ML18010B044
| ML18010B044 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/01/1993 |
| From: | Mccarthy D CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18010B045 | List: |
| References | |
| NLS-93-050, NLS-93-50, NUDOCS 9303090016 | |
| Download: ML18010B044 (4) | |
Text
ACCELERAT DOCUMENT DIST UTION SYSTEM REGULA Y INFORMATION DISTRIBUTI YSTEM (RIDS)
ACCESSION NBR:9303090016 DOC.DATE: 93/03/01 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION MCCARTHY,D.C.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET ¹ 05000400
SUBJECT:
Forwards "ISI Summary First Interval, Second Period, Fourth I
Refueling Outage."
DZSTRZBUTZON CODE:
R047D COPZES RECEZVED:LTR ENCL fg SIZE:
I k 8 0 TITLE: OR Submittal: Inservice Inspection/Testi g/Relief from ASME Code S
NOTES:Application for permit renewal filed.
05000400
/
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NUDOCS-ABSTRACT OGC/HDS1 RES MILLMAN,G EXTERNAL: EGGG BROWN,B NRC PDR COPIES LTTR ENCL 1
0 2
2 6
6 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EMEB OC LFMB PE~X.
Ol RE~S DSIR/EIB EGSG RANSOME,C NSIC COPIES LTTR ENCL 1
1 1
1 1
0 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CON'I'ACITIIE DOCUMEN'I'ON'I'ROLDESI, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR I'!AMEFI(OM DISTRIBIJTION LISTS FOR DOCUMENI'S YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR '1 ENCL 18
~
I
~
R CNK Carolina Power & Light Company MAR Ol 893 SERIAL:
NLS-93-050 United States Nuclear Regulatory Commission ATTENTIONs Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION REPORT Gentlemen:
In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel
- Code,Section XI, Article IWA-6220(b), Carolina Power 6 Light Company (CPGL) hereby submits Shearon Harris Nuclear Power Plant (SHNPP) Inservice Inspection results.
The enclosed report covers the inspections performed during the second of two scheduled plant refueling outages in the second period of the first inspection interval.
Please refer any questions regarding this submittal to Mr. R.
W. Prunty at (919) 546-7318.
Yours very truly, c
David C. McCarthy
'anager Nuclear Licensing Section DCM/lmr (adm~tisi)
Enclosure cc:
Mr. S.
D.
Mr. N. B.
Mr. J.
E.
Mr. Billy Ebneter (w/enclosure)
Le (w/o enclosure)
Tedrow (NRC-SHNPP)
(w/enclosure)
Walker (N.C. Dept. of Labor)
(w/enclosure)
-(ayetteville Street o P. O. Box 1551 o Raleigh. N. C. 27602 t
PDR ADOCK'5000400 8