Operating License, and Figure 5 (Vz versus Core Height) has been revised to reflect the new Heat Flux Hot Channel Factor. These changes are indicated by revision bars in the right hand margin. Ifyou have any questions regarding this submittal, please contact Mr. Tom D. Walt at (919) 362-2711.

Sincerely, Enclosure c: Mr. S. D. Ebneter Mr. N. G. Le Mr. S. A. Elrod 9510190002 951010 PDR ADOCK 05000400 PDR State Road1134 NewHill NC Tel 919362-2502 Fax 919362-2095

U. S. Nuclear Regulatory Commission HNP-95-089 / Page 2 bc: T. A. Baxter, Esq Ms. P. Brannan Mr. R. K. Buckles (LIS)

Mr. W. R. Campbell (BNP)

Mr. J. W. Donahue Mr. H. W. Habermeyer, Jr.

Ms. T. A. Head (GLS File)

Mr. M. D. Hill Mr. J. W. Hindman Mr. R. M. Krich (RNP)

Mr. R. D. Martin Admiral K. R. McKee Mr. W. S. Orser Mr. G. A. Rolfson Mr. R. S. Stancil Mr. T. D. Walt Nuclear Records File: HI/A-2D File: H-X-503