UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-000I December 12, 1994 Mr.
W.
R. Robinson, Vice President Shearon Harris Nuclear Power Plant Carolina Power 8 Light Company Post Office Box 165 Hail Code:
Zone 1
New Hill, North Carolina 27562-0165
SUBJECT:
RE(VEST FOR ADDITIONAL INFORMATION (RAI) REGARDING GENERIC LETTER 93-04, "ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CLUSTER CONTROL ASSEMBLIES, 10 CFR 50.54(f)" -
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1
TAC NO.
M86849
Dear Mr. Robinson:
By letter~ dated August 4 and September 20,
- 1993, you responded to Generic Letter (GL) 93-04.
In your response, you discussed the possibility of conducting a new current order surveillance test and a current order timing modification.
By letter dated November 10, 1994, to the Westinghouse Owners Group (WOG), the NRC staff approved the following documents:
(1) WCAP-13864, Rev.
1, "Rod Control System Evaluation Program,"
(2) Westinghouse Technical Bulletin NSD-TB-94-05-RO, "Rod Control CRDM Timing Change,"
and (3)
"WOG Recommended Rod Control System Surveillance Test."
The current order timing modification does not affect normal rod motion, but prevents asymmetric rod withdrawal should a
Salem-type failure occur.
This modification was successfully tested at the Ginna Station on April 15, 1994.
The new current order surveillance test (to be done each refueling outage) verifies that no failures exist in the Rod Control System current order circuits.
The staff finds tha~ the WOG's
- response, as discussed in the above Westinghouse documents, is an acceptable long-term resolution to GL 93-04.
The staff requests that you either commit to implement the current order timing modification and the new current order surveillance test (to be done each refueling outage),
as described in the above Westinghouse documents, prior to startup from the next refueling outage that begins later than three months from receipt of this letter, or provide an alternative long-term plan and schedule.
The staff also encourages you to consider implementation at your first opportunity.
We request your response within 30 days from receipt of this letter.
In addition, after you have implemented the current order timing modification and the new current order surveillance test, you are requested to inform the staff in writing.
The information collection contained in this request is covered by the Office of MiaIIagement and Budget clearance number 3150-0011, which expires July 31, 1997.
The public reporting burden for this collection of information is covered by the original estimate, which was estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> 9412140213 941212 PDR ADOCK 05000400 j
P PDR
W. R. Robinson, Vice President completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch (T-6 F33),
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0011),
Office of Management and Budget, Washington, DC 20503.
Sincerely, Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-400 cc:
See next page
W.
R. Robinson, Vice President December 12, 1994 completing and reviewing the collection of information.
Send comments regarding this.burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch (T-6 F33),
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0011), Office of Management and Budget, Washington, DC 20503.
Sincerely, Original signed by:
Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-400 cc:
See next page DISTRIBUTION:
Docket File PUBLIC PDII-1 R/F SVarga JZwolinski
HChatterton, NRR
- HGarg, NRR EHershoff, RII DOCUHENT NAME:
G: iHARRISiHAR86849. LTR To receive a copy of thie document, I Icate In the boxu C" ~ Copy without attachment/encioeuro E" ~ Copy with attachment/encloeure "N" ~ No copy OFFICE LAtPD21tDRP E
PHtPDI 1-1 D tPD II-1 12/ ~/94 DATE 12/
/94 NANE PDAnder son NLetmlv ISateman 12/
94 OFF CIAL RECORD COPY 12/
/94 12/
/94
/
8 c
Mr.
W.
R. Robinson Carolina Power 5, Light Company CC:
Mr. R.
E. Jones General Counsel - Legal Department Carolina Power 5 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Karen E.
Long Assistant Attorney General State of North Carolina Post Office Box 629
- Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649
- Columbia, South Carolina 29211 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St.,
N.W. Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Director Division of Radiation Protection N.C. Department of Environmental Commerce 5 Natural Resources Post Office Box 27687
- Raleigh, North Carolina 27611-7687 Mr. H.
W. Habermeyer, Jr.
Vice President Nuclear Services Department Carolina Power 8 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 Shearon Harris Nuclear Power Plant Unit 1
Admiral Kinnaird R.
McKee 214 South Morris Street Oxford, Maryland 21654 Mr. Robert D. Martin 3775 Millers Pond Way Snellville, Georgia 30278
'r. J.
W. Donahue Plant Manager Harris Plant Carolina Power 5 Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1
New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC Post Office Box 29520
- Raleigh, North Carolina 27626 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Ral eigh, North Carolina 27626-0510