Responds to NRC Re Violations Noted in Insp Rept 50-400/92-30.Corrective Actions:Violations Will Be Covered in Second Quarter Continuing Training for I&C Technicians, Electricians & Mechanics & Addl Training Will Be Given
ML18010B019
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/26/1993
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-804 HO-930062, NUDOCS 9303040164
Download: ML18010B019 (4)


Text

ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SION t@R:9303040164 DOC.DATE: 93/02/26 NOTARIZED: NO DOCKET 1 ar Power Pl n

nit 1

Carolina 05000400 IE

(,

ACCES ACIL.50 400 Shearon Harris Nuc e

j a tg U

AUTH.NAME AUTHOR AFFILIATION VAUGHN,G.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 930129 ltr re violations noted in insp rept 50-400/92--30.Corrective actions:violations will be covered in second quarter continuing training for I&C technicians, electricians

& mechanics

& addi training will be given.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL M SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation

~Re ponse NOTES:Application for permit renewal filed.

/

05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DEIB AEOD/TTC NRR/DOEA/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB NRR/PMAS/ILPB 2

EG 02 RGN2 FILE 01 EXTERNAL:,EG&G/BRYCEgJ.H.

NSIC COPIES LTTR ENCL 1

1 2

2 1

1 1

1, 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME LE,N AEOD AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFBPT NRR/DRSS/PEPB NRR/PMAS/ILPB 1 NUDOCS-ABSTRACT OGC/HDS1-RES MORISSEAUgD NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 D

D S

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 25 ENCL 25

l' Carolina Power & Light Company

'.O.

Box 165 ~ New Hill,NC 27562 G,E. VAUGHN Vice President Harris Nudear Plant FEB 2 6

1995 Letter Number:

HO-930062 Document Control Desk.

United States Nuclear Regulatory Commission Washington, DC 20555 NRC-804 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen In reference to your letter of January 29, 1993, referring to NRC Inspection Report RII:

50-400/92-30, the attached is Carolina Power and Light Company's reply to the notice of violation identified in Enclosure 1.

It is considered that the corrective actions taken/planned are satisfactory for resolution of the violation.

Thank you for your consideration in this matter.

Very truly yours, MGW:kls Attachment 040026 G.

E. Vaughn Vice President Harris Nuclear Plant cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. N.

B. Le (NRC-NRR)

Mr,. J.

E. Tedrow (NRC-SHNPP)

MEM/HO-930062/1/OS1 9303040164 930226 PDR ADOCK 05000400 8

PDR

Cl

Attachment to NRC-804 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/92-30 VIOLATION 400 92-30-01 Re orted Violation Technical Specification 6.8.1.a requires that written procedures be established and implemented covering pro,.edures outlined in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, paragraphs'.c and 8, require procedures for equipment control.

'dministrative procedure AP-003, General Plant Personnel Safety and Housekeeping, paragraph 5.7, and AP-020, Clearance Procedure, paragraph 5.1.6, requires that electrical equipment shall be de-energized and an equipment clearance established prior to working on electrical equipment.

Contrary to the above, on January 8,

1993, work was performed on the 480 volt power supply circuit to change the direction of rotation for fan AH-26A without prior establishment of an equipment clearance to de-energize the electrical circuit.

This is a Severity Level IV violation (Supplement I).

Denial or Admission and Reason for the Violation:

The violation is admitted.

The violation occurred during performance of post-maintenance testing following the replacement of the motor for fan AH-26A.

Upon initial fan start (bump'or rotation) there was some confusion as to whether the fan rotated in the correct direction.

Operations secured the fan by turning off the control switch.

While the situation was 'eing discussed among licensee personnel, an electrician swapped two motor leads in the fan's power supply junction box to obtain the proper direction of rotation.

No equipment clearance was obtained for the removal of the electrical motor leads.

The electrician involved admitted that the violation occurred due to inattention to detail.

The individual committing this clearance violation has never had a similar violation in approximately eleven years of service.

lt Corrective Ste s Taken and Results Achieved:

The

. individual committing the clearance violation was counseled on the requirements of site procedure AP-020, Clearance Procedure, and specifically the requirements that were not followed.

Disciplinary action was deemed necessary due to the nature and severity of the violation.

Corrective Ste s Taken to Avoid Further Violations:

This violation will be covered in second quarter continuing training for I&C technicians, electricians, and mechanics.

Additional training on AP-020, Clearance Procedure, will also be given at this time.

Date When Full Com liance Will Be Achieved:

Full compliance will be achieved by June 30,

1993, upon completion of the above mentioned training.

MEM/HO-930062/2/OS1