ML18010B015

From kanterella
Jump to navigation Jump to search
Forwards Initial Exam Rept 50-400/93-300 Administered During Wk of 930125
ML18010B015
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/19/1993
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML18010B016 List:
References
NUDOCS 9303020129
Download: ML18010B015 (6)


See also: IR 05000400/1993300

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:9303020129'OC.DATE:

93/02/19

NOTARIZED: NO

CIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

UTH.NAME

AUTHOR AFFILIATION

PEEBLES,T.A.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

WATSON,R.A.

Carolina

Power

& Light Co.

DOCKET

05000400

S

05000400J'

NOTES:Application for permit renewal filed.

SUBJECT:

Forwards initial exam rept 50-400/93-300

administered

during

wk of 930125.

DISTRIBUTION CODE:

IE42D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Operator Licensing Examination Reports

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

NRR/DRCH/HOLB10

RGN2

FILE

01

EXTERNAL: NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LEiN

HHFBPT

REG FILE

02

NSIC

COPIES

LTTR ENCL

1

1

1

0

1

1

1

1

0

R

p

D

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P!-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

10

ENCL

9

February

19,

1993

Carolina

Power

and Light Company

ATTN:

Hr. R. A. Watson

Senior Vice President

Nuclear Generation

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

SHEARON HARRIS NUCLEAR POWER

PLANT EXAMINATION REPORT

NO.

50-400/93-300

This refers to the Nuclear Regulatory

Commission

(NRC) initial examinations

led by Stephen J. Cahill during the week of January

25,

1993.

These

examina-

tions were administered

to employees of your company

who had applied for

licenses

to operate your Shearon

Harris Nuclear Plant.

At the conclusion of

the examination,

preliminary findings were discussed

with those

members of

your staff identified in the Examination Report,

Enclosure l.

A Simulator Fidelity Report is included

as Enclosure

2.

A copy of the

Facility Comments regarding the written examination is enclosed

in this report

as Enclosure

3.

The

NRC Resolution of the Facility Comments is included

as

Enclosure

4.

A copy of the written examination questions

and

answer

key,

as

noted in Enclosure

5,

was provided to members of the facility's training staff

at the conclusion of the exam.

Three Generic

Fundamentals

Examination Sections

(GFES)

have

been administered

since the last licensing examination report for the Shearon Harris Nuclear

Power Plant.

These

examinations

were administered

in February,

June,

and

October of 1992.

Your facility did not have

any candidates

who participated

in the

GFES for 1992.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of

this letter

and the enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this examination,

please

contact

us.

Sincerely,

Oloisi

Enclosures:

(See

page

2)

(Original signed by T. A. Peebles)

Thomas A. Peebles,

Chief

Operations

Branch

Division of Reactor

Safety

9303020129'30219

PDR

ADOCK 05000400

V

PDR

Carolina

Power

and Light Company

February

19,

1'993

Enclosures:

l.

Examination Report 50-400/93-300

2.

Simulator Fidelity Report

3.

Facility Comments.

on Written Examination

4,

NRC Resolution of Facility Comments

5.

Written Examination

and Answer Key

(Document Control Desk only)

cc w/encls

1, 2, 3,

and 4:

G.

E.

Vaughn

Vice President

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

C.

S. Hinnant

Plant General

Manager

Harris Nuclear Plant

P. 0.

Box 165

New Hill, NC

27562

A. Wayne Powell

Training Manager

Harris Nuclear Plant

Harris Energy

and

Environmental

Center

Route

1,

Box 327

New Hill, SC

27562

L. H. Martin, Manager

Nuclear Training Section

Harris Energy

and

Environmental

Center

Route

1,

Box 327

New Hill, NC

27562

C.

S. Olexik, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

H.

Ray Starling

Vice President

- Legal Department

Carolina

Power

and Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

(cc w/encls cont'd - See

page

3)

Carolina

Power

and Light Company

February

19,

1993.

cc w/encls

1, 2, 3,

and 4:

(cont'd.)

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

8 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Hs. Gayle

B. Nichols

Staff Counsel

SC Public Service

Commission

P. 0.

Box 11649

Columbia,

SC

29211

bcc w/encls

1, 2, 3,

and 4:

N. Le,

NRR

D. Verrelli, DRP

H. Christensen,

DRP

M. Ernstes,

DRS

S. Vias,

DRP

S. Cahill,

DRS

F. Jaggar,

INEL

Operator Licensing Branch,

NRR

U. S. Nuclear Regulatory

Commission

ATTN:

Hr. J. Tedrow, Harris Senior

Resident

Inspector

Route

1,

Box 315B

New Hill, NC

27562

bcc w/encls

1, 2, 3, 4,

and 5:

Document Control

Desk

bcc w/o encls:

INS, RII

RII:DRS

RII:DRS

SCahill:sj/sd/btm

NErnstes

02/I I /93

02//8/93

Doc:

g:~l a~harri s/1300rpt. sjc

RII:DRP

HChristensen

02/(9/93

RII:DRS

T eeb

es

02//1 /93