ML18010A990

From kanterella
Jump to navigation Jump to search
Forwards Final SALP Rept 50-400/92-20 for 910602-920926 & Discusses 930107 Licensee Comments Re Subj Rept.Performance Identified as Very Good for Facility.Viewgraphs Encl
ML18010A990
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/15/1993
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML18010A991 List:
References
NUDOCS 9302020124
Download: ML18010A990 (28)


See also: IR 05000400/1992020

Text

REGULATORY INFORMATION DISTRZBUTION SYSTEM (RIDS)

ACCESSION NBR:9302020124

DOC.DATE: 93/01/15

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear Power-Plant,

Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

EBNETER,S.D.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT

AFFIL'IATION'ATSON,R.A.

Carolina

Power

6 Light Co.

DOCKET

05000400

S

0500040

SUBJECT:

Forwards final SALP rept 50-400/92-20 for 910602-920926

6

discusses

930107 licensee

comments

re subj rept. Performance

I

identified as very good for facility.Viewgraphs encl.

D

DISTRIBUTION CODE:

IE40D

COPIES

RECEIVED:LTR l ENCL g

SIZE:

6 ~3 /

TITLE: Systematic

Assessment

of Licensee

Performance

(SALP) Report

NOTES:Application for permit renewal filed.

RECIPIENT

ID CODE/NAME

PD2-1

LA

LE,N

COPIES

LTTR ENCL

1

0

1

1

RECIPIENT

,

COPIES

ID CODE/NAME

LTTR ENCL

PD2-1

PD

1

1

INTERNAL: ACRS

AEOD/DSP/TPAB

DEDRO

NRR/DLPQ/LHFBPT

NRR/DOEA/OEABll

NRR/DREP/PRPB11

NRR/DRIS/RSIB9A

NUDOCS-ABSTRACT

OGC/HDS1

RGN2

FILE

01

EXTERNAL

EGSrG/BRYCE g J

~ H ~

NRC

PDR

2

=2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/DOA

COMMISSION

NRR/DLPQ/LHFB11

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DRIS/RSGB9D

NRR/PMAS/ILRB12

OE DIR

pRIE~&

0 2

L ST LOBBY WARD

NSIC

1

1

5

5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAhIE FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

31

ENCL

30

JAN

I 5

1993

Docket No. 50-400

License

No. NPF-63

Carolina

Power

and Light Company

ATTN:

Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT'YSTEMATIC ASSESSMENT

OF

LICENSEE

PERFORMANCE

(NRC

INSPECTION

REPORT

NO. 50-400/92-20)

This refers to the

NRC's Systematic

Assessment

of Licensee

Performance

(SALP)

Report for your Harris facility which was sent to you on November

25,

1992,

our meeting to discuss

the report

on December

11,

1992,

and your written

comments

dated

January

7,

1993, relative to the report.

The

SALP Board considered

your comments

concerning

Licensee

Event Reports

and

concluded that

a change to the initial SALP Report should

be made.

Enclosed

is our summary of the December

11,

1992 meeting;

a copy of the

SALP slides;

your response

dated January

7,

1993; the

SALP Board Disposition of your

comment;

and

a revision of the initial SALP Report which constitutes

the final

SALP Report.

The performance

at your Harris facility has

been very good

and our SALP Report

indicates that your efforts have

been directed

toward the safe operation of

the unit.

We also note your continued

commitment to improve overall

performance.

No reply to this letter is required;

however,

should you have

any questions

concerning

these matters,

I will be pleased

to discuss

them with you.

Sincerely,

Original signed

by:

Stewart

D. Ebneter

Oi>i03

Enclosures:

(See

page

2)

Stewart

D. Ebneter

Regional Administrator

9302020124

930115

PDR

ADOCK 05000400

8

PDR

Carolina

Power

and Light Company

Enclosures:

1.

December

11,

1992

Meeting

Summary

2.

December

11,

1992

SALP Slides

3.

CP&L Letter

Dated January

7,

1992

4.

SALP Board Disposition

5.

Errata Sheets

6.

Final

SALP Report

cc w/encls:

G.

E.

Vaughn

Vice President

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

C.

S. Hinnant

Plant General

Manager

Harris Nuclear Plant

P. 0.

Box 165

New Hill, NC

27562

C.

S. Olexik, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

H.

Ray Starling

Vice President

- Legal

Department

Carolina

Power

and Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

5 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Ms. Gayle

B. Nichols

- Staff Counsel

SC Public Service

Commission

P. 0.

Box 11649

Columbia,

SC-

29211

bcc w/encls:

(See

page

3)

gAg>

I 5 $9~

~

~

Carolina

Power

and Light Company

bcc w/encls:

H. Christensen,

RII

N..-Le,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC

27562

The Chairman

K. C. Rogers,

Commissioner

J.

R; Curtiss,

Commissioner

F. J.

Remick,

Commissioner

.

E.

G. de Planque,

Commissioner

J.

M. Taylor,

EDO

,

H.

H. Sniezek,

DEDO

L. R. Plisco,

Regional

Coordinator,

EDO-

T.

E. Murley,

NRR

S. Varga,

NRR

E.

G. Adensam,

NRR

N.

B. Le, "NRR

F. Allenspach,

SALP Coordinator,

NRR

Regional Administrators,

RI, RIII

RIV, and

RV

K. Clark, RII,

PAO

D.

M. Verrelli, DRP, RII

D. J.

Roberts,

DRP, RII

S. J. Vias,

TSS, RII

DRS and

DRSS Branch Chiefs,

and Section Chiefs

RI I: DRP

RI I: DRP

HC ristensen

DVerrelli

Ol/(@93

01/p/93

RI I:DgP

~ EMhrlchoff

01/ ~> /93

C

RI

.'yeg

0'1/~ l(93

ENCLOSURE

1

- A.

A meeting

was held at 1:00 p.m.

on December

11,

1992,

at the Harris

Energy

and Environmental

Center,

near

New Hill, North Carolina, to

discuss

the

SALP Board Report for the Harris facility.

B.

Licensee Participants

S.

H. Smith,- Jr.,

Chairman

and Chief Executive Officer

W. Cavanaugh,

President

and Chief Operation Officer

R. A. Watson,

Senior Vice President

G.

E.

Vaughn,

Vice President

Harris Project

S. Hinnant, Plant General

Manager

The list of licensee

attendees

above

does not include the large

number of Carolina

Power

and Light Company employees that were

present

at the

SALP presentation.

The personnel

were supervisors,

- plant operators,

maintenance

personnel,

and various plant staff.

This large turnout was beneficial to the

SALP process

'and is highly

recommended

for future presentations.

C.

NRC Participants

L. A. Reyes,

Deputy Regional Administrator,

Region II

E.

W. Merschoff, Director, Division of Reactor Projects

E.

G,

Adensam,

Director, Project Directorate II-1, Office of Nuclear

Reactor Regulation

(NRR)

N.

B. Le, Project Hanager,

NRR

H. 0. Christensen,

Chief, Reactor Projects,

Section

No.

1A

H.

C.

Shannon,

Resident

Inspector

- Harris,

DRP

K. H. Clark, Public Affairs Officer

ENCLOSURE

2

UNITED STATES

NUCLEAR REGULATORY

CO MMlSS lO N

SYSTEM ATIC ASSESSMENT

OF

LICENSEE PERFORMANCE

{SALP)

CAROLINA POWER AND LIGHT

SALP CYCLE 10

JUNE 2, 1991

THROUGH

SEPTEMBER 26, 1992

SHEARON. HARRIS

OCTOBER 26, 1992

SALP PROGRAM OBJECTIVES

WAV,WWVAVAWWAYAVAVh VhWhVhVAVhVAV %YlhVA

+hVWAWV%VhlhVAVhWAWAWhWhVAVAVAWtVfAWAWA

WAVWWVAVAW

1. IDENTIFY TRENDS IN

LICENSEE PERFORMANCE

2. PROVIDE A BASIS FOR

ALLOCATION OF

NRC RESOURCES

3. IMPROVE NRC

. RE 6 U LATORY P RQ G RAM

REGION

II

ORGANIZATION

OFFICE OF THE ADMINISTRATOR

I

ADMINISTRATOR

S. EBNETER

DEPUTY

L. REYES

DIR. E. MERSCHOFF

DEPUTY J. JOHNSON

DIR.

A, GIBSON

DEPUTY (VAGANTI

DIVISION OF

DIVISION OF

REACTOR PROJECTS

REACTOR SAFETY

DIVISION OF

RADIATION SAFETY

, AND SAFEGUARDS

DIR.

J. STOHR,

DEPUTY

B. MALLETT

DIVISION OF REACTOR PROJECTS

ORGANIZATION

DIVISION OF

REACTOR PRO JECTS-

OIR. E. MERSCHOFF

0

DEPUTY

J. JOHNSON

REACTOR PROJECTS

BRANCH N0,1

CHIEF

D. VERRELLI

PRO JECTS

SECTION

NO, 1A

C HlEF

H. CHRISTENSEN

PRO JECTS SECTION

NO. 1B

CHIEF

F. CANTR EL L

BRUNSWICK

ROBINSON

HARRIS - SRI

J. TEDROW

FARLEY

GRAND GOLF

SUMMER

NRR

ORGANIZATION

OFFICE

OF

NUCLEAR REACTOR

REGU LATION

DIR.

T. lVIURLEY

AS S0 C.

D IRECTOR

FOR PRO JECTS

J.

PARTLOW

ASSOC.

DIRECTOR

FOR INSPECTION AND

TECHNICAL ASSESSMENT

ASSOC

DlRECTOR

FOR. ADVANCED

REACTORS AND

LICENSE RENEWAL

DIVISION OF

REACTOR PROJECTS

I/II

S. YARGA, DIR. I/II

G..LAINAS, ASST DIR. II

E. ADENSAM,

. D IR.- II/1

N. LE, PROJ.

MGR.,

HARRIS

1

PERFORIVIANCE ANALYSIS AREAS

FOR OPERATING REACTORS

A. PLANT OPERATIONS

B. RADIO10'GICAL CONTROLS

, C. MAINTENANCE/SURVEILLANCE

D. EMERGENCY PREPAREDNESS

E

E. SECURITY

4

F. ENGINEERING/TECHNICAL SUPPORT

G. SAFETY ASSESSMENT/QUALITY

YE R IF I CAT-I0 N

AR

P

CATEGORY 1

LICENSEE MANAGEMENTATTENTION TQ

AND INVOLVEMENTIN NUCLEAR SAFETY

OR SAFEGUARDS ACTIVITIES RESULTED

IN A SUPERIOR LEVEL OF PERFORMANCE.

NRC WILL CONSIDER REDUCED LEVELS

'I

OF INSPECTION EFFORT.

E

P

CATEGORY 2

LICENSEE MANAGEMENTATTENTION TO

AND INVOLVEMENTIN NUCLEAR SAFETY

OR SAFEGUARDS ACTIVITIES RESULTED

IN A GOOD LEVEL OF PERFORMANCE.

NRC WILL,CONSIDER MAINTAINING

NORMAL LEVELS OF INSPECTION

EFFORT.

J

~

~

APE

R

CATEGORY 3

LICENSEE MANAGEMENT ATTENTION TO

AND INVOLVEMENTIN NUCLEAR SAFETY

OR SAFEGUARDS ACTIVITIES RESULTED

lN AN ACCEPTABLE LEVEL OF PERFORMANCE;

HOWEVER, BECAUSE OF THE NRC'S CONCERN

THAT A DECREASE IN PERFORMANCE MAY

APPROACH OR REACH AN UNACCEPTABLE

LEVEL, NRC WILL CONSIDER INCREASED

LEVELS OF INSPECTION EFFORT.

AL ATI

I

E

I

1. MANAGEMENT INVOLVEMENTAND CONTROL

IN ASSURING QUALITY

2; APPROACH TO IDENTIFICATION AND

RESOLUTION OF TECHNICAL ISSUES

FROM A SAFETY STANDPOINT

3. ENFORCEMENT HISTORY

4. REPORTING, ANALYSIS AND CORRECTIVE

ACTION OF REPORTABLE EVENTS

5. STAFFING {INCLUDINGMANAGEMENT)

6.*TRAINING EFFECTIVENESS AND

QUALIFICATIO N

~

~

(CATEGORY

1

DECLINING)

OVERALL PERFORMANCE IN THIS AREA WAS

EXCELLENTWITH A DECLINING TREND NOTED

STRENGTHS

'

MANAGEMENT1NVOLVEMENT

4 STAFF PROFESSIONALISM

+ PLANT PERFORMANCE

~ COMM0 NICATION

~ lNNOVATION

~ HOUSEKEEPING

CHALLENGES

'PERATOR PERFORMANCE

'TTENTION TO OETAlL

CTCLI100r ~

~

~

MAINTEN ANCE!Su RVElLLANc E

(CATEGORY 2 IMPROVING)

OVERALLPERFORMANCE IN-THIS AREA REMAINED

GOOD WITH AN IMPROVING TREND NOTED

/

STRENGTHS

~ MANAGEMENT INVOLVEMENT

~ STAFF PROFESSIONALISM

~ PLANNING

~ PROGRAMS

PREVENTIVE MAINTENANCE

POST MAINTENANCETESTING

SURVEILLANCE

CHALLENGES

~ EQUIPMENT PERFORMANCE

'ERSONNEL ERRORS

RADIOLOGICALCONTROL

(CATEGORY

1 j

OVERALL PERFORMANCE IN THE AREA

REMAINED EXCELLENT

STRENGTHS

~ DOSE MANAGEMENT

STAFF PROFESSIONALISM

'RAINING

~ WATER CHEMISTRY PROGRAM

~ ENVIRONMENTALMONITORING PROGRAM

CHALLENGES

'PENT FUEL POOL CONTAMINATION

~ POST ACCIDENT SAMPLING SYSTEM

~ EFFLUENT MONITORS

~

~

EMERGENCY PREPAREDNESS

(CATEGORY 1)

OVERALL-PERFORMANCE IN THIS AREA

REMAlNED EXCELLENT

STRENGTHS

~ MANAGEMENTINVOLVEMENT

'TAFF PROFESSIONALISM

~ PERFORMANCE

CHALLENGES

~ EQUIPMENT PERFORMANCE

~ ATTENTION TO DETAIL

\\

~

~

(CATEGORY

1 j

'OVERALLPERFORMANCE IN THIS AREA

REMAINED EXCELLENT

STRENGTHS

~ MANAGEMENTINVOLVEMENT

~ STAFF PROFESSIONALISM

'YSTEM CAPABILITIES

.CHALLENGES

'AINTAINING PERFORMANCE

ENGINEERINGlTECHNICAL SUPPORT

(CATEGORY 1 j

OVERALLPERFORMANCE IN THIS 'AREA

REM'AINED EXCELLENT

STRENGTHS

SUPPORT TO OPERATIONS

~ OUTAGE PLANNING

'HUTDOV/NRISK MANAGEMENT

~ CONTROL OF MODIFICATIONS

'

MOV PROGRAM

CHALLENGES

~ ATTENTION TO DETAIL

CIC\\ ~ CSS

,SAFETY ASSESSMENT/QUALITY VERIFICATION

{CATEGORY 2)

OVERALL PERFORMANCE IN THIS AREA

WAS GOOD

STRENGTHS

~ MANAGEMENTINVOLVEMENT

=

~ SAFETY REVIEWS

~ LICENSING SU BMITTALS

CHALLENGES

QUALITYASSURANCE

H

SALP RATING SUMMARY

SALP CYCLES 9 AND 10

F UNCTI0 MAL

AREA

OPERATIONS

RAD CONTROL

MAINT/SURV

EMER PREP

SECURITY

ENG R/TECH

SA/QV

RATING

LAST PERIOD

RATING

THIS PERIOD.

't {DECLINING)

2 {IMPROVING)

~

~

~

~

INSPECTION HOURS/FUNCTIONALAREA

SHKARON HARRIS - CYCLE 10 / 15 MONTHS

SECURITY (74.5)

1.4%

RAD. CON (302.5)

5.7%

EMERG. PREP

{332.2)

6.3

OPERATIONS

(2687. 5)

51. 0%

MAINT./SURV (708.5,)

13.4%

ENG/TECH SUPPT

(501 . 5)

9. 5%

OTHER

{231 )

4. 4%

SA/QV (434.5)

8.2%

TOTAL =

S272.20 HOURS

6/02/9 I-9/26/92

INSII1(S. CI13

~ I

I

y

~

~

~

~

~ 0 0 ~ ~ ~ ~ ~ ~ ~

~ ttettetvteeetttette'

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0'00000VPVeoteeV0V000'Vt~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

IV0 0V0V\\V\\V0 0V0 00~

tttttttttttttet 000 ~ ttt ~ ~ tettt

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~

~ ~ ~ ~ ~ ~ ~ 0 ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~

vtvtvtvtvtvtvtvtvtv

SSS

S

~ ST

S

'IS S

S

I~ S

S

~ S

S

~ S

~

lS

S

, I!

~

~

~

~

0

~ SSSP

ISNESS

~ SSS ~

SASHES

~ SSS ~

~ S ~ S ~

~ SSS ~

~ S ~ P

~

~

~

~'0 0 0 0 0 0 0 0 0 ~ t

oeooo ~ ~ ~ ~ 0 ~ 0 0 0

V0000000Vevevet

~ ~ ~ Petto ~ ttt ~ t t

ott ttt tttttttttttttte

~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ttt \\ 0 ~ tttttttt

Vt ~ ~ ~ ~ t 0 ~ ~ ~

tee eeeeteeeeeeettootoe

~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~

000VtveteteteVete

00Vtttotttttttttttttt

00 tttettttetttttVttt