HNP-95-039, Forwards Revised TS Pages VI (Index) & B 3/4 3-6 (Bases), Reflecting Changes Issued W/Amend 55,as Well as Proposed Changes in CP&L 940819 Submittal Re Radiological Effluent Tech Specs
| ML18011A898 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/30/1995 |
| From: | Robinson W CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18011A899 | List: |
| References | |
| HNP-95-039, HNP-95-39, HO-950522, NUDOCS 9504240090 | |
| Download: ML18011A898 (4) | |
Text
F'R.j:C)H.jt: EV 1
(ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9504240090 DOC.DATE: 95/03/30 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards revised TS pages vi (inde')
& B 3/4 3-6 (Bases),
reflecting changes issued w/Amend 55,as well as proposed
~ changes in CP&L 940819 submittal re radiological effluent tech specs.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:Application for permit renewal filed.
DOCKET g
05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NMSS/DWM/LLDP NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 6
6 2
2 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PD2-1 PD FILE CENTE
~
CB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED(
TOTAL NUMBER OF COPIES REQUIRED: LTTR'0 ENCL 19
Carolina Power & Light Company PQ Box 165 New Hill NC 27562 gg 30 l995 File Number: HO-950522 William R. Robinson Vice President Harris Nuclear Plant SERIAL: HNP-95-039 United States Nuclear Regulatory Commission ATTENTION; Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RADIOLOGICALEFFLUENT TECHNICALSPECIFICATIONS RETYPED TECHNICALSPECIFICATION PAGES Gentlemen:
On August 19, 1994, Carolina Power Ec Light Company (CPEcL) requested a revision to the Shearon Harris Nuclear Power Plant (SHNPP) Technical Specifications (TS) related to the Radiological Effluent Technical Specifications (RETS).
By letter dated November 3, 1994, CPS'ransmitted retyped TS pages to reflect the same changes.
On March 22, 1995, the NRC issued Amendment No. 55 to the SHNPP TS to revise TS 3/4.3.3.4, Turbine Overspeed Protection, and associated Bases to be consistent with NUREG-1431.
That amendment independently changes two pages which are currently under NRC staff review from our August 19, 1994 request.
Enclosure 1 provides revised TS pages vi (Index) and B 3/4 3-6 (Bases), which reflect the changes issued with Amendment No. 55, as well as the proposed changes in our August 19, 1994 submittal.
Accordingly, these pages should be substituted for the corresponding pages in our August 19, 1994 request.
Thus, there is no new information provided in the Enclosure.
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.
Sincerely, LSR/lsr Mr. Dayne H. Brown Mr. S. D. Ebneter Mr. S. A. Elrod Mr. N. B. Le 9504240090 950330 PDR ADOCK 05000400 P
PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095
Carolina Power & Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant File Number: HO-950522 SHUAL: HNP-95439 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RADIOLOGICALEFFLUENT TECHNICALSPECIFICATIONS RETYPED TECHNICALSPECIFICATION PAGES Gentlemen:
On August 19, 1994, Carolina Power 8c Light Company (CPEcL) requested a revision to the Shearon Harris Nuclear Power Plant (SHNPP) Technical Specifications (TS) related to the Radiological Effluent Technical Specifications (RETS).
By letter dated November 3, 1994, CP&L transmitted retyped TS pages to reflect the same changes.
On March 22, 1995, the NRC issued Amendment No. 55 to the SHNPP TS to revise TS 3/4.3.3.4, Turbine Overspeed Protection, and associated Bases to be consistent with NUREG-1431.
That amendment independently changes two pages which are currently under NRC staff review from our August 19, 1994 request.
Enclosure 1 provides revised TS pages vi (Index) and B 3/4 3-6 (Bases), which reflect the changes issued with Amendment No. 55, as well as the proposed changes in our August 19, 1994 submittal.
Accordingly, these pages should be substituted for the corresponding pages in our August 19, 1994 request.
Thus, there is no new information provided in the Enclosure.
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.
Sincerely, LSR/lsr c:
Mr. Dayne H. Brown Mr. S. D. Ebneter Mr. S. A. Elrod Mr. N. B. Le 040073 State Road 1134 New Hill NC Tel 919 362-2502 Fax 919 362-2095
I J
t C
C II