ML18010B044

From kanterella
Jump to navigation Jump to search
Forwards ISI Summary First Interval,Second Period,Fourth Refueling Outage.
ML18010B044
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/01/1993
From: Mccarthy D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010B045 List:
References
NLS-93-050, NLS-93-50, NUDOCS 9303090016
Download: ML18010B044 (4)


Text

ACCELERAT DOCUMENT DIST UTION SYSTEM REGULA Y INFORMATION DISTRIBUTI YSTEM (RIDS)

ACCESSION NBR:9303090016 DOC.DATE: 93/03/01 NOTARIZED: NO DOCKET ¹ FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION MCCARTHY,D.C. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "ISI Summary First Interval, Second Period, Fourth I Refueling Outage."

DZSTRZBUTZON CODE: R047D TITLE: OR COPZES RECEZVED:LTR Submittal: Inservice Inspection/Testi g/Relief from ENCL fg SIZE: I k 80 ASME Code S

NOTES:Application for permit renewal filed. 05000400

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 1 1 LE,N 2 2 INTERNAL: ACRS 6 6 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OC LFMB 1 0 OGC/HDS1 1 0 PE~X. Ol 1 1 RES MILLMAN,G 1 1 RE~S DSIR/EIB 1 1 EXTERNAL: EGGG BROWN,B 1 1 EGSG RANSOME,C 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CON'I'ACI TIIE DOCUMEN'I'ON'I'ROL DESI, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR I'!AME FI(OM DISTRIBIJTION LISTS FOR DOCUMENI'S YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR '1 ENCL 18

~ I ~

R CNK Carolina Power & Light Company MAR Ol 893 SERIAL: NLS-93-050 United States Nuclear Regulatory Commission ATTENTIONs Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION REPORT Gentlemen:

In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6220(b), Carolina Power 6 Light Company (CPGL) hereby submits Shearon Harris Nuclear Power Plant (SHNPP) Inservice Inspection results. The enclosed report covers the inspections performed during the second of two scheduled plant refueling outages in the second period of the first inspection interval.

Please refer any questions regarding this submittal to Mr. R. W. Prunty at (919) 546-7318.

Yours very truly, c

David C. McCarthy

'anager Nuclear Licensing Section DCM/lmr (adm~tisi)

Enclosure cc: Mr. S. D. Ebneter (w/enclosure)

Mr. N. B. Le (w/o enclosure)

Mr. J. E. Tedrow (NRC-SHNPP) (w/enclosure)

Mr. Billy Walker (N.C. Dept. of Labor) (w/enclosure) t -(ayetteville Street o P. O. Box 1551 o Raleigh. N. C. 27602 lo PDR ADOCK'5000400 8 PDR

k

'I