ML18010B002

From kanterella
Jump to navigation Jump to search
Forwards Eddy Current Exam,Carolina Power & Light Co, Shearon Harris Nuclear Plant SGs A,B & C. Rept Provides Results of SG Tube Inservice Insps Performed During Fourth Refueling Outage in Oct 1992
ML18010B002
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/08/1993
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010B003 List:
References
CON-NRC-802 HO-930056, NUDOCS 9302120018
Download: ML18010B002 (4)


Text

, ACCEI.ERAT DOCVMENTDIST UTION'SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

I ACCESSION NBR:9302120018 DOC.DATE: 93/02/08 NOTARIZED: NO FACIL:"<0-405 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VAUGHNFG,E.

Carolina Power

& Eight Co.

RECIP.NAME, RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000400

SUBJECT:

Forwards "Eddy Current Exam,Ca'rolina Power

& Light Co, Shearon Harris Nuclear Plant SGs A,B

& C." Rept provides results of SG tube inservice insps performed during fourth refueling outage in Oct 1992.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR l ENCLI SIZE:

4 C7 0 TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME Code NOTES:Application,for permit.,renewal, filed..

0500040 RECIPIENT ID CODE/NAME PD2-1 LA LE,N 1NTERNAL: ACRS NRR/DET/EMEB 7E REG FILE 01 EIB EXTERNAL EG&G BROWN F B NRC PDR COPIES LTTR ENCL 1

0 2

2 gg E

1 1

1 0

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES MILLMANFG EG&G RANSOMEFC NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

0 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI 9

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL

/ 4 l

I 1

V P

s, t

1 I

I a

~f*

l

~PC rs Carolina Power & Light Company P.O. Bex 166 ~ New Hill~ NC 27662 G.E. VAUGHN Vice President Harris Nuctear Plant FEB -

B 1995 Letter Number:

HO-930056 NRC - 802 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 SPECIAL REPORT STEAM GENERATOR TUBE IN-SERVICE INSPECTION RESULTS Gentlemen:

In accordance with Technical Specifications 4.4.5.5.b and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company hereby submits this Special Report.

This Special Report provides the results of the steam generator tube in-service inspections performed during the Harris Plant's fourth refueling outage in October 1992.

Very truly yours, Vice President Harris Nuclear Plant MGW:kls Enclosure cc:

Mr. N. B. Le (NRR)

Mr. S.

D. Ebneter (NRC - RII)

Mr. J.

E. Tedrow (NRC-SHNPP)

MEM/HO-930056/1/OS1 9302120018 930208 PDR

  • DOCK 05000400 8,:

PDR t

~ P fg